Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹7.4 L+₹79,050.65 (12.0%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹8.0 L+₹1.4 L (20.8%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED |
Tender Value
₹11.3 L
EMD Value
₹34,050
Closing Date
2 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
WILDLIFE WARDEN KATHUA
NEAR COLLEGE ROAD FOREST COMPLEX KATHUA
Survey and demarcation Fixation of in situ Boundary pillars at different locations in Pounthal Forest in Co 11 JDR Pathwar in Co 9 11 12 13 JDR Chack Chilla in Co 11 JDR to 15 JDR of Surinsar Mansar Wildlife Sanctuary in Wildlife Division
2022_FD_193676_1
NIT 42 WLW/K OF 2022-23
Open Tender
Civil Works
Item Rate
45 days
Surinsar Mansar Wildlife Sanctuary
DOCUMENTS
2 documents required · 2 mandatory
₹1,000
WILDLIFE WARDEN KATHUA
₹34,050
3 Nov 2022
25 Oct 2022
3 Nov 2022
25 Oct 2022
2 Nov 2022
25 Oct 2022
Amount
Survey and demarcation, Fixation of in-situ Boundary pillars at Pounthal Forest in Co. 11/JDR Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth/height upto 1.5mtr including disposal of excavated earth upto 1mtr from cutting edge, disposed earth is to be leveled and neatly dressed All kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size inculding all Mechanical and Head load carriage with complete job
Filling available excavated earth (excluding rock) in trenches plinth sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.5 m.
Reinforcement cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of Centring and shuttering, finishing and reinforcement 1:1:5:3 (1 cement 1.5 coarse sand : 3 graded crushed stone aggregate 20 mm nominal size
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete cold twisted bars.
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014 (Nerolac)exterior emulsion paint is recommended.
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc
Carriage of materials from source to site of work by M.T a) Sand av. Distance 20 Km MT 2.3 mt HL
b) Bajri av. Distance 20 Km MT 2.3 mt HL
Survey and demarcation, Fixation of in-situ Boundary pillars at Pathwar in Co.9,11,12 & 13/JDR Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth/height upto 1.5mtr including disposal of excavated earth upto 1mtr from cutting edge, disposed earth is to be leveled and neatly dressed All kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size inculding all Mechanical and Head load carriage with complete job
Filling available excavated earth (excluding rock) in trenches plinth sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.5 m.
Reinforcement cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of Centring and shuttering, finishing and reinforcement 1:1:5:3 (1 cement 1.5 coarse sand : 3 graded crushed stone aggregate 20 mm nominal size
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete cold twisted bars.
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014 (Nerolac)exterior emulsion paint is recommended.
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc
Carriage of materials from source to site of work by M.T a) Sand av. Distance 20 Km MT 2.3 mt HL
b) Bajri av. Distance 20 Km MT 2.3 mt HL
Survey and demarcation, Fixation of in-situ Boundary pillars Pounthal at Chack Chilla in Co.11 to 15/JDR Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth/height upto 1.5mtr including disposal of excavated earth upto 1mtr from cutting edge, disposed earth is to be leveled and neatly dressed All kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size inculding all Mechanical and Head load carriage with complete job
Filling available excavated earth (excluding rock) in trenches plinth sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.5 m.
Reinforcement cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of Centring and shuttering, finishing and reinforcement 1:1:5:3 (1 cement 1.5 coarse sand : 3 graded crushed stone aggregate 20 mm nominal size
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete cold twisted bars.
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014 (Nerolac)exterior emulsion paint is recommended.
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc
Carriage of materials from source to site of work by M.T a) Sand av. Distance 20 Km MT 2.3 mt HL
b) Bajri av. Distance 20 Km MT 2.3 mt HL
M/s Rakesh Kumar
RASHPAL SINGH GOVT CONTRACTOR
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .