Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.6 Cr+₹83.0 L (7.73%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11.7 Cr+₹98.8 L (9.20%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical Not Responsive due to single work order only Rs. 561.92 lacs |
Tender Value
₹11.9 Cr
EMD Value
₹23.9 L
Closing Date
13 Mar 2023, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Widening of Road , Divider work on Suket Ramganj mandi road Km 7/0 to 10/200 (SH - 9B) (Ramganjmandi to Parsa mata Choraha)
2023_CEPWD_319390_1
ACE PWD ZONE KOTA NITNO-20-2022-23
Open Tender
Civil Works
Percentage
300 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE PWD DIV. RAMGANJMANDI
₹23.9 L
Yes
ACE PWD ZONE KOTA
31 Mar 2023
14 Feb 2023
15 Mar 2023
20 Feb 2023
13 Mar 2023
20 Feb 2023
2 Mar 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 6,837 | Cum | 34 | ₹2,32,458 |
| 2 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and disposal of dismantled Materials upto a lead of 1000 mtrs. stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) | 5,565 | Cum | 680 | ₹37,84,200 |
| 3 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 7,059.6 | Cum | 1,293 | ₹91,28,062.8 |
| 4 | Dry lean cement concrete sub - base. Construction of dry lean cement concrete 1:3:6 sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blening to be as per Table 600-1, cement content not to be less than 200 Kg/Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonne vibratory roller, finishing and curing. | 4,642.8 | Cum | 2,793 | ₹1,29,67,340.4 |
| 5 | Providing and Laying un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures and vacuum processing pump as approved, curing compound, finishing to lines and grades as per drawing as per MoRTH Specification : Clause No. 602, 112. Using Cement concrete M-40 pavement Grade | 13,737.6 | Cum | 5,643 | ₹7,75,21,276.8 |
| 6 | Earth filling with surplus soil excavated from foundation and taken only from outside of building plinth in 15cm compacted layers, including ramming watering and consolidation, lead upto 30 meters (MoRTH specification : clause 301, 304) Ordinary soil | 667.8 | Cum | 41 | ₹27,379.8 |
| 7 | Cast in Situ Cement Concrete M20 Kerb Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 Using Concrete Mixer | 6,010 | Running metre | 230 | ₹13,82,300 |
| 8 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 2,480.4 | Cum | 134 | ₹3,32,373.6 |
| 9 | Providing and laying Reinforced cement concrete pipes NP-3 for culverts including jointing ends and fixing collar with cement mortar 1:2. (MoRTH specification : clause 1000/2900). 300 mm dia | 300 | Mtr. | 1,159 | ₹3,47,700 |
| 10 | Earthwork in excavation of foundation structures as per drawing and technical specifications (MoRTH specification : clause No. 304) By Mechanical Means ( dewatering not required) Ordinary soil | 3,960 | Cum | 30 | ₹1,18,800 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.37 MB
Tendernotice_2.pdf
PDF • 16.67 MB
Tendernotice_3.pdf
PDF • 7.92 MB
1.TENDER-DOCUMENT.pdf
Tender Documents • 0.67 MB
1.POST-QUALIFICATION.pdf
Tender Documents • 0.12 MB
RATE-ANALYSIS-01.pdf
Tender Documents • 4.94 MB
BOQ_565892.xls
BOQ • 0.29 MB
COMPONENT-01.pdf
Tender Documents • 4.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .