Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹42.4 L
EMD Value
₹43,000
Closing Date
23 Nov 2026, 6:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Surat Canal Division, Surat
RECONSTRUCTION OF NEW VRB IN PLACE OF EXISTING VRB AT RD 64.350 ON SURAT BRANCH CANAL EX. KLBMC.
364285
NIT-06 of 202627
Open
Civil - All
Works
Surat
13 documents required · 11 mandatory · 2 optional
₹1,500
Executive Engineer, Surat Canal Division, Surat
₹43,000
8 Nov 2026
8 Nov 2026
8 Nov 2026
23 Nov 2026
8 Nov 2026
120 days
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer may
fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter
a rate or price shall be deemed to be covered by other rates and prices entered in the Bill
of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections of
the contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work : RECONSTRUCTION OF NEW VRB IN PLACE OF EXISTING VRB AT RD
64.350 ON SURAT BRANCH CANAL EX. KLBMC.
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Description of Item (with brief
Item Quanti Rate in
specification and reference to book of Unit Amount
specifications)
Dismantling the existing brick masonry
including sorting out and stacking the useful
1 materials and removing the debries and 129.00 M3 757.4
making good the damage etc. complete as
directed. (b) In cement mortar
Dismantling the existing RCC work including
disposing the dismentalled stuff including
2 sorting out and stacking the useful materials 81 M3 1310.80
and removing the debries and making good
the damage etc. complete as directed.
Providing and laying Hard murrum for
mm thick subgrade with CBR 7% including
breaking clods, dressing with all lead and lift
and including watering, rolling and
3 consolidation of subgrade in layers at O.M.C. to 41 M3 455.01
required dry density, including filling the
depressing, which occurs during the process
using power roller of 8 tonne to 10 tonne all as
per specification.
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft &
hard murrum, etc. dry condition including
4 depositing the excavated stuff in uniform 420 M3 81.50
layers in banks or as directed etc. complete for
lead uo to 1.0 Km and all lifts. (By machinery)
(a) Above water table.
Providing and laying plain/ reinforced
Design Mix cement concrete of various
grade with cement, sand and coarse
aggregates including centering, shuttering,
batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc.
complete for all lead and lift.(Baching Plant
Based, Including dewatering)
(ii) M-10 grade
Providing and laying plain/ reinforced
Design Mix cement concrete of various
grade with cement, sand and coarse
6 aggregates including centering, shuttering,
batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc.
complete for all lead and lift.(Baching Plant
Based, Including dewatering)
(B) Raft, Bottom slab of barel, footing of
columns,piers, abutment and bottom slab of
(ii) M-15 grade
(D) Walls of barrels, brestwall, staunching 176.00 M3 5228.00
rings, pedestals of bearing, stoplog piers, well
staining, transitionwall, etc.
(ii) M-15 grade
(B) Raft, Bottom slab of barel, footing of
columns,piers, abutment and bottom slab of
(iii) M-25 grade
(D) Walls of barrels, brestwall, staunching
rings, pedestals of bearing, stoplog piers, well
staining, transitionwall, etc.
(iii) M-25 grade
(E) Roadway slab, approch salb, chute floor
slab,kerb, pier cap, abutment cap, hoisting
platform,top slab of barrel etc. 75.00 M3 5206.30
(iii) M-25 grade
Providing and placing in position
reinforcement bars including cutting, bending
7 welding, joints where necessary, hooking etc. 143.00 Qtl. 7194.00
complete as per drawing for all lead and lifts.
Providing and fixing in position PVC heavy
duty water stops in barrels, trough, and wing
wall with 25 mm wide expension joint as
8 shown in drawing including filling the joints M 384.90
with asphalt pad or bitumins or cork board of
approved quality. (A)225mm wide PVC water
Providing and filling the polysulphide joint
selent of the approved make in the expansion
and contraction joints in the c.c. lining
including clearing the joints with air water jet
Providing and fixing in position pre moulded
asphalt or bitumin cork board of approved
quality and specification as per design and
drawing as directed. (D) 12mm thickness
Back fiing the foundation trenches around the
structures etc. with selected excavated stuff
including watering, ramming, compacting etc.
complete.(By machinary)
Providing and fixing in position 110 mm dia
12 PVC pipe weep holes in abutment, wing wall, 3.00 M 263.70
and laying training etc. complete.
Providing and fixing in position 1.80 m high
above finished ground level canal data boards
of standard size 1.20m x 0.90m with M.S. angle
13 40mm x 40mm x 6mm with 3mm thick iron
plate in 1:5:10 proportion concrete block size
40cm x 40cm x 75 cm including painting
existing data on the board etc. complete as
Suppliying of graded stone aggregate of
14 following sizes (for W.B.M. Road)(2) Hand 21.00 M3 306.78
broken stone aggregate 40 mm to 63 mm size.
Spreading the stone aggregate for rolling and
W.B.M. including filling the interstices to
required camber and gradient (excluding
spreading of Blindage) (ii) 40mm to 63mm
size aggreagates (H.B.)
Providing videogrphy on the occasion of
function or for ongoing construction work
including dubbing, titling etc.complete 1.00 Hrs. 1230.51
including cost of cassate/CD. (b) up to
Construction of Granular sub-base 150 mm
thick by providing coarse graded machine
crushed B.T.material satisfying MOST
specification of grading I (B.T.stone aggregate
17 and 2.36 mm below-20%) including spreading 100.00 M3 1170.00
in uniform layer with motor grader on
prepared surface,mixing by mix in place
method with rotavator at OMC and
compacting with vibratory roller to achive the
desired density etc. complete.
Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal beam
crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail, 70 cm above
road/ground level, fixed on ISMC series
channel vertical post, 150 x 75 x 5 mm spaced
2 m centre to centre, 1.8 m high, 1.1 m below
ground/road level, all steel parts and fitments
to be galvanised by hot dip process, all fittings
to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a
spacer of channel section 150 x 75 x 5 mm,
330 mm long complete as per clause 811)
Providing and applying anti carbonation, anti
fading, mold resistant, heat insulating, and
100% acrylic breathable decorative external
waterproof coating of approved shade having
Viscosity @ Room Temperature by Ford cup
No. B-4 (dilute 2 parts of product with I part of
19 water) 18 to 30 sec. pH of 7.00 to 10.00 and 220.00 M2
Sp. Gravity @ Room Temperature 1.30+0.1,
tested for carbon dioxide diffusion resistance
properties for coating materials and coating
systems for exterior masonry and concrete as
per DIN EN 1062-6 (2002-2010) by a NBA
Grade "A" accredited institution.
Care and diversion of Canal including required
20 dewatering during construction of CD works
and allied works as prescribed and directed 1 Job 100000.0
etc. complete. (Including credit of usable NP
pipe after completing of work)
Rupees forty two Lakh Thirty- Eight Thousand Three Hundred Ninety-One And Paise
Ninety -Two Only
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD- 64.35RD final copy.pdf
BOQ 64.35RD final.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .