Loading…
Loading…
Tender Value
₹5.5 Cr
EMD Value
₹10.9 L
Closing Date
23 Jul 2026, 3:00 pm
Superintending Engineer Civil Circle PWD Haridwar
Office Of SE, Civil Circle, PWD Haridwar
Renewal by B.C. and construction of footpath work on the internal roads of Shankaracharya Chowk, Devpura Chowk, Chandracharya Chowk, Aryanagar Chowk and the road from Barrier to Gugal Temple in District Haridwar under Kumbh Mela-2027.
2026_pwd_97246_1
1911/06C-Civil Circle/26 Dated 02.07.2026
Open Tender
Civil Works - Roads
120 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Yes
EE, PD, PWD, Haridwar (Through E-Challan)
₹10.9 L
Yes
Civil Circle, PWD Haridwar
4 Jul 2026
4 Jul 2026
24 Jul 2026
4 Jul 2026
23 Jul 2026
9 Jul 2026
4 Jul 2026 - 6 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Brick/Tile Work
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all leads and lifts as per direction of engineer in charge and as per Technical Specification Clause 202. | 120 | Cum | 1.25 | ₹150 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all leads and lifts as per direction of engineer in charge and as per Technical Specification Clause 302.3. | 1,125.16 | Cum | - | - |
| 3 | Construction of Gravel/ Soil Aggregate Subbase/ Base by providing well graded material of nominal maximum size grading 80 mm as per Table 2.3 of IRC SP 77-2008, spreading in uniform layers with tractor mount appropriate grading arrangements on prepared surface, mixing by mix in place method at OMC with tractor mount appropriate rotavator attachment and compaction with three wheel 80-100 kN Static Roller capacity to achieve the desired density complete as per specifications contained in Para 2.2, 3.6 and 3.7 of IRC SP 77-2008. | 561.25 | Cum | 100 | ₹56,125 |
| 4 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 By Mechanical Means | 420.95 | Cum | 53 | ₹22,310.35 |
| 5 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405 By Mechanical Means | 269.54 | Cum | 10 | ₹2,695.4 |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. | 2,018.75 | Sqm | 11 | ₹22,206.25 |
| 7 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 7,675 | Sqm | 12 | ₹92,100 |
| 8 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 3,506.75 | Sqm | 13 | ₹45,587.75 |
| 9 | Providing and laying Dense Bituminous Macadam with the use of batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
Grading II - 26.5mm nominal size. (50mm Compacted thickness)
* Recovery against difference of quantities of Bitumen and Aggregates shall be done according to bituminous content & Density found actually in field after execute/Job Mix Formula/Estimated which ever is less. (Estimated density 2.31 Tonne/Cum) | 175.34 | Cum | 14 | ₹2,454.76 |
| 10 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 64,927.5 | Sqm | 15 | ₹9,73,912.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
SBD_Devpura.pdf
Tender Documents • 3.52 MB
BOQ_114858.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid