| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.1 LAccepted-Finance | 1 | Accepted-Finance under process for allotment | |
| 2 | Not Admitted-Finance MAHALAKPUR NIZAMPUR AGHWANPUR ROAD AGHWANPUR MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Finance RASUL PUR RASUL PUR 133204 | YAMUNANAGAR | HARYANA | 133204 | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹24.5 L
EMD Value
₹49,000
Closing Date
26 Jul 2022, 5:00 pmClosed
EE NARAINGARH
PD NARAINGARH
RESTORATION OF CUTS FOR CROSSING OF SEWER LINE BY PHED ON KAPAL MOCHAN DANAURA ROAD (ID 746) AND JAGADHARI BILASPUR SADHAURA (SH-01) ROAD IN YAMUNA NAGAR DISTT (ID 742)Re-called.
2022_HRY_223301_2
RESTORATION OF CUTS FOR CROSSING OF SEWER LINE BY
Open Tender
Civil Works - Roads
Works
60 days
sadharua
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹49,000
Yes
21 Oct 2022
18 Jul 2022
28 Jul 2022
18 Jul 2022
26 Jul 2022
18 Jul 2022
Amount
Excavation for road work in soil by manual/ mechanical means including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections including breaking of clods and disposal within ROW as per technical clause 301 of MORT&H specifications (HSR 17.74)
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give rolling with road roller, compacting the bed to achieve minimum dry density as given in theTable 3000-2 as per technical clause 305 of MORT&H specifications (HSR 17.5.3)
Construction of Embankment approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. Note: In case the quantity of earth work calculated with NSL and finished level found to be less than 2647.01 cum. Then actual quantity (less than 2647.01 cum) will be paid. In case quantity worked out is more than 2647.01 cum, then only 2647.01 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 5 of DNIT. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer. (HSR.17.6)
Relaying of available ( removed and stacked interlocking paver block pavement having thickness 100mm/ 80 mm / 60 mm ( average = 80 mm) as per drawings and technical specification clasue 1504 (HSR.17.71) ( 1 x 2400 x 1.50 = 3600.00 sqm take 80% credit)
Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. (HSR.17.69.2)
Providing & laying 200 mm Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying 200 mm WBM (G-II) 53 mm to 22.4 mm (75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15: 1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications (HSR.17.44)
Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications.(HSR.17.45)
Prime Coat @ 0.60kg per sqm Providing and applying primer coat with bitumen emulsion SS-I on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications (Based on HSR 17.25)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (Based on HSR 17.26.2)
Providing and laying 50mm thick dense graded bituminous macadam (DBM) with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications (HSR.17.30.2) Note: - I If bitumen required is more than 4.50% as per job mix formula no extra payment will be made and extra bitumen required will be considered as incidental to work. II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor
Providing and laying 30mm thick bituminous concrete (BC) with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications (HSR.17.31.2) Note: - I If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of antistripping agent along with procedure shall be approved by SE-incharge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. III - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .