Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 LRejected-AOC | ₹5.1 L | L2 | Rejected-AOC L2 |
Tender Value
₹5.0 L
EMD Value
₹10,062
Closing Date
31 Mar 2026, 3:00 pmClosed
Executive Engineer, Div-IV, AMC
O/O the Executive Engineer, Div-IV, AMC
Const of Pucca drain around the Modern Cricket Accademy Ground at Shibnagar Modern Club under ward no 24 AMC
2026_SAMC_71784_1
DNIET-49/DIV-IV/AMC/25-26
Open Tender
Civil Works
Percentage
60 days
under ward no -24, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹10,062
Yes
9 Jun 2026
25 Mar 2026
31 Mar 2026
25 Mar 2026
31 Mar 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil | |||||
| 2Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | |||||
| 3Providing and laying dry flat brick flooring in required pattern complete. | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | |||||
| 5First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | |||||
| 612 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) with neat cement punning | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73054.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_73054.xls
BOQ • 0.33 MB
DNIET49.pdf
Tender Documents • 2.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].