Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹3.0 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.8 Cr+₹86 L (28.8%)Rejected-Finance VPO MAJARI TEHSIL SHRI NAINA DEVI DISTT BILASPUR HP | ₹3.8 Cr+₹86 L (28.8%) | L2 | Rejected-Finance being L2 |
| 3 | L3₹4.0 Cr+₹99.0 L (33.1%)Rejected-Finance VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹4.0 Cr+₹99.0 L (33.1%) | L3 | Rejected-Finance being L3 |
| 4 | Not Admitted-Fee/PreQual/Technical 171 GLOBEL SPACE HUDA GLOBEL SPACE COLONY 125055 | SIRSA | HARYANA | 125055 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Mohit Kaushal L1 | MS Kamal Dev Sharma L2 | Sushant Puri L3 |
|---|---|---|---|---|---|---|
| 1.00Operation & maintenance of Water Supply Scheme as whole including Pumping Machinery (working and Stand bye Pumping machinery), Rising Mains and Gravity mains in a length of 138.650 K.M including existing Pipe Network, 1 Nos WTPs, 1 Nos Pump house & 34 Nos Over Head Storage Reservoir/Underground Reservior, Water Treatment Lab ,including Yard light, at various sites complete in all respect in proper working condition for a period of 5 years. O&M includes the regular i.e. daily supplying of designed/required quantity of potable water having water quality as per CPHEEO manual of water supply to the beneficiaries of the scheme upto main storage /delivery tank from above mentioned sources main & sector over Head Storage tanks upto consumer and at different locations as per plan and repair & maintenance of Main lines, Gravity lines and entire distribution system along with maintenance of Intake Struture. O&M of the WTP laboratory and office building with in the plant complex,inculding reqular water quality testing of raw water ,intermediate stages and the treated water shall be carried out strictly as per the guideline and norms laid down in the CPHEEO Manual and as per the direction of the Engineer-in-charge .Regular maintenance of all the facilities including cleaning / washing,white washing/ painting after one years, oil and greasing repairs, replacement of worn out/damaged parts of pumping machinery, pipe line, valves and electrical, Mechanical equipments, regular cleaning of all structure like Storage tanks,collection/distribution chambers, pump house etc and disposal of same as per the direction of Engineer-in-charge, fixing/repairing leakage in civil structures, channels, pipe lines, pumping machinery etc. proper disinfection of treated water and regular testing of water samples at required stages of treatment and lift, keeping regular and proper record of water quantity and quality, time and hour of run of pumping machinery, repair and maintenance of all works,removal of all kind of slips, slush, up rooting of unwanted grass, shrubs, weeds etc. growing near the structures and keeping the area neat and clean to the entire satisfaction of Engineer-in-Charge, planting and maintaining plants/flowers/trees around the pump house , Over Head storage tanks/ Tube well etc. as per the entire satisfaction of Engineer-in-Charge including the cost of procurement of adequate and proper tools and plants, skilled and unskilled manpower, spare parts, oil/grease/lubricants, chemicals (Inculding bleaching powder) instruments, equipments, stationery and any other material etc. required for O&M excluding the cost of energy charges.The All the operation shall be carried out as per the CPHEEO manual on water supply and treatment (latest addition) HP PWD/IPH specification, HP & IPH departmental norms, directions issued by Engineer-in-Charge from time to time and sound Engineering practice. The operation and miaintenance of whole scheme shall be for 5 years. (Data sheet No. 1 to 9 are attached) | ||||||
| 2.00Pump Operators = 3 Nos,Fitter =4 Nos, Mali = 1 Nos, Beldar/ Helper = 11 tNos, Chowkidar = 2 Nos,Chemist =1 No,Work Inspector1 No ,1No Electrician/Pump Mechanic=0.25No.(Total 23.25 Nos) | ||||||
| 3.00 | 1st Year of O & M | 1 | Job | 53,69,999 ₹53,69,999 Lowest | 71,95,999 ₹71,95,999 | 70,00,000 ₹70,00,000 |
| 4.00 | 2nd Year of O & M | 1 | Job | 57,80,000 ₹57,80,000 Lowest | 74,00,000 ₹74,00,000 | 75,00,000 ₹75,00,000 |
| 5.00 | 3rd Year of O & M | 1 | Job | 60,00,000 ₹60,00,000 Lowest | 77,21,000 ₹77,21,000 | 80,00,000 ₹80,00,000 |
| 6.00 | 4th Year of O & M | 1 | Job | 62,50,000 ₹62,50,000 Lowest | 79,60,000 ₹79,60,000 | 83,00,000 ₹83,00,000 |
| 7.00 | 5th Year of O & M | 1 | Job | 65,00,000 ₹65,00,000 Lowest | 82,23,000 ₹82,23,000 | 90,00,000 ₹90,00,000 |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
5 Mar 2026, 11:00 amClosed
EE JSV Division Jhandutta
EE JSV Division Jhandutta
AR and MO Source Level Augmentation Of Water Supply Scheme under Section Gehrwin From Kaherwin nallah (Satluj River) In Tehsil Jhandutta Distt Bilaspur HP SH Operation and Maintenance of scheme for Five years
2026_HPIPH_129494_1
IPH-JSDJ-NIT dt. 24.2.2026
Open Tender
Repair and Maintenance Works
Item Rate
1826 days
Jhandutta
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹4.7 L
18 May 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
24 Feb 2026 - 5 Mar 2026
Operation & maintenance of Water Supply Scheme as whole including Pumping Machinery (working and Stand bye Pumping machinery), Rising Mains and Gravity mains in a length of 138.650 K.M including existing Pipe Network, 1 Nos WTPs, 1 Nos Pump house & 34 Nos Over Head Storage Reservoir/Underground Reservior, Water Treatment Lab ,including Yard light, at various sites complete in all respect in proper working condition for a period of 5 years. O&M includes the regular i.e. daily supplying of designed/required quantity of potable water having water quality as per CPHEEO manual of water supply to the beneficiaries of the scheme upto main storage /delivery tank from above mentioned sources main & sector over Head Storage tanks upto consumer and at different locations as per plan and repair & maintenance of Main lines, Gravity lines and entire distribution system along with maintenance of Intake Struture. O&M of the WTP laboratory and office building with in the plant complex,inculding reqular water quality testing of raw water ,intermediate stages and the treated water shall be carried out strictly as per the guideline and norms laid down in the CPHEEO Manual and as per the direction of the Engineer-in-charge .Regular maintenance of all the facilities including cleaning / washing,white washing/ painting after one years, oil and greasing repairs, replacement of worn out/damaged parts of pumping machinery, pipe line, valves and electrical, Mechanical equipments, regular cleaning of all structure like Storage tanks,collection/distribution chambers, pump house etc and disposal of same as per the direction of Engineer-in-charge, fixing/repairing leakage in civil structures, channels, pipe lines, pumping machinery etc. proper disinfection of treated water and regular testing of water samples at required stages of treatment and lift, keeping regular and proper record of water quantity and quality, time and hour of run of pumping machinery, repair and maintenance of all works,removal of all kind of slips, slush, up rooting of unwanted grass, shrubs, weeds etc. growing near the structures and keeping the area neat and clean to the entire satisfaction of Engineer-in-Charge, planting and maintaining plants/flowers/trees around the pump house , Over Head storage tanks/ Tube well etc. as per the entire satisfaction of Engineer-in-Charge including the cost of procurement of adequate and proper tools and plants, skilled and unskilled manpower, spare parts, oil/grease/lubricants, chemicals (Inculding bleaching powder) instruments, equipments, stationery and any other material etc. required for O&M excluding the cost of energy charges.The All the operation shall be carried out as per the CPHEEO manual on water supply and treatment (latest addition) HP PWD/IPH specification, HP & IPH departmental norms, directions issued by Engineer-in-Charge from time to time and sound Engineering practice. The operation and miaintenance of whole scheme shall be for 5 years. (Data sheet No. 1 to 9 are attached)
Pump Operators = 3 Nos,Fitter =4 Nos, Mali = 1 Nos, Beldar/ Helper = 11 tNos, Chowkidar = 2 Nos,Chemist =1 No,Work Inspector1 No ,1No Electrician/Pump Mechanic=0.25No.(Total 23.25 Nos)
1st Year of O & M
2nd Year of O & M
3rd Year of O & M
4th Year of O & M
5th Year of O & M
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
form6.pdf
Tender Documents • 0.56 MB
form8.pdf
Tender Documents • 1.20 MB
333.pdf
Tender Documents • 0.64 MB
Datasheet.pdf
Tender Documents • 0.69 MB
BOQ_191475.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .