Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹7,820
Closing Date
14 Feb 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER BARAMULLA
REW BARAMULLA
C/O CULVERT NEAR H/O AB RAHIM KUMAR WITH R-WALL AT BOTINGOO BLOCK - ZAINGEER UNDER B2V
2022_RDPR_159682_2
298/Xen/Rew/Bla/2021-2022 Dated. 07/02/2022
Open Tender
Civil Works
Item Rate
30 days
BARAMULLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
EXECUTIVE ENGINEER BARAMULLA
₹7,820
15 Feb 2022
7 Feb 2022
15 Feb 2022
7 Feb 2022
14 Feb 2022
7 Feb 2022
120 days
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Providing/Laying Stone soling Including carriage for 5 km
Providing and laying in position plain cement concrete 1:4:8 mix ratio M7.5 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)
Providing and laying in position Reinforcement cement concrete 1:1.5:3mix ratio using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level (Mild steel and medium tensile steel bars)
Centering and shuttering including strutting, propping etc. and removal of form for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platforms.
P/F of steel railing over wheel gaurds in structural steel including 2 coats of steel primer
Painting RED oxide with two coats of synthetic paint of approved brand and manufacture
Carriage of Sand/Bajiri for an average lead of 30 Km
Add Provision for signboard & photograph (Pre-Execution, during-Execution and Post-Execution) in concrete with Drawing will be provided by Concerned AEE/AE at the time of Execution.
Abdul Gani Rather
stage.html
html • 0.02 MB
finance_363128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .