Chief Officer Viramgam Nagar Seva Sadan, Viramgam.
Providing And Laying Drainage Pipe Line Work From Custom Ni Chali To Krishna Flat and Milfatak Culvert to Dalit Smashan Way at Viramgam Nagarpalika, Viramgam.
340163
8 of 2026
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,062
Chief Officer, Viramgam Nagarpalika
₹29.9 L
29 Aug 2026
29 Aug 2026
29 Aug 2026
10 Sept 2026
29 Aug 2026
Name of Work :- Providing And Laying Drainage Pipe Line Work From Custom Ni Chali
To Krishna Flat and Milfatak Culvert to Dalit Smashan Way at Viramgam Nagarpalika,
Memorandum showing items works to be carried out :
Item QuantitiesE Item Of Work Tendered Unit Total Amount
Item QuantitiesE Item Of Work Tendered Unit Total Amount
No. stimated Rate according to
Qty. In Figure estimated
Custom Ni Chali To Krishna Flat
Excavation for Pipeline Trenches : Excavation for pipe line
trenches incl.all safety Provisions using site rails and Stacking
excavated stuff up to a lead of 90.oo mts Cleaning the site etc.
Completed for lifts and strata as Specified. Up to 1,50 mt Depth (d)
In hard rock and /or C.C. 1:2:4 or RCC with Blasting and Chiseling
or by chiseling Only
Excavation for Pipeline Trenches : Excavation for pipe line
trenches incl.all safety Provisions using site rails and Stacking
1A 506.00 excavated stuff up to a lead of 90.oo mts Cleaning the site etc. 102.35 Cum
Completed for lifts and strata as Specified. Up to 1.50 mt Depth (a)
In all Sorts of Soiles and soft Murrum
Excavation for Pipeline Trenches : Excavation for pipe line
trenches incl.all safety Provisions using site rails and Stacking
1AA 389.00 excavated stuff up to a lead of 90.oo mts Cleaning the site etc. 112.70 Cum
Completed for lifts and strata as Specified. 1.50 mt to 3.00 mt Depth
(a) In all Sorts of Soiles and soft Murrum
Providing and supplying ISI Standard R.C.C. pipes(of Sulphate
Resisting Cement) in standard lengths of following class and
diameter suitable for either collar joints or rubber ring joints
2 305.00 including all taxes, insurance, transportation, freight charges, 755.00 Rmt
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. (B) Class NP3 Test Pressure
kg/sq.cm 300mm dia
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of
following diameters in proper position, grade and alignment at all
2A 305.00 level as directed by Engineer-in-charge including conveyance from 136.85 Rmt
stores to site of work, labour, giving hydraulic testing as per ISI
code. 300mm Dia
Sewer Manholes: Providing and constructing Sewer manholes,
scraper manholes and unit house connection chamber, as per the
type design in brick masonry in C. M. 1:5 and inside and outside
20mm thick plastering in C. M. 1:3 necessary 100 mm coping with
reinforcement in R.C.C.M. 200 fixing C. I. steps and fixing manhole
frame and covers (But excluding supply of manhole frame and
covers) over manholes and house connection chambers and fixing
3 10.00 Manhole covers (but excluding supplying of manhole covers) over 17816.95 Nos
scraper manhole etc. complete. providing and fixing safety chain
wherever necessary as per the stipulations in the type design
complete as per latest CPHEEO manual. (excl. excavation).
(A)Manhole type "A" Circular type having inside diameter of
mm for depth upto 1.5 m depth (for 150 mm to 500 mm dia sewer)
3A 10.00 Extra Depth 1.5m to 3.0 M for "A" type manhole 7622.20 Rmt
Refilling of Pipeline trenches : Refilling the pipe line trenches incl.
4 914.00 ramming, watering Consolideting desposal of surplus stuff as 25.30 Cum
directed within a radius of 3 Km
RCC Precasr M.H Frame & Cover - Heavy Duty RCC Precasr M.H
Frame & Cover Manufacture Supply & Delivery at Store or at site of
work Precast RCC M -200 Frame & Cover Suilable to Drainage M.H
5 10.00 and per type design & Drawing including cost of Reinforcement M.S. 1121.00 Nos
Angles or Flat Curing mold work etc. a) For Sewer manholes -
Heavy Duty (i) Frame suitable for 560 mm Dia opening of MH
RCC Precasr M.H Frame & Cover - Heavy Duty RCC Precasr M.H
Frame & Cover Manufacture Supply & Delivery at Store or at site of
work Precast RCC M -200 Frame & Cover Suilable to Drainage M.H
6 10.00 and per type design & Drawing including cost of Reinforcement M.S. 1173.00 Nos
Angles or Flat Curing mold work etc. a) For Sewer manholes -
Heavy Duty (ii) Cover Suitable for 560 mm Dia Opening of M.H
Constructing brick masonry chamber for underground C.I.
Inspection chamber and bends with bricks having crushing strength
not less than 35Kg/Cm2 inC.M.1:5C.I. cover with frame (Light duty)
455mmx 610mm intenal dimensions total weight of cover with
frame tobe not less than 38Kg. (Wt.ofcover23Kg.)and Wt.of
7 20.00 frame15Kg.) (R.C.C. top slabe with 1:2:4mix (1-cement :2 coarse 2932.93 Each
sand:4-graded stone aggregate 20mm size) foundation concrete
1:5:10 inside plaster 15mm thick with cement mortar1:3 finished
smooth with a floating coat of neat cement on walls and bed
concrete etc. complete.(i) Inside dimensions 455mmx6110mm and
450mm deep for single pipe line.
Dewatering by pumping set of required capacity including
temporary platform carting pumping at site and fixing the same in
position including all accessories, and fuel and labour etc.
complete.( 1 HP Rate 18.32)
Labour charges for repairing in CI/DI pipeline of following diameter
at different places, including necessary excavation manually or by
machinery, removing of mud, dewatering, cleaning of pipe cuting of
pipe jointing & repaining using CID joints including CID joints
rubber rings nut botts hiring excavator, hydra /crane dewatering
macine fule operator ect completed (including cost of Jointing
material but excluding cost of pipe) 300mm Dai Pipe
Milfatak Culvert to Dalit Smashan Way
Excavation for Pipeline Trenches : Excavation for pipe line trenches
incl.all safety Provisions using site rails and Stacking excavated stuff up
1 162.00 to a lead of 90.oo mts Cleaning the site etc. Completed for lifts and 427.80 Cum
strata as Specified. Up to 1,50 mt Depth (d) In hard rock and /or C.C.
1:2:4 or RCC with Blasting and Chiseling or by chiseling Only
Excavation for Pipeline Trenches : Excavation for pipe line trenches
incl.all safety Provisions using site rails and Stacking excavated stuff up
1A 1052.00 to a lead of 90.oo mts Cleaning the site etc. Completed for lifts and 102.35 Cum
strata as Specified. Up to 1.50 mt Depth (a) In all Sorts of Soiles and
Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resisting
Cement) in standard lengths of following class and diameter suitable
for either collar joints or rubber ring joints including all taxes,
2 110.00 insurance, transportation, freight charges, octroi, inspection charges, 527.00 Rmt
loading, unloading, conveyance to departmental stores, stacking etc.
(B) Class NP3 Test Pressure 0.7 kg/sq.cm 250mm dia
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following
diameters in proper position, grade and alignment at all level as
2A 110.00 directed by Engineer-in-charge including conveyance from stores to 111.55 Rmt
site of work, labour, giving hydraulic testing as per ISI code. 250mm
Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resisting
Cement) in standard lengths of following class and diameter suitable
for either collar joints or rubber ring joints including all taxes,
3 232.00 insurance, transportation, freight charges, octroi, inspection charges, 471.00 Rmt
loading, unloading, conveyance to departmental stores, stacking etc.
(B) Class NP3 Test Pressure 0.7 kg/sq.cm 225mm dia
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following
diameters in proper position, grade and alignment at all level as
3A 232.00 directed by Engineer-in-charge including conveyance from stores to 101.20 Rmt
site of work, labour, giving hydraulic testing as per ISI code. 225mm
Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resisting
Cement) in standard lengths of following class and diameter suitable
for either collar joints or rubber ring joints including all taxes,
4 370.00 insurance, transportation, freight charges, octroi, inspection charges, 1361.00 Rmt
loading, unloading, conveyance to departmental stores, stacking etc.
(B) Class NP3 Test Pressure 0.7 kg/sq.cm 450mm dia
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following
diameters in proper position, grade and alignment at all level as
4A 370.00 directed by Engineer-in-charge including conveyance from stores to 196.65 Rmt
site of work, labour, giving hydraulic testing as per ISI code. 450mm
Sewer Manholes: Providing and constructing Sewer manholes, scraper
manholes and unit house connection chamber, as per the type design
in brick masonry in C. M. 1:5 and inside and outside 20mm thick
plastering in C. M. 1:3 necessary 100 mm coping with reinforcement in
R.C.C.M. 200 fixing C. I. steps and fixing manhole frame and covers
(But excluding supply of manhole frame and covers) over manholes
and house connection chambers and fixing Manhole covers (but
5 10.00 excluding supplying of manhole covers) over scraper manhole etc. 17816.95 Nos
complete. providing and fixing safety chain wherever necessary as per
the stipulations in the type design complete as per latest CPHEEO
manual. (excl. excavation).
(A)Manhole type "A" Circular type having inside diameter of 1200 mm
for depth upto 1.5 m depth (for 150 mm to 500 mm dia sewer)
Refilling of Pipeline trenches : Refilling the pipe line trenches incl.
6 1118.00 ramming, watering Consolideting desposal of surplus stuff as directed 25.30 Cum
within a radius of 3 Km
RCC Precasr M.H Frame & Cover - Heavy Duty RCC Precasr M.H Frame
& Cover Manufacture Supply & Delivery at Store or at site of work
Precast RCC M -200 Frame & Cover Suilable to Drainage M.H and per
7 10.00 type design & Drawing including cost of Reinforcement M.S. Angles or 1121.00 Nos
Flat Curing mold work etc. a) For Sewer manholes - Heavy Duty (i)
Frame suitable for 560 mm Dia opening of MH
RCC Precasr M.H Frame & Cover - Heavy Duty RCC Precasr M.H Frame
& Cover Manufacture Supply & Delivery at Store or at site of work
Precast RCC M -200 Frame & Cover Suilable to Drainage M.H and per
8 10.00 type design & Drawing including cost of Reinforcement M.S. Angles or 1173.00 Nos
Flat Curing mold work etc. a) For Sewer manholes - Heavy Duty (ii)
Cover Suitable for 560 mm Dia Opening of M.H
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary in
C.M 1:6 at top including cost of excavation refiting of frame & cover in
9 23.00 C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of Dismentaling 992.16 Each
Material from site etc. Completed incl. all carting and providing of
materials which is required for the purpose (except frame and Cover)
Labour charges for repairing in CI/DI pipeline of following diameter at
different places, including necessary excavation manually or by
machinery, removing of mud, dewatering, cleaning of pipe cuting of
10 4.00 pipe jointing & repaining using CID joints including CID joints rubber 5315.30 Nos
rings nut botts hiring excavator, hydra /crane dewatering macine fule
operator ect completed (including cost of Jointing material but
excluding cost of pipe) 250mm Dai Pipe
Labour charges for repairing in CI/DI pipeline of following diameter at
different places, including necessary excavation manually or by
machinery, removing of mud, dewatering, cleaning of pipe cuting of
10A 4.00 pipe jointing & repaining using CID joints including CID joints rubber 3933.00 Nos
rings nut botts hiring excavator, hydra /crane dewatering macine fule
operator ect completed (including cost of Jointing material but
excluding cost of pipe) 200mm Dai Pipe
Labour charges for repairing in CI/DI pipeline of following diameter at
different places, including necessary excavation manually or by
machinery, removing of mud, dewatering, cleaning of pipe cuting of
10B 4.00 pipe jointing & repaining using CID joints including CID joints rubber 12752.35 Nos
rings nut botts hiring excavator, hydra /crane dewatering macine fule
operator ect completed (including cost of Jointing material but
excluding cost of pipe) 450mm Dai Pipe
Renovation of manhole by increasing the height at top including cost
of excavation, refitting of C. I. manhole frame and cover curing etc.
complete incl. all carting and providing of materials which is required
for the purpose (except manhole frame and cover) For all type
11 5.00 manhole by providing RCC 1:2:4 Partition walls with required 3880.10 Nos
reinforcement 25 cm thick and circular opening with 500mm clear dia
and 0.40 mt. av.
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand :
Crushed stone aggregates 40 mm nominal size) and excluding cost of
reinforcement in reinforced concret for following grades, machined
batched & machine vibrated concrete using graded hard (black trap)
12 158.00 stone aggregate of 40mm nominal size obtained from quarry including 2830.46 Cum
mechanical mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer.., (A)
Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
TOTAL NET AMOUNT
Estimated amount Estimated amount
Put to tender Rs ……............. Put to tender Rs……............
Deduct .............% below Rs………… Add............% above Rs……………
Total Rs………… Total Rs……………
(*Please strike out whichever is not applicable).
Note : 1 All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0JLhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
contractor under this signature.
GM\W o Z VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for
work under all conditions, site, moisture, weather etc.
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[fNZ[S ZLT[ ;FO;}OL SZJFGM\ ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[
C[9/ SFD VD,DF\ ZC[X[P
Note : 4 To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Viramgam Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Standard Bidding Document.pdf
2 .SCHEDUAL-B.pdf
3. General Nots condictions C.C Road W.D.pdf
4.General Techinacal Specification.pdf
5.BUILDINGSPECIFICATIONSBOOK.pdf
5.Standards for Cement Con. Dt.11-5-2017.pdf
6.Testing Schedule Dt.24-10-1994.pdf
7. TENDER SARTO.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].