| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC | L1 | Accepted-AOC Lowest-1 | |
| 2 | L2₹12.5 L+₹1.3 L (11.2%)Rejected-AOC | L2 | Rejected-AOC Lowest-2 | |
| 3 | L3₹12.7 L+₹1.5 L (13.1%)Rejected-AOC | L3 | Rejected-AOC Lowest-3 | |
| 4 | L4₹14.7 L+₹3.5 L (31.1%)Rejected-AOC | L4 | Rejected-AOC Lowest-4 | |
| 5 | L5₹15.6 L+₹4.3 L (38.6%)Rejected-AOC | L5 | Rejected-AOC Lowest-5 |
Tender Value
₹13.4 L
EMD Value
₹20,079
Closing Date
6 Oct 2021, 5:00 pmClosed
Assistant Executive Engineer
PWD Roads sub Division Kanhangad
FDR 2020-2021 Construction of New drainage with covering slab and cross drain between Km.0/000 to 0/250 of thullisseri - Nileshwaram Azhithala road via ajanur kadapuram
2021_PWD_441738_1
PWD/2020-2021/5268/KHD
Open Tender
Civil Works - Roads
Item Rate
120 days
Kanhangad
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹20,079
Yes
25 Jan 2022
28 Sept 2021
11 Oct 2021
28 Sept 2021
6 Oct 2021
28 Sept 2021
Amount
CULVERT
3.13.2.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. <br> Ordinary Rock (not requiring blasting) - Mechanical Means<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary Rock (not requiring blasting) - Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
ABDUL KHADER V P
M.A IQBAL
MAVUNGAL MUHAMMED
A V SREEDHARAN
Bidder Name
M.A IQBAL
ABDUL KHADER V P
MAVUNGAL MUHAMMED
A V SREEDHARAN
ABHISANKARA VS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .