Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹31.7 L
EMD Value
₹32,000
Closing Date
2 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the Executive Engineer, Bhavnagar Irrigation Division, Bhavnagar
Shetrunji Irrigation Scheme:-Improvement of Super passage at Ch.72701 mt. of S.L.B.C.
356641
21 For 2026-27
Open
Civil Works - Water Works
Works
Bhavnagar
13 documents required · 12 mandatory · 1 optional
₹1,500
EXECUTIVE ENGINEER, BHAVNAGAR IRRIGATION DIVISION BHAVNAGAR
₹32,000
18 Oct 2026
18 Oct 2026
18 Oct 2026
2 Nov 2026
18 Oct 2026
120 days
Item Rate In
specification and reference to book of Quantity Unit Amount
No figures
specifications)
Item no.
Dismantling of RCC work viz. slab,
beam, lintel, barrel, staircase, etc.
including removing the steel from the
1.0 dismantled portion without damage to 4.80 Cum 1362.00
reinforcement sorting and stacking of
useful and unuseful material from the
dismantled material as directed etc comp.
Item no.
Dismantling stone/brick masonry &
stacking of useful and unuseful material
2.0 from the dismantled materials as directed 77.60 Cum 616.00
etc complete.
(a) In cement mortar
Item no.
Excavation in all sort of strata and
formations incl. depositing the unuseful
excavated stuff as and where directed incl
3.0 sorting and stacking useful materials as 307.60 Cum 83.00
directed upto 30 mt lead etc. complete
incl. dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation trenches
of C.D. works ).
ITEM NO.04
Prov. & Laying in position "NOMINAL
MIX' cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for C.C. work incl.
necessary formworks centering Cum
scaffolding compaction by mechanical
vibrator,curing as directed with all lead &
lift etc complete
C) Concrete grade 1:2:4 and MSA-40mm
ITEM NO.05
Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including
necessary formworks centering
5.0 scaffolding compaction by mechanical 325.0 Cum 5157.00
vibrator,curing as directed with all lead &
lift etc complete Excluding the cost of
reinforcement
FOR PIER AND ABT.
B) Concrete grade M-20 and MSA-
Item no.
Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate bymass and machine
mix for R.C.C/CC work including
necessary formworks centering
scaffolding compaction bymechanical
vibrator,curing as directedwith all lead&
lift etc complete Excluding the cost of
reinforcement FOR SOLID SLAB OF
ROAD BRIDGE A) Concrete grade M-20
and MSA-20mm
Item no.
Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate bymass and machine
mix for R.C.C/CC work including
necessary formworks centering
scaffolding compaction bymechanical
vibrator,curing as directedwith all lead&
lift etc complete Excluding the cost of
reinforcement FOR SOLID SLAB OF
ROAD BRIDGE.
C) Concrete grade M-25 and MSA-20mm
Item no.
Providing,cutting,bending,binding and
fixing in position as per drawing .TMT
BAR , reinforcement for R.C.C. works
and anchor bars incl cost of black
annealed 16 to 18 BWG M.S. Wire
etc.complete with all lead and lift.
Item no.
from out side borrow area ,or from
9.0 excavated useful material including 324.60 Cum 84.00
watering ramming, consolidation with
pneumatic temping and all lead and lift
etc complete.
Item no.
Providing & filling in contraction joints
10.0 with 12mm thick bitumen sheet of 12.10 Sqmt 702.00
approved quality as directed.
ITEM NO.11
Providing Photography and Drone
11.0 Videography of the work as per the 1.0 Job 5000.00
instruction of engineer in charge.
Item no.
Care & diversion of river/creek incl.
required dewatering during construction 1 % of
of earthen dam, C.O.T. and allied works estimate
as prescribed and directed etc. complete.
I/We am/are willing to carry out the work at… ....................... % above/below percent
be written in figures and words) of the estimated rate mentioned above. Amount of my
/our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Improvement of Super passage at Ch.72701.pdf
BOQ Improvement of Super passage at Ch.72701.pdf
Tender Notice No.21 For 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .