Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC | ₹29.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.1 LRejected-Finance | ₹30.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ABDUL RASHEED M K L2 | HASSAN PH L1 |
|---|---|---|---|---|---|
| 1.00Appendix -A Reactive Maintenance (Initial rectification work) | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 10.06 | cum | 2,558.72 ₹25,753.52 | 2,558.72 ₹25,753.52 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 0.36 | cum | 2,646.11 ₹957.89 | 2,646.11 ₹957.89 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 10.06 | cum | 5,588.51 ₹56,248.35 | 5,588.51 ₹56,248.35 |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 0.36 | cum | 12,594.07 ₹4,559.05 | 12,594.07 ₹4,559.05 |
| 1.00 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3.38 | cum | 3,655.42 ₹12,337.04 | 3,655.42 ₹12,337.04 |
| 1.01 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | 22.5 | sqm | 63.15 ₹1,420.88 | 60 ₹1,350 |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 240 | sqm | 12.28 ₹2,947.20 | 12.28 ₹2,947.20 |
| 1.01 | OD183009/2025-2026:Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static,
roller of 80-100 kN capacity, finished to required level and grades. By Manual means. | 240 | sqm | 284.91 ₹68,378.40 | 250 ₹60,000 |
| 1.01 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material | 1,140 | sqm | 480.59 ₹5.5 L | 480.59 ₹5.5 L |
Tender Value
₹30.1 L
EMD Value
₹50,000
Closing Date
5 Nov 2025, 2:00 pmClosed
Executive Engineer , PWD Roads Division ,Ernakulam
O/O Executive Engineer Roads Division Ernakulam
GENERAL RM 2024 25RC 2 Phase 2ClusterII One year RC Ernakulam Kalamassery RM 202425Zone 4 One year Running contract for various PWD Roads under road section Kalamasserry in Ernakulam district 16 road stretches for a length of 34.56 km General Civil
2025_PWD_812755_2
PWD/RB/TR/19323/2025_5_1_1/1
Open Tender
Civil Works - Roads
90 days
Kakkanad
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
30 Jan 2026
29 Oct 2025
7 Nov 2025
29 Oct 2025
5 Nov 2025
29 Oct 2025
Amount
Appendix -A Reactive Maintenance (Initial rectification work)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD183009/2025-2026:Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static, roller of 80-100 kN capacity, finished to required level and grades. By Manual means.
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
2.4.3.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Brick / Tile work - Dry brick pitching or brick soling
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
OD183011/2025-2026:Removing the existing vinyl sticker on the display board of Running Contract and replacing with new vinyl sticker, including lettering, symbols and transporting to site etc..as per approved drawing and direction of engineer.
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
Appendix - B Pre-monsoon works
OD183001/2025-2026:Engaging Man Mazdoor
OD183007/2025-2026:Arranging tipper /truck for transportation of timber and dumping at office premises for cleaning the site
OD183002/2025-2026:hiring chainsaw with motor for wood cutting
OD183004/2025-2026:Arranging skilled mazdoor cutting and removing trees and branches cutting
OD183006/2025-2026:Hire and running charges of light crane
OD183008/2025-2026:Hire charges of Front End loader for removing debris and other unwanted materials from roadway etc complete as per the direction of departmental officers at site
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
OD183005/2025-2026:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying bitumen emulsion using 36mm departmental broken stone and compacting with power roller to get a compact surface.(55.8.a)
OD183003/2025-2026:Filling up pothole with bituminous ready mix bituminous compound bags of weight 25kg with good quality and standards as per IS specifications, and compacting by ramming to get a compact surface including cost of material, laying charges, transportation to site etc
Appendix -C Preventive maintenance
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD183000/2025-2026:Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static, roller of 80-100 kN capacity, finished to required level and grades. By Manual means.
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
OD182999/2025-2026:OD69113/2021-2022-conducting and Reporting Routing Maintenance inspections for the entire length of the project roa at a frequency of 7 days throughout the agreement perio of the running contract as directed by the departmental officers at site.Additionl Routing Inspection may be required in response to reports or complaints from the police other authorities and the public as a result of major incience, typhoon or flooing damages etc,and are not measurable/payable.A portion of the routine inspection may be carried out either during or immediately following a period of wet weather.
Emergency works
OD183012/2025-2026:Coolies engaged for clearing accumulated silt &amp;amp; dirt from chocked up culverts and for placing shelmac in pot holes
OD183014/2025-2026:Arranging tipper /truck for transportation of timber and dumping at office premises for cleaning the site
OD183016/2025-2026:Hire and running charges of light crane
OD183013/2025-2026:hiring chainsaw with motor for wood cutting
OD183015/2025-2026:Arranging skilled mazdoor cutting and removing trees and branches cutting
ABDUL RASHEED M K (BID ID -2428560)
Bidder Name
ABDUL RASHEED M K
HASSAN PH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_1367692.xls
BOQ • 0.33 MB
bddoc.pdf
Tender Documents • 1.64 MB
performancecertificate.pdf
Additional Documents • 0.34 MB
nit.pdf
Other Document • 0.07 MB
Download all tender documents and submit your bid