| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹3.7 L+₹20,075.98 (5.72%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹3.9 L+₹40,990.25 (11.7%)Rejected-AOC | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SATHEESH BABU N L1 | NOUFAL ALAMPADY L2 | SHAMSUDHEEN .T.U L3 |
|---|---|---|---|---|---|---|
| 1.00clearing grass | ||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 2.5 | Hectare | 44,324.53 ₹1,10,811.33 Lowest | 46,861.57 ₹1,17,153.93 | 49,504.56 ₹1,23,761.4 |
| 2.00Cutting trees and branches | ||||||
| 2.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 26 | each | 284.37 ₹7,393.62 Lowest | 300.65 ₹7,816.9 | 317.6 ₹8,257.6 |
| 2.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 26 | each | 509.01 ₹13,234.26 Lowest | 538.15 ₹13,991.9 | 568.5 ₹14,781 |
| 2.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 25 | each | 692.07 ₹17,301.75 Lowest | 731.69 ₹18,292.25 | 772.95 ₹19,323.75 |
| 2.00 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 25 | each | 936.54 ₹23,413.5 Lowest | 990.14 ₹24,753.5 | 1,045.99 ₹26,149.75 |
| 2.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 10 | each | 414.75 ₹4,147.5 Lowest | 438.49 ₹4,384.9 | 463.22 ₹4,632.2 |
| 2.01 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 10 | each | 1,848.1 ₹18,481 Lowest | 1,953.88 ₹19,538.8 | 2,064.08 ₹20,640.8 |
| 2.01 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 6 | each | 8,577.79 ₹51,466.74 Lowest | 9,068.77 ₹54,412.62 | 9,580.24 ₹57,481.44 |
Tender Value
₹4.7 L
EMD Value
₹11,645
Closing Date
17 Jul 2025, 11:00 amClosed
Assistant Executive Engineer
Head works Sub Division Malampuzha Irrigation
This work has been included under the action plan 2025-26 of The Malampuzha project. Due to heavy rain during monsoon many of the trees in canal bunds and camp area have uprooted and some are on the verge of falling down. Complaints have been
2025_Irrig_775873_1
IRR/PI/TR/3144/2025_5_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
364 days
Malampuzha
Please prefer tender document
5 documents required · 5 mandatory
₹1,030
₹11,645
Yes
19 Aug 2025
10 Jul 2025
18 Jul 2025
10 Jul 2025
17 Jul 2025
10 Jul 2025
10 Jul 2025 - 14 Jul 2025
Amount
clearing grass
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
Cutting trees and branches
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
OD6068/2025-2026:Engaging man mazdoor for various works to execute the work as per the directions of department officers at site
OD6069/2025-2026:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge.
NOUFAL ALAMPADY (BID ID -2253051)
SHAMSUDHEEN .T.U (BID ID -2251670)
Bidder Name
SATHEESH BABU N
SHAMSUDHEEN .T.U
NOUFAL ALAMPADY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1268218.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .