Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Fee/PreQual/Technical/Finance | -1.15% | ₹8.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.5 L+₹49,644.58 (6.22%)Admitted-Fee/PreQual/Technical/Finance VILL RATANNAGAR LAXMIPUR DURGANAGAR JIRANIA WEST TRIPURA PIN 799035 | WEST TRIPURA | TRIPURA | 799035 | +5.00% | ₹8.5 L+₹49,644.58 (6.22%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.7 L+₹73,861.45 (9.26%)Admitted-Fee/PreQual/Technical/Finance VILL CHANDIGARH PO CHANDIGARH PS MELAGHAR SEPAHIJALA TRIPURA | +8.00% | ₹8.7 L+₹73,861.45 (9.26%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹16,145
Closing Date
7 Sept 2026, 3:00 pmClosed
THE EE WRD I KUNJABAN AGARTALA
O/O THE EE WRD I, KUNJABAN, AGARTALA, TRIPURA
Mtc. of M.I schemes under W.R. Sub-Division Khowai during the year 2026-27 / S.H _- Repairing of pump, motor, suction delivery line, rewinding etc. at different M.I schemes under Khowai Block (Gr-II). (Job No. TR/20/Minor Works/WRD-I/2026-27)
2026_CEWR_76433_1
31_EE_WRD_I_DNIET_2026_27
Open Tender
Civil Works
Percentage
365 days
WEST TRIPURA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹16,145
8 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of pump for over hauling including greasing, gland packing, necessary epairs & reinstallation of the same including trial run for 10 hrs. in two spell complete as per direction of the Engineer-in-Charge.
i) For LI. | 10 | No | 2,106.92 | ₹21,069.2 |
| 2 | Dismantaling of horizontal pump and motor of 20/25 HP from the base and carrying the pump set to the nearest workshop for repairing the body thread of stag nut and carrying the same to the scheme and fitting fixing the pump set as before as per direction of the Engineerin- charge. | 2 | No | 4,247.99 | ₹8,495.98 |
| 3 | Dismentalling of motor for vernishing, heating etc. complete in/c reinstallation and making necessary electrical connection with main switch / starter with motor in/c trial run for 10 hrs in two spell complete as per direction of Engineer-in-charge. | 1 | No | 1,439.96 | ₹1,439.96 |
| 4 | Supply & fitting fixing ball bearing of approved quality for pump required during overhauling.
a) 6305 Ball bearing (TATA /SKF) | 6 | No | 760.54 | ₹4,563.24 |
| 4.1 | b) 6306 Ball bearing (TATA /SKF) | 10 | No | 860.13 | ₹8,601.3 |
| 4.2 | c) 6309 Ball bearing (TATA /SKF) | 6 | No | 1,813.29 | ₹10,879.74 |
| 4.3 | d) 6310 Ball bearing (TATA /SKF) | 4 | No | 2,026.69 | ₹8,106.76 |
| 5 | Providing & fitting fixing Shaft sleeve bush of approved quality.
i) For LI
(a) Cast iron (CI) | 10 | No | 872.43 | ₹8,724.3 |
| 5.1 | (b) Stainless Steel (SS) | 6 | No | 2,295.07 | ₹13,770.42 |
| 6 | Providing & fitting fixing Shaft sleeve nut of approved quality.
(a) Cast iron (CI) | 10 | No | 535.8 | ₹5,358 |
stage.html
html • 0.02 MB
finance_77805.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.86 MB
DNIeT_31_EE_2026-27.pdf
Tender Documents • 3.07 MB
BOQ_77805.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .