Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | -36.47% | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹3.6 L (1.84%)Admitted-Finance | -35.30% | ₹2.0 Cr+₹3.6 L (1.84%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹9.6 L (4.94%)Admitted-Finance | -33.33% | ₹2.0 Cr+₹9.6 L (4.94%) | L3 | Admitted-Finance |
| 4 | L4₹2.1 Cr+₹19.9 L (10.2%)Admitted-Finance | -30.00% | ₹2.1 Cr+₹19.9 L (10.2%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹41.3 L (21.2%)Admitted-Finance | -23.00% | ₹2.4 Cr+₹41.3 L (21.2%) | L5 | Admitted-Finance |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
22 Jun 2026, 4:00 pmClosed
Xen RnB Division Kargil
Office of the Xen RnB Division Kargil
Construction of Multiutility Community Hall at Chatithang Mulbekh (NFB). (Under Capex)
2026_PWD_18918_2
Fresh E tender 06 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
240 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,100
Xen RnB Division Kargil
₹6.1 L
4 Jul 2026
10 Jun 2026
23 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A- PLATEFORM CUTTING | |||||
| 2Earthwork in excavation in bulk by mechanical means including lead /lift upto 50m and 1.5m respectively | |||||
| 2.1 | All kinds of Soil @50% | 2,406.25 | Cum | 202.78 | ₹4,87,939.38 |
| 2.2 | Ordinary rock @30% | 1,443.75 | Cum | 373.49 | ₹5,39,226.19 |
| 2.3 | Hard rock @20% | 962.5 | Cum | 1,064.92 | ₹10,24,985.5 |
| 3Earthwork in excavation in trenches by manual means including lead/ lift upto 50m and 1.5m respectively | |||||
| 3.1 | All kinds of Soil @60% | 9 | Cum | 433.78 | ₹3,904.02 |
| 4 | Providing and laying cement concrete in M 10 using 20mm size stone aggregate nallah including all carriage material | 240.75 | Cum | 6,243.92 | ₹15,03,223.74 |
| 5 | Centering and shuttering including strutting and propoing etc including removal of form work complete Wall any thickness | 535 | Sqm | 618.23 | ₹3,30,753.05 |
| 6 | Providing and fixing of Weep Hole 75mm dia PVC pipe | 150 | Mtr | 206.13 | ₹30,919.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
CORRIGENDUMRETENDERNIT06FRESH.pdf
Tender Documents • 0.50 MB
BOQ_45445.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .