Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹49.9 LAdmitted-Fee/PreQual/Technical/Finance 196 NAGOO NOOR BAGH NOOR BAGH BARAMULLA JAMMU KASHMIR 193101 UDYAM JK 03 0039827 | BARAMULLA | JAMMU AND KASHMIR | 193101 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹50.1 L+₹18,640.74 (0.37%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹50.1 L+₹18,640.74 (0.37%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹51.9 L+₹2.0 L (3.96%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹52.2 L+₹2.2 L (4.48%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹71.7 L
EMD Value
₹1.4 L
Closing Date
4 May 2026, 4:00 pmClosed
exen r and b watergam
ofc of xen r and b rafiabad
Construction of Physics, Chemistry and Biology and Computer Room at Boys Higher Secondary School Shutloo
2026_PWDJK_308111_1
e nit 08 of 2026-27 dated 18/04/2026
Open Tender
Civil Works
Percentage
270 days
rafiabad
nit
2 documents required · 2 mandatory
₹1,600
exen r and b rafiabad
₹1.4 L
Yes
10 May 2026
18 Apr 2026
5 May 2026
18 Apr 2026
4 May 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 50M from edge of cutting . | - | Cum | - | - |
| 2 | Providing and laying Stone solling /boulders Hand packed including compacting, watering including all carriages of material complete. | 1 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level (1:4:8) (1Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size).incld all carriages | 1 | Cum | 1 | ₹1 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement all work up to all levels(.1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size) Crushed. (All Works up to Plinth level).incld all carriages | - | Cum | - | - |
| 5 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20mm nominal size crushed stone agg.).incld all carriages | - | Cum | - | - |
| 6 | Centering and shuttering including strutting propping etc. removal of form work in Raft,foundation and plinth (All works upto Plinth level) | - | Sqm | - | - |
| 7 | Brick work with FPS bricks of class designation 75 in super structure up to all floors. Including carraige of Bricks In cement mortar 1cement: 6 fine sand mortar..incld all carriages | 1 | Cum | - | - |
| 8 | Providing and fixing of wood work in frames of door/ window /arch windows /ventilator wrought frames (chowkats) imported klin Dried Wood .incld all carriages | - | Cum | - | - |
| 9 | Providing and laying in position Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) .incld all carriages | 1 | Cum | - | - |
| 10 | Supplying, cutting, bending to shape, fabricating, fixing and tying in position TMT Reinforcement Steel at all levels and location as shown in the structural drawing. The rate shall include cost of supply & tying reinforcement with GI binding wire..incld all carriages | - | kgs | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_998859.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .