Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹34.9 LAccepted-AOC | L 1 | Accepted-AOC L 1 | |
| 2 | L 2₹37.2 L+₹2.3 L (6.56%)Rejected-Finance 205 RAHUL PALACE CHS LTD JESAL PARK BHAYANDER EAST THANE MAHARASHTRA 401105 | PALGHAR | MAHARASHTRA | 401105 | L 2 | Rejected-Finance L 2 | |
| 3 | L 3₹37.7 L+₹2.8 L (7.97%)Rejected-Finance | L 3 | Rejected-Finance L 3 | |
| 4 | L 4₹38.4 L+₹3.5 L (10.1%)Rejected-Finance | L 4 | Rejected-Finance L 4 | |
| 5 | L 5₹41.1 L+₹6.2 L (17.7%)Rejected-Finance | L 5 | Rejected-Finance L 5 |
Tender Value
Refer Docs
Closing Date
27 Dec 2021, 5:00 pmClosed
Chief Engineer (EM IT)
DCSE, 3rd Floor, V.S. Bhavan, Anushaktinagar, Mumbai - 400094.
Annual contract for Operation and Comprehensive maintenance of 0.5 MLD MBBR based STP near Brindavan Building and 103.5KLD, 3Nos X 34.5 KLD, RBC technology base STP near Akashganga Building in Anushaktinagar, Mumbai.
2021_DCSEM_662839_1
DCSEM/CQD/QSC/ STP-Br-Ak-AMC/NIT/22/21-22 dtd 13.
Open Tender
AMC/ Maintenance Contracts
Item Rate
Anushaktinagar, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
17 Oct 2022
14 Dec 2021
29 Dec 2021
14 Dec 2021
27 Dec 2021
14 Dec 2021
14 Dec 2021 - 21 Dec 2021
Amount
PART-A: PLANT OPERATION & ASSOCIATED WORKS
PART-B: COMPREHENSIVE MAINTENANCE & ASSOCIATED WORKS
PART-C: ASSOCIATED WORKS OF STP
PART- D- Plant Operation of 103.5 KLD
Description of Work / Item(s)
Amount
PART-A: PLANT OPERATION & ASSOCIATED WORKS
Operation of 0.5 MLD (500 KLD) MBBR technology based Sewage Treatment Plant (STP) of M/s. Ion Exchange (I) Ltd. near Brindavan Building in daily three shifts i.e. 24x7x365 days basis for Twelve months as per schedule. The scope of works also include recording of the various operating parameters in required format (i.e. operational log sheet) to be submitted before start of work and informing any abnormal parameters like abnormal readings of the various measuring instruments, safeguarding of the equipment’s from any damage due to their running at abnormal conditions, excessive noise or vibration in the equipment, smell or abnormal heating etc. to the Engineer-In-Charge or his deputed representative all as per the specification enclosed and as per the direction of the Engineer-In-charge (E.I.C.) Note: Bleaching powder & phenyl shall be paid under relevant items of SOQ. The work shall be executed as per clause no. 1 of Schedule I of Specifications.
Supply of Sodium hypo chloride solution ( 10 % to 15% concentration of Chlorine) at required proportion as per instruction of EIC.
Bleaching powder
Phenyl
Description of Work / Item(s)
Amount
PART-B: COMPREHENSIVE MAINTENANCE & ASSOCIATED WORKS
Comprehensive maintenance of following pump sets as per Clause no. 3 of Schedule I of specifications
Raw sewage pumps ( 2 Nos. x 4 times in one year)
Submersible Sewage pumps( 3 Nos. x 4 times in one year)
Overhead Flushing tank Pumps ( 2 Nos. x 4 times in one year)
Gardening Pumps ( 2 Nos. x 4 times in one year)
Filter Feed Pumps ( 2 Nos. x 4 times in one year)
Sludge Transfer Pumps ( 2Nos. x 4 times in one year)
Screw Pumps ( 2 Nos. x 4 times in one year)
Chlorine dosing pumps ( 2 Nos. x 4 times in one year)
Poly Dosing Pumps ( 1 No. x 4 times in one year)
Dewatering Pump ( 1 No. x 4 times in one year)
Comprehensive maintenance of Air Blowers as per Clause no. 4 of Schedule I of specifications
Air Blower for MBBR tank, equilisation & Sludge Holding tanks ( 2 Nos. x 4 times in one year)
Comprehensive maintenance of Filter Press as per Clause no. 5 of Schedule I of specifications
Filter Press with motor ( 1 No. x 4 times in one year)
Comprehensive maintenance of Ozonator (Ozone Generating Equipment) as per Clause no. 6 of Schedule I of specifications Note: Maintenance of Ozonator should be carried out by service team of Original manufacturers M/s. ORAIPL.
Ozonator sets (1 Nos. x 4 times in one year)
Comprehensive maintenance of (UV) Ultraviolet light as per Clause no. 7 of Schedule I of specifications. Note1: The scope of works excludes replacement & SITC of ballast, UV lamp & Quartz Sleeve for UV units & the same will be measured as per Item No. 7 of part-C of Schedule of Quantities. Note 2: Maintenance of UV light should be carried out by service team of Original manufacturers M/s. UV Alfa.
UV light sets ( 1 Nos. x 4 times in one year)
Pressure sand filter & Activated carbon filter and associated works as per Clause no. 8 of Schedule I of specifications.
Pressure sand filter ( 1 Nos. x 4 times in one year)
Activated carbon Filter ( 1 Nos. x 4 times in one year)
Description of Work / Item(s)
Amount
PART-C: ASSOCIATED WORKS OF STP
Carrying out calibration of various types pressure gauges through accredited laboratory including making proper setting for within range indication if required & submitting its original calibration certificate having one year’s validity before due date complete as per site requirement
Collection of incoming sewage & outgoing effluent samples from site on monthly basis, delivery & testing of the same at NABET accredited, MOEF, MPCB or Govt. approved laboratory. Sample testing includes the parameters like PH, COD, BOD, TSS, Oil & grease, Dissolved Oxygen (D.O.) & submission of its original test report before 1st week each next month as per instruction and as directed by Engineer-In-charge (E.I.C.). Note: Sealed container for sample collection is in scope of contractor.
Carrying out complete cleaning of following RCC members of MBBR STP unit by removing all existing excretal, sewage, sludge, debris, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, removing & refixing of bar screens, carrying out all related works etc. complete as per site requirement and as directed by Engineerin-charge.
Bar screen chembers (RCC chember of size 1.2mX1mX1.5m =1.8 cum)
Oil & grease tank (RCC chember of size 3.5mX1mX3.4m= 11.9 cum)
Grit tank (RCC chember of size 3.5mX1mX3.4m= 11.9 cum)
Sewage equalization tank (RCC tank of size 8.8mX8.2mX4m= 288.64 cum)
MBBR Pre-Aeration tank (RCC tank of size 6.0mX0.9mX4.15m= 22.41 cum)
MBBR Aeration tank (RCC tank of size 6.0mX3.4mX3.35m= 68.34 cum)
Pre-lamella tank (RCC tank of size 6.0mX0.6mX3.2m= 11.52 cum)
Lamella tank (RCC tank of size 6.0mX1.5mX3.2m= 28.8 cum)
Chlorine contact tank (RCC tank of size 6.0mX2.8mX3m= 50.4 cum)
Clarified water tank (RCC tank of size 9.3mX4.3mX3.7m= 147.96 cum)
Treated water tank (RCC tank of size 9.37mX6.74mX3.7m= 233.67 cum)
Sludge holding tank (RCC tank of size 6mX2mX3.0m= 36 cum)
Supply, installation, testing & commissioning of Air bubble diffuser alongwith membrane made of M/s EDI, USA or equivalent shall consistes of set of EPDM membranes, SS 304 clips, PVC support pipes, PVC fittings, pvc flexible air pipe, nylon rope braided hose with all accessories complete for STP Reactor Aeration Chamber I & II etc. to make it retrievable & to provide clog-free oxygen for aeration tanks as per requirement & as per OEM recommendations. This work includes to carry out complete cleaning of tank to replace damaged diffuser by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C. Type of diffuser: Fine type & Air flow rate : 8 - 12 m3 / hr, Pressure Rating : HDPE/UPVC - 10 kg / cm2 , size of diffuser : 90 mm dia & 1000 mm long & MOC : EPDM. Note: Tank cleaning will be measured & paid seperately as per item no.3.6 of this SOQ.
Supply, installation, testing & commissioning of Air bubble diffuser alongwith membrane made of M/s EDI, USA or equivalent shall consistes of set of EPDM membranes, SS 304 clips, PVC support pipes, PVC fittings, pvc flexible air pipe, nylon rope braided hose with all accessories complete for Equilisation tank & Sludge holding tanks etc. to make it retrievable & to provide clog-free oxygen for aeration tanks as per requirement & as per OEM recommendations. This work includes to carry out complete cleaning of tank to replace damaged diffuser by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C. Type of diffuser: Fine type & Air flow rate : 4- 8 m3 / hr, Pressure Rating : HDPE/UPVC - 10 kg / cm2 , size of diffuser : 90 mm dia & 1000 mm long & MOC : EPDM. Note: Tank cleaning will be measured & paid seperately as per item no.3.4 of this SOQ.
Carrying out complete cleaning of lamella clarifier with inclined plate mechanism and attending all noticed issues / deficiencies in all respect including supply & fixing of all required materials/spares/hardwares, carrying out repair or replacement of all worn out / damaged parts /inclined FRP plates, carrying out all related works etc. complete as per site requirement. This work includes to carry out complete cleaning of tank to replace damaged FRP plates by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C.
Supply, installation, testing & commissioning of following items for Ultra voilet light system ( 02 Nos) as directed & as per instruction of EIC. (Make: M/s UV Alfa, Model No. HF8-HD- Flange W/UVM 5000, Auto Wiper Type)
Ballast -270104006
UV lamp - 270134027
Quartz Sleeve - 120207043
Supply, filling, setting, testing & commissioning of all required medias in appropriate quantum in Activated Carbon Filter of size 2.4m (D) x 1.875 (H) (Capacity =48m3/hr) of STP adopting standard practices / OEM recommendations including removal of all old medias, cleaning, supply & fixing of all required hardwares / spares, disposal of all old medias to drying bed of old STP, carrying out all related works etc. complete as per site requirement. Filtering Media - Activated Carbon Activated carbon filter (ACF) shall be filled with various types of filter media, which are arranged in the following order. 1. The bottom portion of the filter is filled with layers of pebbles of different sizes. a) ¾” x ½” b) ½” x 3/8” 2. The middle portion of the filter is filled with two types of silex. a) Coarse silex of size 3/8”x1/4” b) Fine silex of size ¼”x1/10” 3. The top portion of the filter is filled with Activated carbon.
Supply, filling, setting, testing & commissioning of all required medias in appropriate quantum in Pressure Sand Bed Filter of size 2m (D) x 1.875 (H) (Capacity =48m3/hr) of STP adopting standard practices / OEM recommendations including removal of all old medias, cleaning, supply & fixing of all required hardwares / spares, disposal of all old medias to drying bed of old STP, carrying out all related works etc. complete as per site requirement. Filtering Media - Graded Pebbles, Silex, Greaded filering sand ( Grading of sand should be such that particles greater than 75 micron shall not pass through filter.) Muilti grade sand filter filled with various types of filter media, which are arranged in the following order. 1. The bottom portion of the filter is filled with three layers of pebbles of different sizes. a) 1 ½” x 1” b) ¾” x ½” c) ½” x 3/8” 2. The middle portion of the filter is filled with two types of silex. a) Coarse silex of size 3/8”x1/4” b) Fine silex of size ¼”x1/10” 3. The top portion of the filter is filled with 16/32” filter sand.
Description of Work / Item(s)
Amount
PART- D- Plant Operatuion of 103.5 KLD Operation & Maintenance of 103.5 KLD (34.5 KLD X 3 NOS.) RBC technology based New Generation Packaged Sewage Treatment Plant (NGPSTP) of M/s. Ion Exchange (I) Ltd. near Akashganga Building in daily Two shifts (1st & 2nd) i.e. for Nine months ( 4 Quarters).
Comprehensive maintenance of Raw Sweage Pumps: (Total – 6 Nos.) as per clause no. 9 of Schdule I of specifications.
Comprehensive maintenance of Overhead Flushing tank pumps: (Total – 2 Nos.) as per clause no. 10 of Schdule I of specifications.
Comprehensive maintenance of Gardening Pumps : (Total – 2 Nos.) as per clause no. 11 of Schdule I of specifications.
Comprehensive maintenance of Filter Feed pumps: (Total – 6 Nos.) as per clause no. 12 of Schdule I of specifications.
Comprehensive maintenance of Sludge Transfer pumps : (Total – 6 Nos.) as per clause no. 13 of Schdule I of specifications.
Comprehensive maintenance of Screw Pumps : (Total – 2 Nos.) as per clause no. 14 of Schdule I of specifications.
Comprehensive maintenance of Chlorine Dosing Pumps: (Total – 6 Nos.) as per clause no. 15 of Schdule I of specifications.
Comprehensive maintenance of Poly Dosing Pumps: (Total – 2 Nos.) as per clause no. 16 of Schdule I of specifications.
Comprehensive maintenance of Portable submersible sewage sump pumpset: (Total – 2 Nos.) as per clause no. 17 of Schdule I of specifications.
Comprehensive maintenance of dewatering submersible drain sump pumpset : (Total – 2 Nos.) as per clause no. 18 of Schdule I of specifications.
Comprehensive maintenance of motor for NGPSTP tank with rotar assembly with motor & gear drive mechanism: (Total – 3 Nos.) as per clause no. 19 of Schdule I of specifications.
Comprehensive maintenance of Air Blowers for equalization tank: (Total – 2 Nos.) as per clause no. 20 of Schdule I of specifications.
Comprehensive maintenance of Filter Press with motor: (Total – 3 Nos.) as per clause no. 21 of Schdule I of specifications.
Comprehensive maintenance of Ozonator set: (Total – 3 Nos.) as per clause no. 22 of Schdule I of specifications.
Comprehensive maintenance of Ultraviolet light (UV) set: (Total – 3 Nos.) as per clause no. 23 of Schdule I of specifications.
Comprehensive maintenance of Pressure Sand Filter: (Total – 3 Nos.) as per clause no. 24 of Schdule I of specifications.
Comprehensive maintenance of Activated Carbon filter: (Total – 3 Nos.) as per clause no. 25 of Schdule I of specifications.
Carrying out complete cleaning of packaged NGPSTP of 34.5 KLD alongwith lamella system and attending all noticed issues / deficiencies in all respect including supply & fixing of all required materials/spares/hardwares, carrying out repair or replacement of all worn out / damaged parts , carrying out all related works etc. complete as per site requirement. This work includes to carry out complete cleaning of tank by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C.
Supply, installation, testing & commissioning of following items for Ultra violet light system (03 Nos.) as directed & as per instruction of EIC. (Make : M/s. UV Alfa, Model No. 270134049)
Painting of equipments, exposed pipeline, valves & fitting of STP Painting of STP plant & machinery like pumpset, pipeline of different sizes, all valves of different sizes ( butterfly/ NRV/ sluice / gate/ pit/ globe), gear box, motors, electrical panels, blowers etc. all equipments cover under STP. Painting of structural members like M.S. rail, platforms, M.S. supports, S.S. members, G.I. members etc. Painting shall be done by applying the two coat of red oxide as primer and after that two coats of enamel paint of approved make & shade as directed and desired by EIC. Before application of painting, external surfaces of machineries, valves, piping, fitting, accessories etc. shall be thoroughly cleaned to remove rust/scale/oil/dust by scrapping the old paint etc. This item included required painting materials required for this job & also includes the labour charges, wire brushes, emery paper, cotton, thinner, cleaner & all consumables for painting by manually or compressor painting (for electrical panels, air dryer, pipelines, motor & pump) Manual painting for all valves, base frames, safety cover etc. compressor painting for electrical panels, air dryer, pipelines, motor & pump etc. Painting is to be carried out once in a year as directed and instructed by E.I.C.
LICHENS ENVIRONMENT PRIVATE LIMITED
Aquatech Engineers
ECO CHEM SALES & SERVICE
JM Enviro Technologies Pvt. Ltd.
LICHENS ENVIRONMENT PRIVATE LIMITED
Oxybee solutions Pvt Ltd
JM Enviro Technologies Pvt. Ltd.
ECO CHEM SALES & SERVICE
LICHENS ENVIRONMENT PRIVATE LIMITED
Oxybee solutions Pvt Ltd
Aquatech Engineers
JM Enviro Technologies Pvt. Ltd.
ECO CHEM SALES & SERVICE
LICHENS ENVIRONMENT PRIVATE LIMITED
JM Enviro Technologies Pvt. Ltd.
Aquatech Engineers
ECO CHEM SALES & SERVICE
JM Enviro Technologies Pvt. Ltd.
LICHENS ENVIRONMENT PRIVATE LIMITED
Aquatech Engineers
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .