| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | ₹10.4 L | L1 | Accepted-Finance There only one bidder remains after the financial evaluation and quoted at Estimate rate |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.4 L
EMD Value
₹26,100
Closing Date
5 Jun 2026, 2:00 pmClosed
Assistant Executive Engineer
220 kV substation, Malaparamba, Palachode Post
Enhancing the capacity of 110kV Bus with Triple Bersimis ACSR conductor at 220kV Substation, Malaparamba
2026_KSEB_851140_1
SSSD MRBA 01-Re02/2026-27 dated. 15.05.2026
Open Tender
Electrical Works
Percentage
90 days
Malaparamba
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹26,100
2 Jul 2026
20 May 2026
8 Jun 2026
20 May 2026
5 Jun 2026
20 May 2026
20 May 2026 - 5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. | - | Nos | 0.6 | - |
| 2 | Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing wherever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers. | - | Nos | 0.4 | - |
| 3 | Dismantling earth wire of size 7/9, 7/10 or 7/3.15mm from the top of columns and
terminal tower of 33/66/110/220kV substations, including transportation of materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. | - | Nos | 0.6 | - |
| 4 | Dismantling the droppers and connection from lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends, (for one phase) including transportation of materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. | - | Nos | 0.4 | - |
| 5 | Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf rSingle conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) | - | Nos | 0.2 | - |
| 6 | Dismantling the droppers and connection from lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Double conductor at both ends with compressed/ bolted ends, (for one phase) including transportation of
materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. | - | Nos | 0.4 | - |
| 7 | Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Double conductor at both ends with compressed/ bolted ends , fixing spacers at regular intervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) | - | Nos | 0.4 | - |
| 8 | Dismantling bus bar of ACSR Kundah Moose Doubleconductor for one phase of 110kV bus of span up to 35m including the insulator discs,including transportation of materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. | - | Nos | 0.6 | - |
| 9 | Providing droppers and connecting to lines / equipments or jumper between two buses with out suspension insulators for 220/110kV using ACSR Bersimis triple conductor at both ends with compressed/ bolted ends, fixing spacers at regular intervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) | - | Nos | 0.8 | - |
| 10 | Dismantling of droppers from bus to equipment with necessary suspension insulators using ACSR Moose/Kundah double conductor | - | Nos | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BidDocumentretender2.pdf
Tender Documents • 1.36 MB
BOQ_1438172.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .