GEMC-511687760984576
Awarded to DDR INTERNATIONAL
₹85,990
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Split type Air conditioning Test Rig | DDRI / ACT01 | 9023 | 1 number | 85,990 | 85,990 |
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | ROORKEE EQUIPMENT & MODELS PRIVATE LIMITED | 5 | ₹49,000 |
| 2 | Schedule 2 | DDR INTERNATIONAL | 4 | ₹85,990 |
| 3 | Schedule 3 | DDR INTERNATIONAL | 6 | ₹85,990 |
| 4 | Schedule 4 | DDR INTERNATIONAL | 4 | ₹68,160 |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
10 Feb 2023, 4:00 pmClosed
Mechanical Engineering Laboratory Equipment
4341165
GEM/2023/B/3052809
Two Packet Bid
Reciprocating pump test rig,Single Cylinder Diesel Engine Test Rig,Split type Air conditioning Test
GeM Contract
15 days
Gujarat; Valsad
Item wise evaluation
BOQ
Awarded to DDR INTERNATIONAL
₹85,990
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Split type Air conditioning Test Rig | DDRI / ACT01 | 9023 | 1 number | 85,990 | 85,990 |
Awarded to DDR INTERNATIONAL
₹68,160
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| The Shell and Tube Heat Exchanger Test Rig. | DDRI / HT05 | 9023 | 1 number | 68,160 | 68,160 |
Awarded to DDR INTERNATIONAL
₹85,990
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Single Cylinder Diesel Engine Test Rig | DDRI / DET01 | 9023 | 1 number | 85,990 | 85,990 |
Awarded to ROORKEE EQUIPMENT & MODELS PRIVATE LIMITED
₹49,000
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Reciprocating pump test rig | REMPLTD | HSN not specified by seller | 1 number | 49,000 | 49,000 |
2 documents required · 2 mandatory
3 yrs
₹3
Exempted
28 Feb 2023
30 Jan 2023
10 Feb 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Reciprocating pump test rig | The present Reciprocating Pump Test Rig is a self-contained unit operated on closed circuit basis containing a sump tank. The set-up consists of a Double acting, Single Cylinder Reciprocating Pump coupled with a swinging frame type DC Motor that permits direct torque measurement with the help of a spring balance. Power input to the DC Motor is varied by means of a Thyristor controlled DC Drive to vary the RPM of motor. A RPM Indicator with Proximity sensor indicates RPM of Pump. Flow of water is measured by using measuring tank and stop watch. Vacuum gauge is fitted on suction line and Pressure gauge is fitted on delivery line to measure pressure. | 1 | number | Bhavesh Nanubhai 396001,Government Polytechnic, Valsad, Kosmba | 15 |
| 2 | Single Cylinder Diesel Engine Test Rig | Two/Three main components form main parts of the test rig welded with steel base frame complete with Rope brake dynamometer, drive shaft with safe guard and anti-vibration mounting. Resistance loading arrangement with weight, to load the engine from no load to full load. Panel board positioned over the base plate consisting of fuel system with flow measurement by burette, air flow measurement system, and temperature and speed indicator. | 1 | number | Bhavesh Nanubhai 396001,Government Polytechnic, Valsad, Kosmba | 15 |
| 3 | Split type Air conditioning Test Rig | The split air conditioning test rig unit is required to conduct experiments and demonstrate the process of cooling of atmospheric air. The self contained unit will be fitted with all instruments facilities so that temperature, pressure etc. may be measured at different points in the air conditioning system. | 1 | number | Bhavesh Nanubhai 396001,Government Polytechnic, Valsad, Kosmba | 15 |
| 4 | The Shell and Tube Heat Exchanger Test Rig. | The Shell and Tube Heat Exchanger Apparatus consists of a m.s. shell, in which copper tubes are fitted. The baffle in the end box makes the tube arrangement two-pass type. The cold fluid, i.e. air enters the shell & flows over the tubes. Hot fluid is hot water, which is obtained from a geyser & flows through the tubes. 25% cut baffles are provided in the path of air.
Measuring tank measures water flow rate while an orifice with water manometer measure air flow. Thermometers measure the inlet & outlet temperatures of the fluids. The unit enables students to determine the heat transfer rate, heat transfer coefficient, LMDT & effectiveness of heat exchanger, in laminar and turbulent flow of air. | 1 | number | Bhavesh Nanubhai Patel 396001,Government Polytechnic, Valsad, Kosmba Road, Valsad. | 15 |
contract_GEMC-511687760984576.pdf
GEM_CONTRACT • 0.06 MB
contract_GEMC-511687792371148.pdf
GEM_CONTRACT
contract_GEMC-511687710158811.pdf
GEM_CONTRACT
contract_GEMC-511687760507272.pdf
GEM_CONTRACT
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4341165.pdf
GEM_BID
gpv-boq_2023-01-30-14-26-02_613ade0d81763f9fb43112c2bf11ba5b.pdf
BOQ
eqp_boq_item_sample_file-6_2023-01-30-14-26-02_8490ce9d79cd2bfc435fa32b75410c52.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .