| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹38.0 LAdmitted-Finance | ₹38.0 L | Admitted-Finance |
| 2 | ₹38.3 LAdmitted-Finance | ₹38.3 L | Admitted-Finance |
| 3 | Rejected-Technical | - | Rejected-Technical Document not submitted |
| 4 | Rejected-Technical UTTARAKHAND UT | UDAM SINGH NAGAR | UTTARAKHAND | 244716 | - | Rejected-Technical Document not submitted |
| 5 | Rejected-Technical GRAM AGUNDA PO THATI KATHUD BUDAKEDAR DISTRICT TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | 249001 | - | Rejected-Technical Document not submitted |
| Sl No | Description | Qty | Unit | vinod joshi | UK TRADERS |
|---|---|---|---|---|---|
| 1.00Civil Work : | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 34.22 | Cum | 11,737.46 ₹11,737.46 | 11,634.8 ₹11,634.80 |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 23.95 | Cum | 6,203.05 ₹6,203.05 | 6,227 ₹6,227 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 20.67 | Cum | 1,85,740.62 ₹1.9 L | 1,87,580.25 ₹1.9 L |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.25 | Cum | 1,37,707.25 ₹1.4 L | 1,39,125 ₹1.4 L |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 10.4 | Cum | 1,24,103.2 ₹1.2 L | 1,25,320 ₹1.3 L |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,225 | Kg | 1,73,950 ₹1.7 L | 1,73,950 ₹1.7 L |
| 1.07 | Centring and shuttering including strutting,ropping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 21.6 | Sqm | 11,167.2 ₹11,167.20 | 11,275.2 ₹11,275.20 |
| 1.08 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 7.5 | Sqm | 9,510 ₹9,510 | 9,607.5 ₹9,607.50 |
| 1.09 | Supply and Fixing Synthetic Badminton Court Floooring | 81.74 | Sqm | 1,64,215.66 ₹1.6 L | 1,24,490.02 ₹1.2 L |
Tender Value
₹38.5 L
EMD Value
₹1.0 L
Closing Date
7 May 2026, 11:00 amClosed
EEMI Tehri
Vikas Bhawan New Tehri
Const of Badminton Hall at Nagar Panchayat Ghansali
2026_MI_94537_1
01/EEMI/2026-27
Open Tender
Civil Works
180 days
Nagar Panchayat Ghansali
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Executive Engineer MID
₹1.0 L
7 May 2026
22 Apr 2026
7 May 2026
23 Apr 2026
7 May 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Civil Work : | - | - | - | - | - |
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | Cum | - | - | item1 | |
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | Cum | - | - | item2 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | Cum | - | - | item3 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - | item4 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - | item5 | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - | item6 | |
Centring and shuttering including strutting,ropping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | - | - | item7 | |
Columns, Pillars, Piers, Abutments, Posts and Struts. | - | Sqm | - | - | item8 | |
Supply and Fixing Synthetic Badminton Court Floooring | - | Sqm | - | - | item9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html