| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | ₹4.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.4 LRejected-AOC | ₹4.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A M YOOSAF L2 | FAHAD A Y L1 |
|---|---|---|---|---|---|
| 1.00Cutting trees & removing earth from UT | |||||
| 1.00 | OD16176/2024-2025:Labour engaged for removing earth from UT | 50 | Day | 1,200 ₹60,000 | 1,082.18 ₹54,109 |
| 1.00 | OD23656/2025-2026:Hire charges for front end loader 1 cum bucket capacity | 45 | hour | 1,500 ₹67,500 | 1,342.23 ₹60,400.35 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 7 | each | 1,000 ₹7,000 | 919.09 ₹6,433.63 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 3 | each | 11,500 ₹34,500 | 11,391.49 ₹34,174.47 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 21.26 | cum | 8,500 ₹1.8 L | 8,343.49 ₹1.8 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 8.28 | sqm | 390 ₹3,229.20 | 386.16 ₹3,197.40 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 227.02 | kilogram | 115 ₹26,107.42 | 112.43 ₹25,523.97 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.36 | cum | 9,600 ₹22,656 | 9,235.97 ₹21,796.89 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.77 | cum | 10,500 ₹29,074.50 | 10,488.77 ₹29,043.40 |
Tender Value
₹4.2 L
EMD Value
₹10,580
Closing Date
12 Mar 2026, 5:00 pmClosed
Roshni S S
CIP Subdivision, Cheerakuzhy
GENERAL-Flood damages 2024-Cutting the trees on dangerous situation, removing breached earth from canal, UT and other necessary works from ch 0/000km to 22/950km of LBMC-General Civil Work
2026_Irrig_841813_2
IRR/IA/TR/5817/2024_5_5_4/1
Open Tender
Civil Works - Canal
270 days
Cheerakuzhy
Please refer tender documents
8 documents required · 8 mandatory
₹935
Yes
₹10,580
Yes
16 May 2026
9 Mar 2026
13 Mar 2026
9 Mar 2026
12 Mar 2026
9 Mar 2026
9 Mar 2026 - 12 Mar 2026
Cutting trees & removing earth from UT
OD16176/2024-2025:Labour engaged for removing earth from UT
OD23656/2025-2026:Hire charges for front end loader 1 cum bucket capacity
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1428335.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
fot.pdf
Tender Documents • 0.25 MB
preliminaryagreement.pdf
Tender Documents • 0.19 MB
epay.pdf
Tender Documents • 0.23 MB
ipact.pdf
Tender Documents • 0.23 MB
affid.pdf
Tender Documents • 0.24 MB
sbd.pdf
Tender Documents • 1.97 MB
nit.pdf
Tender Documents • 0.04 MB
BOQ_1428335.xls
BOQ • 0.30 MB