| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-AOC | L1 | Accepted-AOC L1- Bidder | |
| 2 | L2₹35.9 L+₹30,272 (0.85%)Rejected-Finance | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹39.9 L+₹4.3 L (12.1%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹41.8 L+₹6.2 L (17.6%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | Nikhat nirman L4 | M/S PIYUSH CONSTRUCTION COMPANY L3 | chhaba construction L2 | SNEH CORPORATION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches, n exc 1.5m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out in soft/loose soil complete all as specified and as directed. | 32 | Cum | 350 ₹11,200 | 150 ₹4,800 Lowest | 250 ₹8,000 | 200 ₹6,400 |
| 2.00 | Excavating in trenches, n exc 1.5m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out in hard/dense soil complete all as specified and as directed. | 24 | Cum | 500 ₹12,000 | 300 ₹7,200 Lowest | 300 ₹7,200 Lowest | 300 ₹7,200 Lowest |
| 3.00 | Demolition of brick/block or stone/boulder masonry walling built in cement mortar including all quoins arches pillars etc and removal unserviceable materials, debris, rubbish to out side MD land complete all as specified and as directed. | 2 | Cum | 500 ₹1,000 | 550 ₹1,100 | 50 ₹100 Lowest | 500 ₹1,000 |
| 4.00 | Removing building materials etc. (other than spoil payable under items 03028 to 03031 in Section-3—Earthwork) to a distance of 100m or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination complete all as specified and directed. | 20 | Per Load | 200 ₹4,000 Lowest | 200 ₹4,000 Lowest | 1,000 ₹20,000 | 550 ₹11,000 |
| 5.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick of excavated soil complete all as specified and as directed. | 31.75 | Cum | 50 ₹1,587.5 | 150 ₹4,762.5 | 40 ₹1,270 Lowest | 80 ₹2,540 |
| 6.00 | Removal of excavated soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and as directed. | 25.25 | Cum | 50 ₹1,262.5 Lowest | 180 ₹4,545 | 50 ₹1,262.5 Lowest | 150 ₹3,787.5 |
| 7.00 | Disconnecting of existing overhead water tanks any type of capacity exc 500 Ltr but n exc 1000 ltr setting aside (or lowering if required) for repairing, cleaning etc and hoisting and reconnecting and refixing in position complete all as specified and directed. | 2 | Each | 1,000 ₹2,000 | 1,000 ₹2,000 | 50 ₹100 Lowest | 400 ₹800 |
| 8.00 | Demolition of cement concrete in roof padding damaged/loose cement concrete / brick tiles from roof/ terrace to a depth of average 50mm including dismantling of existing treatment with APP modified membrane if any cleaning with water and removal unserviceable materials, debris and rubbish to a distance out side MoD land complete all as specified and directed. | 12 | Cum | 500 ₹6,000 | 1,000 ₹12,000 | 50 ₹600 Lowest | 400 ₹4,800 |
| 9.00 | Demolition of cement concrete in ground floors and pavings not exc 15 cm thickness (below or above ground level) and removal unserviceable materials, debris and rubbish to a distance out side MoD land complete all as specified and as directed. | 20 | Cum | 200 ₹4,000 | 850 ₹17,000 | 50 ₹1,000 Lowest | 400 ₹8,000 |
| 10.00 | M&L for Precast cement concrete 1:3:6 type C1 (20mm graded aggregate) solid block masonry exc. 10 cm in width and setting in cement mortar 1:6 complete all as specified and directed. | 30 | Cum | 5,000 ₹1,50,000 | 4,800 ₹1,44,000 Lowest | 5,500 ₹1,65,000 | 6,000 ₹1,80,000 |
Tender Value
₹41.0 L
EMD Value
₹81,994
Closing Date
4 Apr 2026, 6:00 pmClosed
GE ARMY NO. 1 JODHPUR
GE ARMY NO. 1 MULTAN LINES ARMY AREA JODHPUR
SPECIAL REPAIR OF BLDG No P-717 ADM BLOCK (OFFICE COMPLEX) OF TK TPTR PL ASC AND OTHER SANCTIONED WORKS UNDER THE AREA OF AGE B/R-II OF GE (ARMY) No 1 JODHPUR
2026_MES_756284_1
GE/JODH (A) No 1 OF 2025-26 (9397/E8)
Open Tender
Civil Works
Item Rate
180 days
Jodhpur
Please refer tender documents
7 documents required · 7 mandatory
₹500
GE (A) No 1
₹81,994
Yes
4 May 2026
14 Mar 2026
7 Apr 2026
14 Mar 2026
4 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches, n exc 1.5m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out in soft/loose soil complete all as specified and as directed. | 32 | Cum | 31,00,000 | ₹9,92,00,000 |
| - | Excavating in trenches, n exc 1.5m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out in hard/dense soil complete all as specified and as directed. | 24 | Cum | 31,00,000 | ₹7,44,00,000 |
| - | Demolition of brick/block or stone/boulder masonry walling built in cement mortar including all quoins arches pillars etc and removal unserviceable materials, debris, rubbish to out side MD land complete all as specified and as directed. | 2 | Cum | 31,00,000 | ₹62,00,000 |
| - | Removing building materials etc. (other than spoil payable under items 03028 to 03031 in Section-3—Earthwork) to a distance of 100m or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination complete all as specified and directed. | 20 | Per Load | 31,00,000 | ₹6,20,00,000 |
| - | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick of excavated soil complete all as specified and as directed. | 31.75 | Cum | 31,00,000 | ₹9,84,25,000 |
| - | Removal of excavated soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and as directed. | 25.25 | Cum | 31,00,000 | ₹7,82,75,000 |
| - | Disconnecting of existing overhead water tanks any type of capacity exc 500 Ltr but n exc 1000 ltr setting aside (or lowering if required) for repairing, cleaning etc and hoisting and reconnecting and refixing in position complete all as specified and directed. | 2 | Each | 31,00,000 | ₹62,00,000 |
| - | Demolition of cement concrete in roof padding damaged/loose cement concrete / brick tiles from roof/ terrace to a depth of average 50mm including dismantling of existing treatment with APP modified membrane if any cleaning with water and removal unserviceable materials, debris and rubbish to a distance out side MoD land complete all as specified and directed. | 12 | Cum | 31,00,000 | ₹3,72,00,000 |
| - | Demolition of cement concrete in ground floors and pavings not exc 15 cm thickness (below or above ground level) and removal unserviceable materials, debris and rubbish to a distance out side MoD land complete all as specified and as directed. | 20 | Cum | 31,00,000 | ₹6,20,00,000 |
| - | M&L for Precast cement concrete 1:3:6 type C1 (20mm graded aggregate) solid block masonry exc. 10 cm in width and setting in cement mortar 1:6 complete all as specified and directed. | 30 | Cum | 31,00,000 | ₹9,30,00,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TENDERDOCUMENTS.pdf
Tender Documents • 2.63 MB
BOQ_847133.xls
BOQ • 3.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .