Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
29 May 2026, 6:00 pmClosed
the Executive Engineer, R & B Division, Mehsana
M&R To Pre Monsoon Work at Various Road Under R&B Sub Division Mehsana (Section M-4)
307025
2 FOR 2026-2027 S.N. -13
Open
Civil Works - Roads
Works
Mehsana
6 documents required · 6 mandatory
₹900
Executive Engineer, R&B Division, Mehsana
₹9,900
20 May 2026
20 May 2026
20 May 2026
29 May 2026
20 May 2026
Name of Work :- M&R To Pre Monsoon Work at Various Road Under R&B Sub Division Mehsana (Section M-4)
Bill of Quantities
QUANTITY STATEMENT
It. No. Description of item Quantity Unit Total Amount
It. No. Description of item Quantity Unit Total Amount
In Figures In words
1 Hydraulic Excavator 1 cum bucket capacity @ 60 cum
per hour Rupees Seven
Hundred Eighteen
And Paise Ninety
2 Supply Of Labour charges - Mazdoor (Male) For
Various Road Rupees Five
150.00 Nos 510.05 Hundred Ten And
Paise Five Only
3 Earthwork for embankment including breaking clods,
dressing with all lead and lift (excluding watering and Rupees One
consolidation)(E) From Borrow area within 3.0 Km. Hundred Sixty Nine
lead (S.O.R It Code 26001EA) And Paise Twenty
4 Charges for Cleaning & Finishing of water way of Upto
15.00 mt Length (Abutmen To Abutmen) Box
culverts & slab drain By JCB & Manpower by
removing of ganda bavals,akadas, bordies,
grass,earth, sand etc all unnecessary stuff to 5.0 m
width on Both side from outer edge of structures of
Upstream & Down Stream & 1.50 m from outer edge
from retaining wall (like slab drain or box culvert)
incl. Derooting by JCB machine and finishing by
Labour and man power throwing away all stuff Rupees Seven
branches & cleaning of Rain water spout with Thousand Six
parapet cleaning And Removing of ganda 2.00 Nos 7675.29 Hundred Seventy
bavals,akadas,bordies, grass & sand by JCB or Five And Paise
manually below and above structures etc & with Twenty Nine Only
lead and lift with all materials labour complete
asprepare smooth water way for monsoon rain water
directed ( As Per R.A ) (A) Upto 15.00 mt Length
(Abutmen To Abutmen) (RA-3)
5 Charges for Cleaning & Finishing of water way of
15.00 To 30.00 Mt Length Box culverts & slab drain
By JCB & Manpower by removing of ganda
bavals,akadas,bordies,grass,earth,sand etc all
unnecessary stuff to 5.0 m width on Both side from
outer edge of structures of Upstream & Down Stream
& 1.50 m from outer edge from retaining wall (like
slab drain or box culvert ) incl. Derooting by JCB
machine and finishing by Labour and man power
throwing away all stuff branches & cleaning of Rain Rupees Ten
water spout with parapet cleaning And Removing of Thousand Eight
ganda bavals,akadas,bordies,grass & sand by JCB or 2.00 Nos 10852.33 Hundred Fifty Two
manually below and above structures etc & with And Paise Thirty
lead and lift with all materials labour complete Three Only
asprepare smooth water way for monsoon rain water
directed ( As Per R.A ) (A) 15.00 To 30.00 Mt Length
Box culverts & slab drain (RA-4)
QUANTITY STATEMENT
It. No. Description of item Quantity Unit Total Amount
It. No. Description of item Quantity Unit Total Amount
In Figures In words
6 Charges for Cleaning & Finishing of water way of
30.00 To 60.00 Mt Length Box culverts & slab drain
By JCB & Manpower by removing of ganda
bavals,akadas,bordies,grass,earth,sand etc all
unnecessary stuff to 5.0 m width on Both side from
outer edge of structures of Upstream & Down Stream
& 1.50 m from outer edge from retaining wall (like
slab drain or box culvert ) incl. Derooting by JCB
machine and finishing by Labour and man power Rupees Twelve
throwing away all stuff branches & cleaning of Rain Thousand Two
water spout with parapet cleaning And Removing of 2.00 Nos 12290.29 Hundred Ninety
ganda bavals,akadas,bordies,grass & sand by JCB or And Paise Twenty
manually below and above structures etc & with Nine Only
lead and lift with all materials labour complete
asprepare smooth water way for monsoon rain water
directed ( As Per R.A ) (A) 30.00 To 60.00 Mt Length
Box culverts & slab drain (RA-5)
7 Charges for Cleaning & Finishing of water way of Any
Row HP Drain By JCB & Manpower by removing of
ganda bavals,akadas,bordies,grass,earth,sand etc all
unnecessary stuff up to 2.0 width on Both side from
outer HP Drain Head wall & 1.00 m width form outer
edge from B.T surface incl. Derooting by JCB
machine and finishing with man throwing away all
stuff branches & cleaning of Rain water spouce with
parapet cleaning And removing of ganda Rupees Four
bavals,akadas,bordies,grass & sand and mud etc by
95.00 Nos 4707.19 Hundred Seven
manually inside HP Drain pipes and make vatta at
And Paise Nineteen
joint of HP drain pipes etc with lead and lift with all Only
materials labour complete as prepare smooth water
way for monsoon rain water directed ( As Per R.A-7 )
(A) HP Drain Any Row
Total Bid Price (in Figure)
Rupees Nine Lakh(s) Eighty Nine Thousand Four Hundred Thirteen And Paise
(in words) Thirty Seven Only
QUANTITY STATEMENT
It. No. Description of item Quantity Unit Total Amount
It. No. Description of item Quantity Unit Total Amount
In Figures In words
I/We am/are willing to carry out the work at ___________% above/below the (percentage should bewritten in figure and words only) Estimated rates as
mentioned above,amount of my/our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
DY.EXECUTIVE ENGINEER
R&B SUB DN. DIVISION EXECUTIVE ENGINEER
MEHSANANA R&B DIVISION
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.GR to be attached with DTP_SBD.pdf
ROAD WORKS SPECIFICATIONS.pdf
SBD BOOK_0001.pdf
Specification Index_Monsoon.pdf
Schedule B.pdf
Specification_ Monsoon.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .