Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT KUNJABANGADA PO DASAPALLA NAC PS DASAPALLA DIST NAYAGARH PIN 752084 | DASAPALLA | NAYAGARH | ODISHA | 752084 | Accepted-Technical qualified |
| 2 | Accepted-Technical A ANDULO P P 1 A BALLANTA DIST KHURDHA | BALLANTA | KHURDHA | ODISHA | Accepted-Technical qualified |
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
27 May 2026, 1:00 pmClosed
O/O BLOCK DEVELOPMENT OFFICER, SADAR BLOCK
O/O BLOCK DEVELOPMENT OFFICER, SADAR BLOCK
Development of Basic Tourism Infrastructure Facilities in Respect of Sidhamatha in Keonjhar District
2026_PRKSB_129600_6
TCN 03-KJRSADAR/2026-27
Open Tender
Civil Works - Others
Percentage
270 days
KEONJHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.2 L
Yes
29 May 2026
21 May 2026
28 May 2026
21 May 2026
27 May 2026
21 May 2026
21 May 2026 - 26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | 802.61 | cum | 276.9 | ₹2,22,242.71 |
| 2 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 537.73 | cum | 153.8 | ₹82,702.87 |
| 3 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 408.75 | cum | 814.8 | ₹3,33,049.5 |
| 4 | Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring ,shuttering etc.complete all depth and height. | 240.45 | cum | 5,640.47 | ₹13,56,234.09 |
| 5 | C.C. ( 1 : 3: 6 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 20.35 | cum | 6,021.6 | ₹1,22,539.56 |
| 6 | R.C.C. work in C.C. M-20 Grade of concrete using 20 mm & down graded size hg chips including hoisting & laying the concrete, watering and curing etc. including cost of centering and shuttering for the work etc. all complete to required levels laid in layers including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour complete
Base of Column | 203.64 | cum | 6,470 | ₹13,17,550.8 |
| 7 | Plinth Band | 34.63 | cum | 7,340.4 | ₹2,54,198.05 |
| 8 | Column & Beam (Ground floor)) | 36.17 | cum | 15,732.9 | ₹5,69,058.99 |
| 9 | Lintel(Ground Floor) | 1.56 | cum | 14,133.3 | ₹22,047.95 |
| 10 | waste slab | 56.23 | cum | 15,601.8 | ₹8,77,289.21 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
DTCN.pdf
Tender Documents • 0.65 MB
BOQ_592159.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .