| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-Finance | L1 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | SIVAN PILLAI L1 |
|---|---|---|---|---|
| 1.00re tarring | ||||
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 110.66 | sqm | 471.41 ₹52,166.7 Lowest |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 29.89 | sqm | 363.65 ₹10,868.77 Lowest |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 918 | sqm | 18.48 ₹16,964.64 Lowest |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 918 | sqm | 337.39 ₹3,09,724.02 Lowest |
| 1.00 | OD27364/2026-2027: Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm
deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 429 | sqm | 36.75 ₹15,765.75 Lowest |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 53.62 | cum | 9,186.73 ₹4,92,638.4 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,182
Closing Date
25 Jul 2026, 2:00 pmClosed
Assistant Executive Engineer
Punalur Municipality
Annual Plan-Punalur Municipality Pro.No.125Painapple Pathekkar Premetric Hostel Arampunna road Re-tarring and Re-concrete in Pathekkar Ward-General Civil Work (Re tender)
2026_LSGD_860996_4
03/2026-27/AEE/LIDEW/PMC
Open Tender
Civil Works - Roads
Item Rate
180 days
Punalur Municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,182
Yes
27 Sept 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1re tarring | |||||
| 1.001 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 0.4 | sqm | - | - |
| 1.002 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | - | sqm | - | - |
| 1.003 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.004 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | - | sqm | - | - |
| 1.005 | OD27364/2026-2027: Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm
deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
| 1.006 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1456103.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.32 MB
Tendernotice_3.pdf
PDF • 0.30 MB
Tendernotice_4.pdf
PDF • 0.25 MB
Tendernotice_5.pdf
PDF • 0.30 MB
SBD125.pdf
Tender Documents • 1.73 MB
125FOT.pdf
Tender Documents • 0.18 MB
BOQ_1456103.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .