| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹81.5 LAccepted-AOC | ₹81.5 L | L2 | Accepted-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 788 Dated 29-10-2025 |
| 2 | L2₹81.5 LRejected-AOC | ₹81.5 L | L2 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 788 Dated 29-10-2025 |
| 3 | L2₹81.5 LRejected-AOC | ₹81.5 L | L2 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 788 Dated 29-10-2025 |
| 4 | L2₹81.5 LRejected-AOC | ₹81.5 L | L2 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 788 Dated 29-10-2025 |
| 5 | L2₹81.5 LRejected-AOC | ₹81.5 L | L2 | Rejected-AOC Recommendation vide No. PMC/EE/XV-FC-22/2021-22/ 788 Dated 29-10-2025 |
| Sl No | Description | Qty | Unit | ER Gemin Yomso L2 | M/s O Darang Enterprise L2 | M/S K.P.ENTERPRISE L2 | M/s Dura Enterprise L2 | M/S M K Bosing Traders L2 | MS Merchandise Enterprise L1 | M/S M.K. CONSTRUCTION L3 | M/S O.M. ASSOCIATES L2 | M/s Tintin Enterprise L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SH : - Jungle Clearence | ||||||||||||
| 1.01 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm | 461 | Each | 1,621 ₹7.5 L | 1,550 ₹7.1 L | 1,630 ₹7.5 L | 1,630 ₹7.5 L | 1,550 ₹7.1 L | 1,621 ₹7.5 L | 914.13 ₹4.2 L | 1,600 ₹7.4 L | 1,621 ₹7.5 L |
| 1.02 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposalof unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
B) In area of thorny jungle | 4.58 | Hect. | 1,32,550 ₹6.1 L | 1,28,077.15 ₹5.9 L | 1,33,000 ₹6.1 L | 1,33,000 ₹6.1 L | 1,28,080 ₹5.9 L | 1,32,514 ₹6.1 L | 1,46,694.03 ₹6.7 L | 1,31,402.29 ₹6.0 L | 1,32,550 ₹6.1 L |
| 2.00SH :- Construction of Boundary wall . | ||||||||||||
| 2.01 | Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming & dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m & lift upto 1.50 m. | 101.74 | Cum | 264 ₹26,859.36 | 320 ₹32,556.80 | 270 ₹27,469.80 | 270 ₹27,469.80 | 320 ₹32,556.80 | 264 ₹26,859.36 | 390.65 ₹39,744.73 | 320 ₹32,556.80 | 264 ₹26,859.36 |
| 2.02 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 9.57 | Cum | 6,295 ₹60,243.15 | 5,400 ₹51,678 | 6,000 ₹57,420 | 6,000 ₹57,420 | 5,400 ₹51,678 | 5,938 ₹56,826.66 | 6,571.66 ₹62,890.79 | 6,000 ₹57,420 | 6,295 ₹60,243.15 |
| 2.03 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:
b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level. | 15.13 | Cum | 7,048 ₹1.1 L | 6,010 ₹90,931.30 | 6,700 ₹1.0 L | 6,700 ₹1.0 L | 6,010 ₹90,931.30 | 6,649 ₹1.0 L | 7,357.83 ₹1.1 L | 6,200 ₹93,806 | 7,048 ₹1.1 L |
| 2.04 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
(a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 9.33 | Cum | 9,380 ₹87,515.40 | 7,980 ₹74,453.40 | 8,900 ₹83,037 | 8,900 ₹83,037 | 7,980 ₹74,453.40 | 8,849 ₹82,561.17 | 9,792.7 ₹91,365.89 | 9,900 ₹92,367 | 9,380 ₹87,515.40 |
| 2.05 | RCC work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. (c) 1:1.5:3 (1 cement: 1.5 coarse sand: 3 stone agg. 20 mm nominal size). | 6.33 | Cum | 11,142 ₹70,528.86 | 9,490 ₹60,071.70 | 11,000 ₹69,630 | 11,000 ₹69,630 | 9,490 ₹60,071.70 | 10,511 ₹66,534.63 | 11,631.96 ₹73,630.31 | 10,000 ₹63,300 | 11,142 ₹70,528.86 |
| 2.06 | RCC work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. (b) 1:1.5:3 (1 cement: 1.5 coarse sand: 3 stone agg. 20 mm nominal size). | 18.13 | Cum | 11,003 ₹2.0 L | 8,050 ₹1.5 L | 10,500 ₹1.9 L | 10,500 ₹1.9 L | 8,050 ₹1.5 L | 10,380 ₹1.9 L | 11,486.77 ₹2.1 L | 9,600 ₹1.7 L | 11,003 ₹2.0 L |
Updated dates
Tender Value
₹90.5 L
EMD Value
₹90,500
Closing Date
23 Oct 2025, 10:00 amClosed
Executive Engineer, Pasighat Municipal Council
Executive Engineer, Pasighat Municipal Council, Pasighat, PO.PS-Pasighat District East Siang, Arunachal Pradesh, PIN-791102
Infrastructure development at Burial cum Cremation ground at 21-mile Jarku Pasighat, East Siang, Arunachal Pradesh. (Sh - Improvement of Internal approach Road, Drainages, Parking, waiting shed, Boundary walls and allied works)
2025_PMC_2808_1
PMC/EE /XV-FC-22/2021-22/13
Open Tender
Civil Works
182 days
21-Mile Jarku Pasighat.
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,000
EE PMC Pasighat
₹90,500
30 Oct 2025
14 Oct 2025
23 Oct 2025
14 Oct 2025
23 Oct 2025
14 Oct 2025
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_3002.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_3002.xls
BOQ • 0.43 MB
TenderDoc.pdf
Tender Documents • 2.29 MB
Download all tender documents and submit your bid