Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.8 LAccepted-AOC | ₹18.8 L | 1 | Accepted-AOC QUALIFIED |
Tender Value
₹25.0 L
EMD Value
₹24,952
Closing Date
30 Mar 2026, 5:00 pmClosed
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
Special Repair of Drain from Keuta Sahi Culvert to Balijodi Nala via- Karan Sahi in Ward No-02
2026_ORULB_127372_29
ODULB_KGM_22/2025-2026
Open Tender
Civil Works - Others
Percentage
90 days
KEONJHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹24,952
Yes
22 Jul 2026
19 Mar 2026
31 Mar 2026
19 Mar 2026
30 Mar 2026
19 Mar 2026
19 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | |||||
| 2Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge | |||||
| 3Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | |||||
| 4C.C. ( 1 : 4 : 8 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | |||||
| 5RCC/PCC work in M- 20 Grade of concrete with 20 mm & down graded size CBHG chips including hoisting & laying & cost, conveyance to site , royalty , Cess DMF & EMF and additinol royalty etc. All taxes of all materials complete. | |||||
| 6Rigid & smooth Centering & shuttering for PCC works including false work and dismentalling them after casting including cost & charges of all materials & cost of all labour complete . | |||||
| 7Suplying , fitting & placing in position uncoated HYSD bar reinforcement for RCC work including cutting ,bending ,binding & placing in position including cost & conveyance to site etc. all taxes of MS/ TS Rod & binding wire 18to 20 gauge complete | |||||
| 8Supplying all labour , T & P , etc. for preparation of Stainless steel with ACP Sheet Display Board including writing charges & provision of photto graphs Pre, during & post etc. including cost of all materials & cost of all labour complete . | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585699.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
DTCN.pdf
Tender Documents • 0.80 MB
BOQ_585699.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .