Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical REJECTED |
Tender Value
₹22.5 L
Closing Date
1 Jul 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CAPT RAKHI RAM
FMU(MBI) NAVAL DOCKYARD MUMBAI 400001
REPAIR RATE CONTRACT (RRC) FOR REPAIRS/ RENEWAL OF FIRE MAIN/ SEAWATER/FRESH WATER AND SANITARY SYSTEM PIPES CU NI 90/10 UP TO 10 BAR PRESSURE FITTED ONBOARD IN SHIPS
2021_NAVY_450335_1
FMU/344/RRC/SYSTEM PIPES
Open Tender
Marine Services
Turn-key
365 days
FMU(MBI) NAVAL DOCKYARD
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Payable To
Exempted
7 Jul 2021
10 Jun 2021
2 Jul 2021
11 Jun 2021
1 Jul 2021
11 Jun 2021
11 Jun 2021 - 24 Jun 2021
120 days
Amount
FOR 1ST YEAR
RATES FOR REPAIR/RENEWAL OF SYSTEM PIPES UPTO 10 BAR (Pipe size nominal diameter in MM)
SERVICE CHARGES
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
SPARES CHARGES
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
RATES FOR FASTNERS ON BOTH SIDE OF FLANGES
FASTNERS TYPE- SS 316
FASTNERS TYPE- SS 304
FASTNERS TYPE- AL BRONZE
FOR 2ND YEAR
RATES FOR REPAIR/RENEWAL OF SYSTEM PIPES UPTO 10 BAR (Pipe size nominal diameter in MM)
SERVICE CHARGES
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
SPARES CHARGES
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
Removal of pipe and blanking of both sides of system. Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor). Fitment of pipe and proving the system (after repair/renewal).
Pressure testing of pipe (1.5) times of working pressure (test equipments are to be provided by contractor)
Cleaning of internal parts for removal of biological growth and foreign particles by carrying out de-scaling with ROCHEM d-scaling or equivalent solvent, visual inspection and pressure testing. Preparation of report and scope of work as per FMU format (per ft.).
Repair of pipe (Material- Cu Ni (90:10)) by building up of material with Argon Arc (TIG) with Cu Ni (90:10) filler (per pipeline).
Machining of end flanges as required. Welding of flanges with Argon Arc (TIG) with Cu Ni (90:10) filler / securing brackets (per flange).
Renewal of pipe (Material- Cu Ni (90:10)) if pitting or crack/ hole in excess (per ft.).
Renewal of flanges (Gun metal) (per piece).
Renewal of composite flange (Cu Ni 90:10) with steel collar (per flange)
Renewal of adopter and nipple (per set of adaptor and nipple)
Renewal of existing zinc rings (per piece).
Renewal of fastener ( to be quoted per nut, bolt & washer) on both sides of pipe flanges
Renewal of Gasket (per piece) of existing material of Champion make or equivalent.
Renewal of pressure gauge line (Copper) (per ft.)
Lagging of system as per requirement (per ft.).
In-situ onboard gauging of pipes for modification.(per pipeline).
RATES FOR FASTNERS ON BOTH SIDE OF FLANGES
FASTNERS TYPE- SS 316
FASTNERS TYPE- SS 304
FASTNERS TYPE- AL BRONZE
ULTRA MARINE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .