Loading…
Loading…
Tender Value
₹7.1 L
EMD Value
₹17,900
Closing Date
9 Oct 2019, 5:00 pmClosed
Assistant Executive Engineer,
Assistant Executive Engineer, KIP (RB) Sub Division No.26, Karunagappally
Rectification of Canal
2019_Irrig_304718_1
30/AEE/KIP/KPY/2019-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Sooranad North
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,600
Yes
online
₹17,900
Yes
29 Jan 2020
30 Sept 2019
11 Oct 2019
30 Sept 2019
9 Oct 2019
30 Sept 2019
Amount
Scheme 1: rectification work between ch.2800 m and 2850 m
od33844/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od33845/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od33846/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 2: rectification work between ch.2850 m and 2900 m
od33844/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od33845/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od33846/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 3: rectification work between ch.2900 m and 2950 m
od33844/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od33845/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od33846/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 4: rectification work between ch.2950 m and 3000 m
od33844/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od33845/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od33846/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 5: rectification work between ch.3000 m and 3050 m
od33844/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od33845/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od33846/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 6:: rectification work between ch.3050 m and 3100 m
od33844/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od33845/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od33846/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
SABU M
Bidder Name
SABU B
SABU M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_417590.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .