| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹1.4 CrAccepted-AOC HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | ₹1.4 Cr | 1st | Accepted-AOC 1st Lowest Bidder |
| 2 | 2nd₹2.4 Cr+₹1.1 Cr (78.9%)Rejected-Finance | ₹2.4 Cr+₹1.1 Cr (78.9%) | 2nd | Rejected-Finance 2nd lowest |
| 3 | 3rd₹2.6 Cr+₹1.2 Cr (89.7%)Rejected-Finance R 425 TELAWNE CROMPTEK ELECTRICALS PVT LTD R 425 TTC INDUSTRIAL AREA MIDC RABALE THANE BELAPUR ROAD RABALE | ₹2.6 Cr+₹1.2 Cr (89.7%) | 3rd | Rejected-Finance 3rd lowest |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
11 Nov 2021, 5:00 pmClosed
DGM Transmission Division
DGM Transmission Division 79 Tilla Agartala
As per Bid Documents
2021_POWER_23593_1
DGM/TD/AGT/2021-22/08 Date. 08.10.2021
Open Tender
Electrical Works
Turn-key
120 days
Agartala
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.3 L
DGM Transmission Division 79 Tilla Agartala
6 Jul 2022
21 Oct 2021
12 Nov 2021
22 Oct 2021
11 Nov 2021
3 Nov 2021
22 Oct 2021 - 27 Oct 2021
28 Oct 2021
Amount
Transportation of the following Transformer from different Sub-Station to bidder's workshop and back at site of TSECL after repairing including dismantling,dragging, loading, unloading etc. as required.
132/33 KV 50/62.5 MVA Power Transformer of 132 KV Grid Sub-Station, Suryamaninagar, Agartala (Transportation Mass=65.0 MT)
Opening of top cover, un tanking of core coil assembly, dismantling of top core lamination and all windings and refitting the same by new windings, cleaning and refitting of all accessories of the transformer like HV & LV bushing, conservator tank, explosion vent pipe, PRV, MOG, Plain oil level gauge, buchholz relay, all inspection cover etc. as required . Changing of all the oil seal gaskets made from rubberized cork sheet conforming to grade of IS:4253 (part III) for whole the transformer.
132/33 KV 50/62.5 MVA Power Transformer .
Supply of EHV grade New Transformer Oil conforming to IS: 3351/1993 with latest ammentment as required to complete the whole repairing works.
132/33 KV 50/62.5 MVA Power Transformer.
Supply of new copper coil for Three Phase Three Limb ( HV & LV). ( Old copper to be retained by contractor)
132/33 KV 50/62.5 MVA Power Transformer.
R- Phase HV/LV limb (6062.5Kg in each Ph in each Transformer)
Y- Phase HV/LV limb (6062.5 Kg in each Ph in each Transformer)
B- Phase HV/LV limb (6062.5 Kg in each Ph in each Transformer)
De-greasing and de-rusting of all the external surface of tank and fittings. Applying one coat of metal primer at rusted portion. Applying two coats of synthetic enamel pain having ISI mark
132/33 KV 50/62.5 MVA Power Transformer.
Testing of repaired Transformer for all possible routine tests in presence of TSECL's Engineer at their work
132/33 KV 50/62.5 MVA Power Transformer.
Insurance premium for a sum assure of Rs. 80.00 lakhs against transit damaged, loss, theft etc. while taking the transformer for repair at bidder's works site and return back to site of TSECL after repaired.
132/33 KV 50/62.5 MVA Power Transformer. (Transportation Mass=65.0 MT)
Installation,erection,testing and ready for commissioning and charging of the following PowerTransformers at site of TSECL .
132/33 KV 50/62.5 MVA Power Transformer.
Supply of 145 KV HV Bushing for 132/33 KV 50/62.5 MVA Power Transformer.
Supply of 36 KV LV Bushing for 132/33 KV 50/62.5 MVA Power Transformer.
SET ON SITE ELECTRICALS PVT LTD
TELAWNE CROMPTEK ELECTRICALS PVT.LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .