Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹95.1 L+₹1.1 L (1.15%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹96.3 L+₹2.3 L (2.43%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹98.4 L+₹4.4 L (4.73%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI SHIVA SAI ASSOCIATES L2 | SRI DURGA ENGINEERING WORKS L3 | BHARATHI INDUSTRIAL CONTROLS L1 | K.C.K ENGINEERING WORKS L4 |
|---|---|---|---|---|---|---|---|
| 1.00Process Description | |||||||
| 1.01 | Cleaning, Overhauling and minor repair of belt grinding head units for Fuel Tube Grinding Machine. ZFP have 4 numbers of fuel tube grinding machine. Above machines nave collectively 17 no's of grinding heads in it & contractor have to do given repair work once in every four month i.e. 17 heads X 6 times = 102 no's
• Complete cleaning and dismounting of grinding head assemblies from the machine.
• Mounting of reconditioned /spare head assembly.
• Checking of alignment and trial runs.
• Dismantling/inspection of all parts of the grinding heads for overhauling.
• Minor repairs and replacement of worn-out parts.
• Final assembly and lubrication of parts. | 102 | NOS | 20,100 ₹20,50,200 | 20,252 ₹20,65,704 | 13,000 ₹13,26,000 | 10,800 ₹11,01,600 Lowest |
| 1.02 | Cleaning, Overhauling and minor repair of belt grinding head units for sheets and strips machine. Above machine having 3 no's of grinding heads in it & contractor have to do given repair work once in every three month i.e. 3 heads X 8 times = 24 no's
• Complete cleaning and dismounting of grinding head assemblies from the machine.
• Mounting of reconditioned /spare head assembly.
• Checking of alignment and trial runs.
• Dismantling/inspection of all parts of the grinding heads for overhauling.
• Minor repairs and replacement of worn-out parts.
• Final assembly and lubrication of parts. | 24 | NOS | 30,500 ₹7,32,000 | 30,379 ₹7,29,096 | 13,000 ₹3,12,000 Lowest | 13,200 ₹3,16,800 |
| 1.03 | Cleaning, overhauling and minor repair of polishing head units. ZFP have 6 no's of polishing heads & contractor have to do given repair work once in every 4 month i.e. 6 heads X 6 times = 36 no's
• Complete cleaning and dismounting of polishing head assemblies from the machine.
• Mounting of reconditioned /spare head assembly.
• Checking of alignment and trial runs.
• Dismantling/inspection of all parts of the polishing heads for overhauling.
• Minor repairs and replacement of worn-out parts.
• Final assembly and lubrication of parts. | 36 | NOS | 30,500 ₹10,98,000 | 30,379 ₹10,93,644 | 13,000 ₹4,68,000 Lowest | 14,400 ₹5,18,400 |
| 1.04 | Cleaning, overhauling and minor repair of conveyor table units. ZFP have 8 no's of conveyor table units & contractor have to do given repair work once in every 3 months i.e. 8 Tables X 8 times = 64 no's
• Cleaning and inspection of parts for any damage/wear-out.
• Minor repairs and replacement of worn-out parts
• Assembly and lubrication of rotating parts.
• Checking of alignment and trial runs. | 64 | NOS | 20,580 ₹13,17,120 | 20,702 ₹13,24,928 | 13,000 ₹8,32,000 Lowest | 13,200 ₹8,44,800 |
| 1.05 | Cleaning, overhauling and minor repair of gear box units. ZFP have 17 no's of gear box units used for regulating wheel & contractor have to do given repair work once in every 3 months i.e. 17 Gear Box X 8 times = 136 no's
• Oil draining, cleaning and inspection of parts for any damage/wear-out.
• Minor repairs and replacement of worn-out parts.
• Final assembly, gear oil filling and performance trials. | 136 | NOS | 7,580 ₹10,30,880 Lowest | 8,281 ₹11,26,216 | 13,000 ₹17,68,000 | 10,800 ₹14,68,800 |
| 1.06 | Preventive Maintenance of HPTR Pilger Mills. ZFP have 4 no’s of HPTR Pilger Mills & contractor have to do given repair work once in every month i.e. 4 HPTR Pilger Mills X 24 times = 96 no's
• Main Gear Box Oil draining, cleaning and inspection of parts for any damage/wear-out.
• Rocker arm and link adjustment. Minor repairs and replacement of worn-out parts.
• Final assembly, gear oil filling and performance trials.
• Leak arresting in coolant lines including welding work and gear pump overhauling. | 96 | NOS | 8,950 ₹8,59,200 | 8,100 ₹7,77,600 Lowest | 13,000 ₹12,48,000 | 19,200 ₹18,43,200 |
| 1.07 | Preventive Maintenance of 50 VM & 25 VMR Pilger Mills. Preventive maintenance 50 VM Pilger Mill once in every month + Preventive maintenance 25 VM Pilger Mill once in every month i.e. 24 + 24 = 48 Nos
• F & T Box Oil draining, cleaning and inspection of parts for any damage/wear-out.
• Oil leak arrest in hydraulic & coolant pumps/system. Overhauling of gear pumps, fabrication of worn out parts and replacement.
• Greasing in crankshaft & lay shaft bearings.
• Flat belt tensioning & pulley alignment. | 48 | NOS | 8,150 ₹3,91,200 Lowest | 8,281 ₹3,97,488 | 13,000 ₹6,24,000 | 18,000 ₹8,64,000 |
| 1.08 | Preventive Maintenance of Cranes.
a) 10 Ton capacity EOT Cranes - 1 Nos
Given work in every 2 month
b) 5 Ton capacity EOT Cranes - 1 Nos
Given work in every 2 month
c) 4 Ton capacity EOT Cranes - 1 Nos
Given work in every 2 month
d) 2 Ton Under slung Cranes-2Nos
Given work in every 4 month
e) 2 Ton capacity EOT Cranes-2Nos
Given work in every 2 month
f) 1 Ton Under slung Cranes-1Nos
Given work in every 2 month
• Hoist brake adjustment, wire rope clamp check up, LT brake check up, hook latch check & repair of above component if required
• Greasing in wire rope & crane wheel bearings
• LT & CT Gear Box Oil draining, cleaning and inspection of parts for any damage/wear-out. Replacement of worn out parts.
• Replacement of LT & CT wheel damaged bearings. | 84 | NOS | 10,250 ₹8,61,000 | 10,126 ₹8,50,584 Lowest | 13,000 ₹10,92,000 | 15,600 ₹13,10,400 |
| 1.09 | Preventive Maintenance/minor repair of Vacuum Furnaces and water pipe lines.
a) Vertical vacuum Furnace-3Nos
Given work in every 1 month
b) Horizontal vacuum Furnace-3Nos
Given work in every 1 month
• Dechocking of cooling water lines & replacement of damaged/corroded cooling water pipe lines including welding work.
• Greasing over stinger rods & replacing of wilson seals.
• Oil & seals replacement of Vacuum pumps. | 144 | NOS | 7,550 ₹10,87,200 Lowest | 8,281 ₹11,92,464 | 11,000 ₹15,84,000 | 10,200 ₹14,68,800 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
13 May 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Birender Kumar
SM, MM(FT), Nuclear Fuel Complex, Hyderabad
Assistance in carrying out preventive maintenance, Overhauling and minor repair works of equipment in ZFP
2022_NFC_685567_1
NFC/M-ZF/56/WC/2021-22/01
Open Tender
Support/Maintenance Service
Works
730 days
NFC, Hyderabad
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹2.0 L
1 Aug 2022
26 Apr 2022
14 May 2022
26 Apr 2022
13 May 2022
1 May 2022
30 Apr 2022 - 10 May 2022
180 days
Amount
Process Description
Cleaning, Overhauling and minor repair of belt grinding head units for Fuel Tube Grinding Machine. ZFP have 4 numbers of fuel tube grinding machine. Above machines nave collectively 17 no's of grinding heads in it & contractor have to do given repair work once in every four month i.e. 17 heads X 6 times = 102 no's • Complete cleaning and dismounting of grinding head assemblies from the machine. • Mounting of reconditioned /spare head assembly. • Checking of alignment and trial runs. • Dismantling/inspection of all parts of the grinding heads for overhauling. • Minor repairs and replacement of worn-out parts. • Final assembly and lubrication of parts.
Cleaning, Overhauling and minor repair of belt grinding head units for sheets and strips machine. Above machine having 3 no's of grinding heads in it & contractor have to do given repair work once in every three month i.e. 3 heads X 8 times = 24 no's • Complete cleaning and dismounting of grinding head assemblies from the machine. • Mounting of reconditioned /spare head assembly. • Checking of alignment and trial runs. • Dismantling/inspection of all parts of the grinding heads for overhauling. • Minor repairs and replacement of worn-out parts. • Final assembly and lubrication of parts.
Cleaning, overhauling and minor repair of polishing head units. ZFP have 6 no's of polishing heads & contractor have to do given repair work once in every 4 month i.e. 6 heads X 6 times = 36 no's • Complete cleaning and dismounting of polishing head assemblies from the machine. • Mounting of reconditioned /spare head assembly. • Checking of alignment and trial runs. • Dismantling/inspection of all parts of the polishing heads for overhauling. • Minor repairs and replacement of worn-out parts. • Final assembly and lubrication of parts.
Cleaning, overhauling and minor repair of conveyor table units. ZFP have 8 no's of conveyor table units & contractor have to do given repair work once in every 3 months i.e. 8 Tables X 8 times = 64 no's • Cleaning and inspection of parts for any damage/wear-out. • Minor repairs and replacement of worn-out parts • Assembly and lubrication of rotating parts. • Checking of alignment and trial runs.
Cleaning, overhauling and minor repair of gear box units. ZFP have 17 no's of gear box units used for regulating wheel & contractor have to do given repair work once in every 3 months i.e. 17 Gear Box X 8 times = 136 no's • Oil draining, cleaning and inspection of parts for any damage/wear-out. • Minor repairs and replacement of worn-out parts. • Final assembly, gear oil filling and performance trials.
Preventive Maintenance of HPTR Pilger Mills. ZFP have 4 no’s of HPTR Pilger Mills & contractor have to do given repair work once in every month i.e. 4 HPTR Pilger Mills X 24 times = 96 no's • Main Gear Box Oil draining, cleaning and inspection of parts for any damage/wear-out. • Rocker arm and link adjustment. Minor repairs and replacement of worn-out parts. • Final assembly, gear oil filling and performance trials. • Leak arresting in coolant lines including welding work and gear pump overhauling.
Preventive Maintenance of 50 VM & 25 VMR Pilger Mills. Preventive maintenance 50 VM Pilger Mill once in every month + Preventive maintenance 25 VM Pilger Mill once in every month i.e. 24 + 24 = 48 Nos • F & T Box Oil draining, cleaning and inspection of parts for any damage/wear-out. • Oil leak arrest in hydraulic & coolant pumps/system. Overhauling of gear pumps, fabrication of worn out parts and replacement. • Greasing in crankshaft & lay shaft bearings. • Flat belt tensioning & pulley alignment.
Preventive Maintenance of Cranes. a) 10 Ton capacity EOT Cranes - 1 Nos Given work in every 2 month b) 5 Ton capacity EOT Cranes - 1 Nos Given work in every 2 month c) 4 Ton capacity EOT Cranes - 1 Nos Given work in every 2 month d) 2 Ton Under slung Cranes-2Nos Given work in every 4 month e) 2 Ton capacity EOT Cranes-2Nos Given work in every 2 month f) 1 Ton Under slung Cranes-1Nos Given work in every 2 month • Hoist brake adjustment, wire rope clamp check up, LT brake check up, hook latch check & repair of above component if required • Greasing in wire rope & crane wheel bearings • LT & CT Gear Box Oil draining, cleaning and inspection of parts for any damage/wear-out. Replacement of worn out parts. • Replacement of LT & CT wheel damaged bearings.
Preventive Maintenance/minor repair of Vacuum Furnaces and water pipe lines. a) Vertical vacuum Furnace-3Nos Given work in every 1 month b) Horizontal vacuum Furnace-3Nos Given work in every 1 month • Dechocking of cooling water lines & replacement of damaged/corroded cooling water pipe lines including welding work. • Greasing over stinger rods & replacing of wilson seals. • Oil & seals replacement of Vacuum pumps.
Preventive Maintenance/ minor repair of rolling mill, In every 2 months i.e. 1 equipment X 12 times = 6 nos. • Adjustment of synchronization clutch assembly. • Overhauling of screw down geared motor including brake adjustment • Inlet outlet table conveyer overhauling by replacement of damaged bearings, chains and sprockets. • Oil leak arrest in hydraulic & coolant pumps/system. Overhauling of gear pumps, fabrication of worn out parts and replacement
SRI SHIVA SAI ASSOCIATES
SRI DURGA ENGINEERING WORKS
K.C.K ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .