Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC C O MODERN FURNITURE B I BAZAR BAREILLY CANTT BAREILLY 243001 UP | BAREILLY | BAREILLY | UP | 243001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹13.5 L+₹1.0 L (8.02%)Rejected-Finance | L2 | Rejected-Finance Being High Bid | |
| 3 | L3₹15.0 L+₹2.5 L (20.1%)Rejected-Finance V P O SAROTARI TEHSIL BAROH DISTRICT KANGRA PIN 176037 HP | KANGRA | HIMACHAL PRADESH | 176037 | L3 | Rejected-Finance Being High Bid |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
12 Mar 2024, 6:00 pmClosed
CWE Bareilly
HQ, CWE, MES, Station Road, Bareilly
CWE BLY/GE (W) / 81 OF 2023-24 REPAIR/MAINT AS COMPREHENSIVE MAINTAINANCE OF BOILER, LAUNDRY AND INCINERATOR PLANT AND CONNECTED ITEMS INSTALLED AT MH BAREILLY UNDER GE (WEST) BAREILLY
2024_MES_642177_1
8100/B/797/E8
Open Tender
Civil Works
Item Rate
180 days
GE (West) Bareilly
As per NIT
6 documents required · 6 mandatory
₹500
GE (West) Bareilly
₹28,000
Yes
28 Mar 2024
13 Feb 2024
14 Mar 2024
13 Feb 2024
12 Mar 2024
27 Feb 2024
Amount
Laundry Plant:- AMC for 06 months of Laundry Plant make-STEFAB including repair/replacement of major and minor spare parts of the following equipments/machinery, required during AMC without any extra cost to Govt by the OEM of the Laundry plant i.e. STEFAB or authorised Engineering company/or any other manufacturing company of Laundry Machines having CE certified and ISO company. 1. Washer Extractor 30 Kg-04Nos. Model AXS 30 Make:- STEFAB 2. Washer Extractor 60 Kg-02Nos. Model AXS 60 Make:- STEFAB 3. Drying ironer heated chest type Model FS 21 - 01 No Make-STEFAB 4. Industrial Drying Tumbler 60 Kg -02Nos. Model DRS 60 Make:- STEFAB 5. Flat bed press -03 Nos. Make:- STEFAB 6. Vaccum Finishing Table -01No. Make:- STEFAB 7. Air Compressor 5HP- 01No.. Note: - Contractor shall keep the following aspects in mind while quoting unit rates and rates quoted shall be deemed to be involving the following: -
(i) All above relevant documents must be submitted for approval before entering into AMC with firm. (ii) All defective parts will be replaced by contractor within 48 Hrs as per under mentioned Laundry Plant . Replacement cost of defective parts is to be included in above mentioned AMC Rates. (iii) In order to certify proper maint of the plant , monthly & breakdown visits of Engineer/technician from OEM/Approved firm to check efficient running of Laundry Plant is mandatory on part of contractor.The unit rates quoted by the tenderer shall be deemed to be included this aspect. Necessary documents in support of visit of authorised representatives from OEM/Approved firm shall be submitted by the contractor after each visit. On Failure of visit by OEM/Approved firm representative or non submission of report by him, a panel recovery of Rs 15000/- per visit shall be made from the contractor dues. (iv) Contractor shall enter into an agreement with OEM/Approved firm company for AMC and submit to GE (W) Bareilly after acceptance of works within 15 days.
AMC includes monthly visit of qualified and experienced technician/engineer and Inspection, dismantling and taking down the needful items in connection to carry out necessary repair/maintenance of all machines of Laundry Plant and replacement of spares and complete assembling after repair/overhauling, servicing, cleaning and testing so as to make the machine functional in all aspects.
Cost of minor parts such as nuts, bolts,screws, clamps, T&Ps, oiling, greasing, cleaner liquid for steam pipes,GI/SS fittings, V-belts etc, deemed to be included in the quoted rates,Belts of drying ironer,clothes/cover of flat bed press ,rubber hose pipe,V Belts any size and type,main door rubber gasket for washer extractor 30/60kg.,Stainless steel Door lock of washer extractor 30/60Kg. ,servicing and programming setting /resetting of the display card of Laundry Machines,replacement of an type of contactor,display meter,push buttons,deemed to be included in the quoted rates.
Hydraulic Shocker, Operating computer ST06, Steam solenoid Valve , Fuse link 4 Amps, Electric buzzer, Door limit switch, motors rewinding , Main bearing set, Water solenoid valve, Drain valve, PU pipe for level , 3 Way water solenoid valve, Motor plate welding, deemed to be included in the quoted rates.
Steam radiator, Single phase preventor,Digital temperature controller,Air hose pipe, Air flow control valve, Padding marina wool for bed press, Knobs ,Solenoid valve, Steam Trap Valve, Pressure Release Valve,power controlling card of VFD, main control command cable for Microsoft in between controller and relay power card ,display card ,deemed to be included in the quoted rates
Cleaning of chocked Steam pipelines and steam trap Valves and welding and replacement of coupling, joints ,union etc if required to stop leakage of water and steam from the pipelines.
All major/minor spare parts required during AMC shall deemed to be included in the quoted rate.
The cost of transportation if any required is deemed to be included in the quoted rate.
Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
Opening dismantling and disconnecting all water connection and electrical connection of Drying tumbler capacity of 60 Kg make- STEFAB and reassemble the same for repair after removing nuts and bolts and replacement of counter bearings of suitable size with bush & sleeves for drying tumbler 60kg. including Oiling, cleaning, servicing and greasing, balancing and alignment of cylindrical basket, balancing of blower, shaft turning, descaling and servicing of steam radiator for the smooth functioning of the machine complete all as directed.
M&L opening dismantling and disconnecting of steam radiator for Drying tumbler capacity of 60 Kg make- STEFAB and reassemble the same after replacing steam radiator for the smooth functioning of the machine complete all as specified and directed.
M&L opening dismantling and disconnecting of us drain valve of water exactor capacity of 60/30 Kg make- STEFAB and reassemble the same after replacing same for the smooth functioning of the machine complete all as directed.
B. Steam Boiler Comprehensive maintenance of Steam Boiler quantity - One Nos of Capacity 600 Kg/Hr Make Thermax, Model Revomax RXA-06 for 06 months by the service technician of OEM Thermax/Delta Therm or approved by Engineer In-charge/GE .
The Comprehensive maintenance Service package covers the following:
Site visit for preventive maint and check up of Steam boiler will be carried out by service technician of as recommended by the OEM every month during the contract period. In the visit, technician will check and inspect of both steam boiler plant system complete of capacity 600Kg/Hr .
Contractor must submit the service reports every month from the Service Engineers along with the details of the Repair/maint/replacement of spares/testing of Steam Boilers carried out during Every month during the contract period. On Failure of visit by OEM/Approved firm representative or non submission of report by him, a panel recovery of Rs 1000/- per visit shall be made from the contractor dues.
Cleaning of chocked coil by descaling steam boiler -02 Nos, if required engineer shall be supervising the descaling activity with Descaling Chemical (i.e. Chemical recommended by OEM).
Servicing/repair of all water pumps including replacement of unserviceable seals and glands , and servicing ,greasing /alignment of shaft/testing complete of all motors of both Steam Boilers.
Servicing/repair/testing of electric control panel and replacement of unserviceable minor spares like meter , wiring etc complete of both Steam Boilers.
Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
a) Base operation checks to bring the equipment in optimum condition
b) Scheduled check up visits for general health check up
c) Preventive and predictive maintenance guidance during these visits
d) Performance optimization
e) Break down service support
f) Recommendations for improved performance
g) Service History Mapping
h) Safety Checks
The contractor must ensure the following once the contract period strated:
a) An optimum performance level of Boilers is maintained
b) A consistent service level is delivered
c) Operating parameters to be monitored
d) The above services will result in equipment uptime to be increased
f) Input parameters of the system to be monitored as well as compared
LIST OF SPARES COVERED IN COMPREHENSIVE MAINTENANCE CONTRACT (IF REQUIERED TO BE REPLACED). BOILER MODEL - RXA-06 - two Nos
Ball Bearing (HCA-5)
Rewinding of motor including greasing and replacement of ball bearing
Ball Valve 15mm/20mm
Burner Rod Assembly TXCR
Cable High Tension Wire
Cap for Photocell Mounting (Rubber Cap)
Diffuser Plate-Dia 132mm
Electrode assly
Electrode Cap
Filter Element
Gland Washer (HTN-8)
Hooter Round
Hose Metallic Braided 3/8" x 40"
Ignition Transformer 230V/14.5 KV
Nozze 7.5 GPH, 45 Deg PLP
Oil Seal (HCA-7)
Oil Seal (HTN-5)
Photocel 8205-01 No
Pressure Switch RT-112 SB (LP)
Pressure Switch RT-5 SB (HP)
Pressure Switch PVF-16
Electronic Timer Make-Selec/ Dial/ Nutronic
Pressure Switch PM01
Safety Valve 1"
Thermocouple 0 - 120 Deg,Cent. 63mm Dial
Oil Filter
Valve Non Return 25mm
Valve Seat Assly (HTB-3 To HTB-6)
V-Belt Any size
Sight Glass Dia 50mm
Pressure Gauge 0-25 kg/cm2, D-63mm Con.-1/2"
Pressure Gauge 0-40 ,Dial 4" Bottom Connection 1/2
AQUASOL AE-201 TH
HOSE METALLIC 1" x 1.5MTR LONG (RI09R01011)
Multiport Valve
Hour Meter
Globe Valve Size-25NB, Screwed for Steam
Globe Valve Size-15NB, Screwed for Steam
Max clean for descaling to Coil type Boiler-50 Kg
PH Booster MAXTREAT- 50 Ltrs
Supply ,fix ,installation and testing in replacement of following accessories/control valves & equipment of steam pipeline system/network of Steam Boiler. Specials required will be measured and paid separately under relevant items : Note: The work has to be executed by OEM of Boiler THERMAX limited/Delta Therm or approved firm in Boiler repair/manufactures
Supply & fixing in replacement of SS Inner casing for steam Coil of steam Boiler 600 Kg/Hr complete all as specified and directed.
Supply & fixing in replacement of Temperature Controller 0-400 Deg C complete all as specified and directed.
Supply & fixing in replacement of RTD Assembly PT-100/ 5 Mtr complete all as specified and directed.
Supply & fixing in replacement of Sequence Controller MA810 complete all as specified and directed.
Supply & fixing in replacement of Photoresistor 8205 complete all as specified and directed.
Supply & fixing in replacement of Fuel pump AJ6AE
Supply & fixing in replacement of Water pump-Triplex with motor & base frame and pulley set complete all as specified and directed.
Taking out insulation of glass wool and aluminium sheet and rusted & leakage steam pipe line of MS of 50 mm dia B class including flanges and replacement of MS pipe line of 50 mm dia B class with flanges including refixing of insulation of glass wool and aluminium sheet as directed by Eng-in-Charge.
All as above item No 14.13 here in before but for 40 mm dia
All as above item No 14.13 here in before but for 25 mm dia
All as above item No 14.13 here in before but for 20 mm dia
Supply ,fix ,installation and testing in replacement of following accessories/control valves & equipment of steam pipeline system/network of Steam Boiler.
Pipe line MS (C-class) 80mm
Pipe line MS (C-class) 50mm
Pipe line MS (C-class) 40mm
Pipe line MS (C-class) 25mm
Pipe line MS (C-class) 15mm
Flange 15/20/25mmhole 100mm dia
Flange 40/50/80mm hole 150mm dia
Dead flanch 100/150mm dia
Bend MS 80mm
Bend MS 50mm
Bend MS 40mm
Bend MS 25mm
Bend MS 20mm
Bend MS 15mm
Nipple MS 80mm and long 150mm
Nipple MS 50mm and long 150mm
Nipple MS 40mm and long 150mm
Nipple MS 25mm and long 150mm
Nipple MS 20mm and long 150mm
Nipple MS 15mm and long 150mm
Socket MS 80mm
Socket MS 50mm
Socket MS 40mm
Socket MS 25mm
Socket MS 20mm
Socket MS 15mm
Elbow 80mm
Elbow 50mm
Elbow 25mm
Elbow 20mm
Elbow 15mm
Ball Valve 50 mm Brass
Tee 20mm
Tee 15mm
Hexa Nipple pressure 25mm
Hexa Nipple pressure 15mm
Safety valve with handle 25mm
NRV 40mm Brass
Header 4'x8"
Y Stainer 50mm
Y Stainer 20mm
Y Stainer 15mm
T.D Trap 25mm
T.D Trap 15mm
Botal Trap 20mm
Globe valve 80mm
Globe valve 50mm
Socket for saifan
Gasket 4mm
Nuts Bolts
Insulation for pipe line with glass wool and wrapping with aluminum sheet complete
Resin T-40 Na packing in plasting sealed drum
Crystal salt as per sample for water softner plant in solid form and packed in plastic bag
Maxclean for descaling to Coil type Boilers of Cap. 600Kg/hr in liquied form packed in plastic sealed drum
PH Booster for the water softner plant in liquied form packed in plastic sealed drum. Note:- (a) The time limit for attending the job/complaints with in 48 hours. (b) In case the contracts fails to attend/rectify the defects within the above time limit, penalty will the imposed as under:- (a) Rs. 1000/- per day for 1st two days and after that Rs. 2000/- per day. (c) In case of non-functioning of Laundry machines,Boilers a penalty shall be imposed against the contractor and a penal recovery of Rs 500/- per day for minor repair and Rs 1000/- for major repairs shall be recovered from the contractor's dues.
THUKRAL TRADERS
Electromech Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .