Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC aoc | |
| 2 | L2₹8.1 L+₹1.7 L (25.6%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.9 L+₹5.5 L (84.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹12.0 L+₹5.6 L (86.7%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹12.4 L+₹5.9 L (92.2%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | netar Singh Sharma L1 | Harish Thakur L2 | Ratti Ram L3 | Vijay Singh Thakur L4 | Rattan Singh Chauhan Contractor L5 | HARI CHAND THAKUR L6 | Atma Ram L7 | VIPIN GOEL L8 | JAIPAL THAKUR CONTARCTOR L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | Excavation in earth work in in hilly area all height and depths and in all kinds of soils including saturated soil comprising of mixed soil oridinary rock and hard rock. All works road rock cutting by blasting shall be carried out by taking all necessary precutions against soil erosion damage to hill side water pollution etc, and to protect stability of hill side.Rock shall be excavated with chieseling and wedging out rock( where blasting is prohibited).All earth work in cutting/ excavation, including rock excavation shall be carried out true to lines grades sides slopes,width, camber,super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge in confirmity with the requirement of technical specification of Rural road August 2004 and clause 16.2 of general conditions for contract to achieve designed formation width including hauling and stacking of materials useful for construction at suitable sites and safe disposal of unserviceable cut material and specificed manner,including arrangement of dumping site trimming,filling of unvenness blindage and finishing of the road to specified diamensions including disposal of surplus materials with all leads, and lifts at the locatuion specified in the tender document or as directed by the Engineer-in-Charge for smooth riding.The recovery for stones where useful or not i.e. 1654.50(ONE THOUSAND SIX HUNDRED FIFTY FOUR POINT FIFTY CUBIC METRE)cubic metre @ 170/- (Rs.ONE HUNDRED SEVENTY ) only per cubic metre shall be effected on pro-rata basis.Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor,which shall have to be duly compensated by him at his on cost in all cases including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 16,545.06 | Cubic metre | - | - | - | - | - | - | - | - | - |
Tender Value
₹14.1 L
EMD Value
₹28,200
Closing Date
15 Oct 2016, 5:00 pmClosed
Executive Engineer Sangrah Division HPPWD Sangra
Executive Engineer Sangrah Division HPPWD Sangra
SH cutting in earth work at RD 2.555 to 3.540
2016_PWD_13094_3
5426-76
Open Tender
Civil Works - Roads
Item Rate
120 days
SANGRAH
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
EE Sangrah
₹28,200
9 Feb 2026
24 Sept 2016
17 Oct 2016
24 Sept 2016
15 Oct 2016
24 Sept 2016
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .