| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC NEAR GOVT U P SCHOOL PSARA 10 PADAMUGAL KAKKANAD KOCHI PADAMUGAL | KOCHI | ERNAKULAM | KERALA | 682030 | L1 | Accepted-AOC L1 | |
| 2 | L3₹4.8 L+₹60,400 (14.3%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 3 | L4₹5.1 L+₹86,800 (20.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 4 | L₹4.3 LRejected-AOC | L | Rejected-AOC L2 |
Tender Value
₹5.3 L
EMD Value
₹13,180
Closing Date
30 May 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The AEE,PWD Bridges Sub Dn, Thrissur
O/O The AEE, PWD Bridges Sub Dn, Thrissur
Investigation Work KIIFB 2017-18 Construction of Arangalikadavu Bridge across Chalakkudy River in Thrissur District
2020_PWD_358613_1
E-02/2020-21/AEE/BR/TSR
Open Tender
Civil Works - Bridges
Item Rate
90 days
Thrissur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,165
Yes
online
₹13,180
Yes
4 Aug 2020
22 May 2020
2 Jun 2020
22 May 2020
30 May 2020
22 May 2020
22 May 2020 - 30 May 2020
60 days
Amount
Conducting Traffic survey ,CBR Test and confirmatory boring
od32839/2019_2020 : Conducting Traffic Survey at two stations for 7 days, 24 hours continuously including hire charges of shed and furniture, labour charges of survey assistants, cost of stationaries etc complete and compiling the data and submitting the same in hard and soft copy etc as per the direction of the departmental officers at site.
od32846/2019_2020 : Testing charges for CBR test of soil samples collected from the site in the laboratory including the charges of labour engaged for conducting the test in the lab etc including the collection of subgrade soil sample carefully by excavating pit for laboratory test and refilling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site.
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.c.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)<br>Additional set for machine boring(extra for bore holes exceeding 5 nos)Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)Additional set for machine boring(extra for bore holes exceeding 5 nos)
56.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
C Two Infrastructure Private Limited
Babu Mathew T M
Esteem Developers (P) Limited
Bidder Name
Babu Mathew T M
Esteem Developers (P) Limited
AA AND S CONSTRUCTIONS
C Two Infrastructure Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_505293.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .