Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
30 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CGM/Civil
C-4, District Center, Saket, New Delhi
Consultancy work for Construction of Rail Connectivity and Railway Siding at Sawarla Village for the Proposed Coal Handling Plant (CHP) with SILO System of Kolar Pimpri Expansion Opencast Mine, Wani North Area, WCL
2026_IRCON_298020_1
IRCON/1500024/PMC Kolar Pimpri Exp OC Mine Wani WCL/Tender
Limited
Consultancy
Lump-sum
225 days
Kolar Pimpri
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Yes
IRCON INTERNATIONAL LIMITED
₹2.4 L
Yes
17 Nov 2026
17 Nov 2026
1 Dec 2026
17 Nov 2026
30 Nov 2026
21 Nov 2026
90 days
Bill of Quantity
Name of Work Consultancy work for “Construction of Rail Connectivity and Railway Siding at Sawarla Village for the Proposed Coal Handling Plant (CHP) with SILO System of Kolar Pimpri Expansion Opencast Mine, Wani North Area, WCL.
Item No. Description/ Deliverables of works. Quoted Consultancy Fee
Stage-I Pre-Feasibility Study/ Survey and Feasibility Study Report (FSR) % quoted over Final FSR Cost
Stage-II On Detailed Project Report (DPR): % quoted over Final DPR Cost
GENERAL TERMS & CONDITIONS
The activity wise timeline mentioned with the following fee structures:
Stage-1: Consultancy fees on Pre-Feasibility Study/Survey and Feasibility Study Report (FSR): Quoted over the Final FSR Cost.
The FSR Cost shall be based on Pre-Feasibility Study/Survey of the agreed Project option finalized by WCL and approved by Railways as provided in Final FSR prepared by consultant.
Pre-Feasibility Study/Survey shall be evaluated on the basis of Drone Survey/Topo Sheet/ Reconnaissance Survey.
The lump sum rate for conducting Pre-Feasibility Study/Survey shall be as under:
Table 1: The lump sum rate for conducting Pre-Feasibility Study/Survey
Sl No. Route Length (Km) Lump Sum Rate (₹)
1 0-10 Km 5 Lakhs
2 10-20 Km 7.5 Lakhs
3 More than 20 Km 7.5 Lakhs plus @1 Lakh/Km for part thereof.
However, this amount shall be adjusted from final consultancy fees for preparation of Feasibility Study Report (FSR).
The deliverables with respect to Stage-I i.e. Pre-Feasibility Study/Survey and Feasibility Study Report (FSR) shall be as follows:
Table 2: Deliverables and Consultancy Fee Break up for Stage-I
S. No. Deliverables. Consultancy Fee: Quoted over Final FSR Cost
1 Pre-Feasibility Study/ Survey of all options to be done and submission to WCL for its acceptance. As provided above in Table 1.
2 Drawing of proposed alignment of agreed Project option along with its demarcation on Mouza/Revenue Plans. 20% of % quoted rate of final FSR
3 Submission of drawing along with draft Feasibility Study Report, and its acceptance WCL. 30% of % quoted rate of final FSR
4 In-Principle Approval (IPA) from Railways. 30% of % quoted rate of final FSR
5 Submission of final FSR with Final Location Survey (FLS) of approved option after incorporating approvals/observations from Railways as mentioned in Sl. No. 4 to WCL. 20% of % quoted rate of final FSR
Note No. 1: Advance amount at Sl. No. 1 shall be adjusted from Sl. No. 4 and Sl. No. 5
Stage-II: Consultancy fees on Detailed Project Report (DPR): Quoted over the Final DPR Cost.
The deliverables with respect to Stage-II i.e. Detailed Project Report shall be as follows:
Table 3: Deliverables and Consultancy Fee Break up for Stage-II:
S. No. Description/ Deliverables Consultancy Fee: % Quoted rate of Final DPR Cost
1 Submission of ESP/any other required drawing and draft DPR to WCL. 20% of % quoted rate of Final DPR Cost
2 On receipt of comments/observations of WCL on the draft DPR/ESP/any other required drawings as GAD of Bridges, working drawings of Bridges followed by Geotechnical investigation etc and submission to Railways for approval. 30% of % quoted rate of Final DPR Cost
3 On approval of ESP, submission and approval of L-section and other drawings as Detailed darwing & design of bridges (Preparation of GAD, Working drawing of bridges duly IIT proof checked, curves, followed by Geo-Technical investigation (If required) to Railways as well as submission of Final DPR to WCL after acceptance/ approval of ESP by Railways. 30% of % quoted rate of Final DPR Cost
4 Obtaining permission to start the construction work from Railways after statutory payment by WCL. 20% of % quoted rate of Final DPR Cost
Note No. 1: DPR should include cost of (a) Construction including Civil (Railway formation, station & other buildings), P. Way, Electrical/ OHE, S & T Work and (b) Operation (if required) and Maintenance. The period of Operation (if required) and maintenance is for Five (5) years.
Note No. 2: The maximum ceiling of allowed deviation of Final DPR Cost from Final FSR Cost shall be Fifteen Percent (15 %).
Price Bid Format
Name of Work Consultancy work for “Construction of Rail Connectivity and Railway Siding at Sawarla Village for the Proposed Coal Handling Plant (CHP) with SILO System of Kolar Pimpri Expansion Opencast Mine, Wani North Area, WCL.
Sl No. Description/ Deliverables of works. Unit Quoted Consultancy fees by Bidder (In %)
Stage-I Pre-Feasibility Study/ Survey and Feasibility Study Report (Includes In - Principle approval and Final FSR Approval) % of Final FSR
Stage-II Detailed Project Report (Approval of ESP , Approval of Other Drawings and Final DPR) % of Final DPR
1 Bidder quoting the lowest ‘total percentage’ shall be declared as L-1 bidder.
2 In case of non-fulfilment against any parameter, it shall be treated as zero percent for evaluation of total percent.
3 If there are more than one lowest bidder and since splitting up of subject work is not feasible, L-1 may be decided as under: -
4 All L-1 bidders may be advised to submit the reduced price offline & final L-1 may be decided on the basis of revised (reduced) Price.
Name of work : Consultancy work for “Construction of Rail Connectivity and Railway Siding at Sawarla Village for the Proposed Coal Handling Plant (CHP) with SILO System of Kolar Pimpri Expansion Opencast Mine, Wani North Area, WCL
ANNEXURE IV(AA) PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause 6. and 7. of ITT)
Name of tenderer/firm:
The following are the particulars of minor deviations from the requirements of the Tender Document:
Sr. no. Clause Deviations Price adjustment for each deviation/s
Note: 1. The Tenderer shall indicate price adjustment against each deviation in Annexure IV(AA) of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, please indicate ‘No Deviations’. In case, Performa of deviations is left as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Annexure, it will have no effect. 4. All deviations have been listed and priced in the financial proposal and deviations not priced will be treated as null and void and stand withdrawn.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tender_Document.pdf
Tender Documents • 1.83 MB
GCC.pdf
Additional Documents • 1.04 MB
SHE.pdf
Additional Documents • 0.66 MB
PMC.xls
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .