Loading…
Loading…
Tender Value
₹11.6 L
EMD Value
₹29,500
Closing Date
8 Sept 2026, 11:00 pm
Karnataka Urban Water Supply and Drainage Board
Shivaram S Naik
9480813125
Conducting detailed survey, preparation of Hydraulic design, Structural designs and Drawings for civil structures of the UGD system components, preparation of DPR for Providing UGD scheme to Sirsi city under deposit contribution works of CMC, Sirsi
KUWSDB/2026-27/SE0128
KUWSDB/2026-27/SE0128
Open
Two Tender Document System(Two Cover)
KUWSDB Karwar Division
9 documents required · 9 mandatory
The bidder/ service provider should have completed at least one Water Supply/ UGD projects involving survey, design consultancy by using Water Gem & Sewer Gem Software. Completed sewerage or UGD survey, modelling and DPR assignment 5 marks for one, 7 marks for two, 10 marks for three or more
The bidder/ service provider should have completed at least one Water Supply/ UGD projects involving block level survey and contour generation,Completed assignment involving total-station/DGPS survey, GIS base mapping and contour generation: 2.5 marks each, maximum 5.
Approach and methodology Understanding of assignment, existing-data validation and key risks.
Approach and methodology Survey, GIS, hydraulic/process/structural design and quality-assurance methodology
Approach and methodology Work programme, deployment schedule, deliverable control and approval strategy.
Key Personnel - Team Leader/Sewerage Expert BE/BTech Civil/Environmental minimum 8 years total experience at least 5 years relevant sewerage/DPR experience. Qualification 3, total experience 3, relevant experience 7, similar assignments 7
Key Personnel - Hydraulic Modelling Expert BE/BTech Civil/Environmental, minimum 5 years total experience, proficiency in approved sewer modelling software. Qualification 3, experience 4, software/modelling experience 8
Key Personnel - Structural Expert BE/BTech Civil, minimum 5 years structural-design experience, including liquid-retaining structures. Qualification 2, experience 3, relevant assignments 5
Key Personnel - STP Process Expert BE/BTech Civil/Environmental/Chemical, minimum 5 years process-design experience. Qualification 2, experience 3, relevant assignments 5
Key Personnel - Survey/GIS Expert Diploma/BE Civil/Geomatics, minimum 3 years Total Station/DGPS/GIS experience. Qualification 2, experience 3.
₹500
₹29,500
20 Aug 2026
20 Aug 2026
10 Sept 2026
28 Aug 2026
BoQ for Conducting Survey and Preparation of Detailed Project Report (DPR), including Hydraulic and Preliminary Structural Designs, Engineering Drawings, Detailed Estimates and Technical Assistance for the Proposed Underground Drainage (UGD) Scheme for Sirsi City..
SNo Item Code Item Name Unit Category Code Specification Specification Value Qty Rate in Rs Amount in Rs
1 est01 Conducting detailed topographical and L-section survey for identified priority/additional sewer corridors of the proposed Underground Drainage Scheme using Total Station and DGPS/GPS, including reconnaissance, establishment of benchmarks, collection and verification of available base maps and existing survey data, utility mapping, longitudinal and cross-section surveys, data processing and preparation of survey drawings. Fresh field survey quantity is limited to 15 km of identified corridors. Available survey and network data for the balance proposed 230 km sewer network shall be verified, digitised and incorporated in the hydraulic model without separate payment. Any additional fresh survey beyond 15 km shall be undertaken only with prior written approval of the Engineer-in-Charge. The scope includes permanent features, roads, drains, crossings, buildings, existing sewers/manholes, water-supply pipelines and other utilities; connection of benchmarks to Government benchmarks wherever available; recording ground levels, invert levels and hydraulic features; preparation of plans, contours, L-sections and cross-sections; GIS-compatible coordinates; editable DWG, Excel and PDF files; and three signed hard-copy sets. The agency shall be responsible for the accuracy of field measurements and shall rectify omissions or errors at its own cost. The rate includes labour, qualified survey personnel, equipment, transport, processing, drawings, reports and all incidental expenses, excluding GST. Survey deliverables shall be accepted only after field verification and approval by the Engineer-in-Charge. The agency shall coordinate with CMC Sirsi and concerned utility-owning departments and shall not damage public or private property while conducting the survey. (For full specifications refer Sl No 1 of the Objectives & Description of the Assignment mentioned in Data Sheet of the bid document). km SC001 As per the bid documents As per the bid documents 15 2100 31500
2 est02 Preparation of detailed hydraulic design and design report for the complete gravity sewer network of approximately 230 km, including lateral, branch, main, trunk and outfall sewers, using approved hydraulic modelling software and spreadsheet analysis in accordance with the latest CPHEEO Manual, relevant BIS standards and KUWS&DB requirements. The scope includes validation of survey and utility data; population projection; sewage-generation assessment; peak flow and infiltration allowance; establishment of design criteria; determination of pipe diameters, gradients, cover and invert levels; self-cleansing velocity and surcharge checks; manhole and pipe schedules; catchment-wise network analysis; hydraulic calculation sheets; design report; drawings and editable model files. Hydraulic design of rising mains, wet wells and STP units is excluded from this item and covered separately below. The rate includes engineering services, modelling, software, reports, drawings, schedules, all scrutiny-stage revisions and three signed hard-copy sets, excluding GST (For full specifications refer Sl No 2 of the Objectives & Description of the Assignment mentioned in Data Sheet of the bid document) km SC001 As per the bid documents As per the bid documents 230 1800 414000
3 est03 Specialised hydraulic, process and preliminary structural designs Preparation of detailed hydraulic design of the proposed rising main(s) from wet well(s) to STP, including design discharge, pipe diameter/material/class, static and friction heads, minor losses, surge allowance, TDH, velocity, pump duty, valves and appurtenances, hydraulic calculations, pipe schedule, drawings, editable files, reports and all revisions required for approval. Job SC001 As per the bid documents As per the bid documents 1 55000 55000
4 est04 Preparation of hydraulic and preliminary structural design of wet well(s), pumping station/PT unit(s), valve chambers and equipment foundations, including inflow, detention time, operating levels, emergency storage, pump capacity and standby arrangement, NPSH, uplift and groundwater effects, liquid-retaining requirements, seismic and other applicable loads, design calculations, GA and preliminary reinforcement drawings, quantities, reports and revisions, based on approved soil-investigation parameters and relevant CPHEEO/BIS requirements. Job SC001 As per the bid documents As per the bid documents 1 120000 120000
5 est05 Preparation of hydraulic, process and preliminary structural designs for the proposed STP based on SBR technology, subject to approval of the treatment process, including inlet works, SBR basins, treated-water tank, sludge units, disinfection, internal channels/pipelines, hydraulic profile, process calculations, equipment sizing, liquid-retaining and stability checks, preliminary structural calculations and reinforcement drawings, quantities, reports and revisions in accordance with CPHEEO, CPCB/MoEF&CC and relevant BIS requirements. If SBR technology has not already been approved, a comparative technical and life-cycle-cost appraisal of suitable treatment technologies shall be included Job SC001 As per the bid documents As per the bid documents 1 150000 150000
6 est06 Preparation of engineering drawings for DPR and estimate purposes Preparation of town base map, contour/topographical plan, ward and catchment maps, overall sewer-network plans, schematic flow diagrams, zone-wise network drawings, manhole numbering, pipe sizes, chainages, flow directions, L-sections and block plans for wet wells, pumping stations and STP, including editable DWG and PDF files. Job SC001 As per the bid documents As per the bid documents 1 52000 52000
7 est07 Preparation of general-arrangement drawings for wet wells, pumping stations, STP process units, treated-water and sludge tanks, administrative/laboratory buildings, equipment rooms, internal pipelines, hydraulic structures and associated facilities for DPR and estimate purposes. Job SC001 As per the bid documents As per the bid documents 1 52000 52000
8 est08 Preparation of preliminary structural and reinforcement drawings, sections, elevations and standard details required for DPR quantities and cost estimates; CAD layering, legends, coordinate system and KUWS&DB title blocks; incorporation of scrutiny corrections; and submission of editable files and six coloured hard-copy sets in required A0/A1/A2 sizes. These drawings are preliminary DPR drawings and shall not be treated as Good-for-Construction drawings unless separately approved and contracted Job SC001 As per the bid documents As per the bid documents 1 65000 65000
9 est09 Preparation of comprehensive Detailed Project Report, detailed estimates and approval assistance Preparation of a comprehensive DPR in accordance with the latest CPHEEO Manual, Government of Karnataka guidelines, KUWS&DB standards and relevant BIS codes, covering project background, existing system, design basis, surveys, population and sewage projections, hydraulic/process/preliminary structural designs, technical proposals, cost estimates, implementation, O&M, environmental and social aspects, treated-effluent reuse/disposal and all chapters required for technical and administrative approval. The scope includes detailed estimates using the approved applicable Schedule of Rates, supported analysis of rates and quotations for non-schedule/specialised items; BOQ, quantity calculations, specifications and cost summaries; draft and final DPR volumes; presentations to KUWS&DB and approving authorities; replies to observations; all revisions upto approval; editable Word, Excel, DWG and PDF files; and three hard-bound final sets. The consultant's responsibility shall continue until the DPR obtains the stipulated approvals, without additional payment for scrutiny-stage revisions. Job SC001 As per the bid documents As per the bid documents 1 150000 150000
10 est10 Providing and excavating the required number of trial pits at locations approved by the Engineer-in-Charge along the proposed sewer lines, rising mains, crossings and structure sites for verification of soil strata and existing underground utilities, including excavation, recording of observations, taking photographs, backfilling, compaction and restoration to the original condition, complete as directed by the Engineer-in-Charge. Laboratory testing, if required, shall be done and reports shall be furnished. Job SC001 As per the bid documents As per the bid documents 1 75000 75000
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Sirsi UGD DTS Survey final 20-08-2026.doc
Tender Document • 0.40 MB
Estimate.xlsx
Others - BoQ for reference • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].