Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.7 LAccepted-AOC KALPAKANCHERY 676 551 | MALAPPURAM | KERALA | 676551 | 1 | Accepted-AOC Qualified | |
| 2 | 2₹37.7 L+₹2,300 (0.06%)Rejected-AOC | 2 | Rejected-AOC Qualified | |
| 3 | 3₹38.7 L+₹94,788.53 (2.51%)Rejected-AOC PULLIYIL MADASSERI HOUSE MELMURI PO ERANAD MALAPPURAM | MELMURI | MALAPPURAM | KERALA | 3 | Rejected-AOC Qualified |
Tender Value
₹48 L
EMD Value
₹50,000
Closing Date
16 Mar 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BaijuT P
Forest industries Travancore Limited
Construction of Concrete Road
2023_FITL_561304_2
FIT/CP-53/2022-23
Open Tender
Civil Works - Others
Item Rate
180 days
Tirur Municipality
Refer Tender Document
8 documents required · 8 mandatory
₹2,950
₹50,000
Forest Industries Travancore Limited Thaikkattukar
20 Apr 2023
8 Mar 2023
18 Mar 2023
8 Mar 2023
16 Mar 2023
8 Mar 2023
8 Mar 2023 - 11 Mar 2023
11 Mar 2023
Amount
Appendix - A - Murikkin Kattil Road Construction
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
od259572/2022_2023 : DAR 60.7.1) DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
od259615/2022_2023 : Filling with contractor's own earth ( excluding rock) in open areas in layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1.50m as per direction of site engineer -in-charge.
od259627/2022_2023 : (51.2.3) Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
od260381/2022_2023 : Providing and fixing Granite of any colour & shade for Name Board of required size laid over base<br>of cement mortar 1:4(1 cement : 4 coarse sand), including all charges etc, complete at all levels,<br>including lettering & fixing.
Appendix - B - Palakkal Idavazhi Road Construction
3.15.2 : Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
od263224/2022_2023 : Interlocking Concrete Block Pavement<br><br>Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.
od260381/2022_2023 : Providing and fixing Granite of any colour & shade for Name Board of required size laid over base<br>of cement mortar 1:4(1 cement : 4 coarse sand), including all charges etc, complete at all levels,<br>including lettering & fixing.
Appendix - C - Bus Stand Masjid Road Construction
od259504/2022_2023 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.<br>All kinds of soil
od259627/2022_2023 : (51.2.3) Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
od260380/2022_2023 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4<br>course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required<br>including compaction, finishing and tamping etc .complete. Max. size of course<br>aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per<br>specification<br> (i) Nominal mix (1:2:4)<br>a)Materials
od260381/2022_2023 : Providing and fixing Granite of any colour & shade for Name Board of required size laid over base<br>of cement mortar 1:4(1 cement : 4 coarse sand), including all charges etc, complete at all levels,<br>including lettering & fixing.
Appendix - D - Kunnathparambil Road Construction
od259504/2022_2023 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.<br>All kinds of soil
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
od259572/2022_2023 : DAR 60.7.1) DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
od259627/2022_2023 : (51.2.3) Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
od260380/2022_2023 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4<br>course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required<br>including compaction, finishing and tamping etc .complete. Max. size of course<br>aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per<br>specification<br> (i) Nominal mix (1:2:4)<br>a)Materials
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
od260381/2022_2023 : Providing and fixing Granite of any colour & shade for Name Board of required size laid over base<br>of cement mortar 1:4(1 cement : 4 coarse sand), including all charges etc, complete at all levels,<br>including lettering & fixing.
MUNEER P P
P. M Abdul kareem
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .