Tender Value
₹25.1 L
EMD Value
₹26,000
Closing Date
1 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Rajkot Irrigation Project Division Rajkot.
CONSTRUCTION OF MALJIBI PIPALIYA-2 CHECKDAM NEAR VILLAGE MALJIBI PIPALIYA TALUKA JAM KANDORNA OF RAJKOT DISTRICT
287984
Tender Notice No.24 of 2025-26
Open
Civil - All
Rajkot
6 documents required · 6 mandatory
₹1,500
Yes
Executive Engineer Rajkot Irrigation Project Division Rajkot.
₹26,000
Yes
18 Mar 2026
18 Mar 2026
18 Mar 2026
1 Apr 2026
18 Mar 2026
Item No. (with brief specification and reference to book of specifications) Quantity Unit Amount
Rs. In Words
Excavation in all sorts of strata and formations including depositing the unuseful excavated stuff as
and where directed including sorting and stacking useful materials as directed upto 200mt lead. And (Rupees Seventy
all lifts etc. complete, including dewatering. Nine Only)
(A) IN OVERBURDEN INCL. HARD MURRUM
Excavation in all sorts of strata and formations including depositing the unuseful excavated stuff as
(Rupees One
and where directed including sorting and stacking useful materials as directed upto 200mt lead. And
1B 608.00 Cum 176.00 Hundred Seventy Six
all lifts etc. complete, including dewatering.
(B) IN SOFT ROCK
Drilling 25mm dia holes at distance as specified and depth upto 3.0mt for check dam foundation & (Rupees Two
2 fixing anchor bars of specified diameter with cement grout incl cleaning holes as directed 72.00 Rmt. 252.00 Hundred Fifty Two
etc.(excluding cost of bars) only)
Providing,cutting,bending,binding and fixing in position as per drawing .TMT BAR , reinforcement for (Rupees Seventy Six
R.C.C. works and anchor bars incl cost of black annealed 16 to 18 BWG M.S.. Wire etc.complete with Thousand Five
all lead and lift. Hundred Seventy
(b) Fe-500 Four Only)
Prov. & Laying in position cement concrete using cement , sand and crushed metal coarse aggregate
(Rupees Three
by mass and machine mix for PCC/RCC including necessary formworks compaction by
Thousand Four
4 vibrator,curing as directed with all lead & lift etc complete. (Excluding cost of steel ) FOR .BODY 524.00 Cum 3423.00
Hundred Twenty
WALL, APRON, TRAINING WALL, SIDE WALL, SPLAY WALL, KEY WALL, CUT OF WALL ETC.
Three Only)
4/C) Controlled Concrete grade M-15 and MSA-40mm
(Rupees Three
Providing and fixing in position 100/110 mm dia PVC Pipe weep holes in the retaining
5 33.00 Rmt. 358.00 Hundred Fifty Eight
walls/sidewall/abt etc
Rehandling the excavated stuff incl stacking as and where directed for all sort of soil,soft murrum,
hard murrum, soft rock, hard rock etc. for specified lead as under and all lift incl loading unloading (Rupees Fifty Seven
transportation etc complete without rolling and watering. Only)
(a) Lead up to 200 mt.
Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand layers as base of
(Rupees Seven
inverted graded filter and without header stone but incl.hand packing trimming & dressing of slopes
7 193.00 Sqmt. 723.00 Hundred Twenty
etc complete.
Three Only)
A) 45 cms thick stone pitching
Providing and laying graded filters of sand,gravel/metal and over size metal ( 100 to 150 mm) (Rupees Five
8 behind the retaining wall & wing walls as directed as per approved drawing with all lead and lifts etc 18.00 Cum 530.00 Hundred Thirty
complete. Only)
(Rupees One
Providing and fixing in position white marble plate of size 45x45x1.8 cm incl ingraving the letters as
9 1.00 No's 1350.00 Thousand Three
per drawing/as directed etc complete.
Hundred Fifty Only)
Care & diversion of river/creek incl. required dewatering during construction of earthen dam, C.O.T.
(Rupees Twenty
and allied works as prescribed and directed etc. complete.
Four Thousand Eight
Hundred Six And
Seventy-Seven Only)
TOTAL Rs. :-
(Rupees Twenty Five Lakh Five Thousand Four Hundred Eighty-Three and Ninty-Three paisa Only)
I/We/ am/are willing to carry out the work at ---------------------- % Below / Above ………….. % ( should be written in figures and words) of the
estimated rates mentioned above amount of my / our tender works out as under
Estimated Amount Estimated Amount
Put to tender Rs……………….. Put to tender Rs………………..
Deduct …….. % Below Rs…………. Add …….. % Above Rs………….
Net Rs………… Total Rs…………
In words ………………………………………………. In words ……………………………………………
( Please strike out whichever is not applicable)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
4 S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Signature of Contractor Executive Engineer
Rajkot Irrigation Project Div.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. ONLINE_NOTICE.pdf
2.SBD Maljibi Pipaliya-2 New CD PART-1 (2).pdf
3.SBD Maljibi Pipaliya-2 New CD PART-2.pdf
4.SCHEDULE B Maljibi Pipaliya-2.pdf
Download all tender documents and submit your bid