Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
10 Aug 2026, 3:30 pm
Executive Officer
Nagar Palika Parishad Bahraich
Chauk Bazar Sthit Ghantaghar Park Ke Mukhya Dwar Ka Nirman Toilet Block Septick Tank sahit and Vidutikaran Ka karya
2026_DOLBU_1171279_1
447/RaVA-P.N/Ni.Ka/E-Te/25-26 Dt 16.07.2026
Open Tender
Civil Works
Percentage
90 days
Nagar Palika Parishad Bahraich
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,712
Executive Officer
₹2.9 L
21 Jul 2026
21 Jul 2026
10 Aug 2026
21 Jul 2026
10 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Gate | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge DSR 2.6.1 | 51.2 | cum | 130.46 | ₹6,679.55 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil. BELOW GROUND 1.5 TO 3.00 M BELOW GROUND 1.5 TO 3.00 M DSR 2.26.1 | 3.2 | cum | 93.2 | ₹298.24 |
| 4 | Filling of available excavated earth in trenches, plinth, sides of foundation etc. inlayers not exceeding 20 cms in depth, consolidating each deposited layer by ramming and watering including lead upto 50m & lift upto 1.50m. DSR 2.25 | 36.57 | cum | 113.8 | ₹4,161.67 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 | 2.71 | cum | 5,006.82 | ₹13,568.48 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. DSR 5.33 | - | - | - | - |
| 8 | Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 5.33.1.1 | 11.91 | cum | 6,985.99 | ₹83,203.14 |
| 9 | Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 5.33.2.1 | 15.27 | cum | 7,247.39 | ₹1,10,667.65 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR 5.22.6 | 3,412.67 | Kg | 79.27 | ₹2,70,522.35 |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for all hights: | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_2198650.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].