Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Award |
| 2 | L2₹1.3 CrRejected-Finance HIMACHAL PRADESH | ₹1.3 Cr | L2 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Akhilesh Chaudhary L1 | Kartike Guleria L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. (including pipes and pits upto all depths) in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting and trimming dressing where ever required including restoration of un-metalled surface to its original condition including cost of diversion for traffic night signals fixing caution board, crossing over trenches for access to houses and fencing etc. complete in all respect. | 527.91 | Cum | 359 ₹1.9 L | 485 ₹2.6 L |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 0.77 | Cum | 5,499 ₹4,234.23 | 6,800 ₹5,236 |
| 3.00Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size )& curing complete excluding the cost of form work and reinforcement for reinforced concrete work in: | |||||
| 3.01 | In foundation and plinth in all leads and lifts. | 46.01 | Cum | 7,499 ₹3.5 L | 9,200 ₹4.2 L |
| 3.02 | Walls (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts | 141.8 | Cum | 8,599 ₹12.2 L | 10,200 ₹14.5 L |
| 3.03 | Suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level in all leads and lifts. | 9.78 | Cum | 7,999 ₹78,230.22 | 10,400 ₹1.0 L |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frames 30x30x5mm, so as to give a fair finish including centring, shuttering ,strutting and propping etc.with wooden battens and ballies,height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ reinforced concrete and plain concrete work in:- | |||||
| 4.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster,buttresses, plinth and string courses and the like in all leads and lifts. | 730.64 | Sqm. | 309 ₹2.3 L | 380 ₹2.8 L |
| 4.02 | Flat surfaces such as soffits of suspended floors, roofs landings and the like: floors etc. up to 200 mm in thickness in all leads and lifts. | 260.76 | Sqm. | 309 ₹80,574.84 | 430 ₹1.1 L |
| 4.03 | Edges of slabs and breaks in floors and walls in all leads and lifts. | 61.52 | Rmt | 19 ₹1,168.88 | 70 ₹4,306.40 |
Updated dates
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
4 Apr 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
C/O Inlet chamber screen channel Wetwell i/c Rising Main and Pumping Machinery Atomization O and M of 0.180 MLD intermittent pumping station from Zone 8 to for 3 years and 0.300 MLD intermittent pumping station from Zone 9 to for 3 years Providing
2026_HPIPH_132521_1
23088-23187
Open Tender
Civil Works
180 days
Mandi
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
₹2.2 L
2 Jun 2026
26 Mar 2026
6 Apr 2026
26 Mar 2026
4 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation in foundation and trenches etc. (including pipes and pits upto all depths) in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting and trimming dressing where ever required including restoration of un-metalled surface to its original condition including cost of diversion for traffic night signals fixing caution board, crossing over trenches for access to houses and fencing etc. complete in all respect. | - | Cum | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | - | Cum | - | - | |
Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size )& curing complete excluding the cost of form work and reinforcement for reinforced concrete work in: | - | - | - | - | |
In foundation and plinth in all leads and lifts. | - | Cum | - | - | |
Walls (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts | - | Cum | - | - | |
Suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level in all leads and lifts. | - | Cum | - | - | |
Providing form work with steel plates 3.15mm thick welded with angle iron in frames 30x30x5mm, so as to give a fair finish including centring, shuttering ,strutting and propping etc.with wooden battens and ballies,height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ reinforced concrete and plain concrete work in:- | - | - | - | - | |
Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster,buttresses, plinth and string courses and the like in all leads and lifts. | - | Sqm. | - | - | |
Flat surfaces such as soffits of suspended floors, roofs landings and the like: floors etc. up to 200 mm in thickness in all leads and lifts. | - | Sqm. | - | - | |
Edges of slabs and breaks in floors and walls in all leads and lifts. | 61.52 | Rmt | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Form6.pdf
Tender Documents • 0.58 MB
Form8.pdf
Tender Documents • 1.06 MB
BOQ_195961.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid