Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC STOOD L1 |
| 2 | L2₹13.5 L+₹2.5 L (22.5%)Rejected-Finance WARD NO 36 SOUTH JOYNAGAR A D NAGAR AMC AGARTALA TRIPURA PIN 799003 | AGARTALA | WEST TRIPURA | TRIPURA | 799003 | ₹13.5 L+₹2.5 L (22.5%) | L2 | Rejected-Finance HIGHER THAN L1 |
| 3 | L3₹14.0 L+₹2.9 L (26.7%)Rejected-Finance | ₹14.0 L+₹2.9 L (26.7%) | L3 | Rejected-Finance HIGHER THAN L1 |
Tender Value
₹14.7 L
EMD Value
₹29,379
Closing Date
20 Aug 2026, 2:00 pmClosed
The Executive Engineer Agri West Agartala
The Executive Engineer West-I Department of Agriculture and F W Agartala Tripura
Reconstruction of RCC Gate at the Entrance of Krishi Bhawan Directorate of Agriculture and Farmers Welfare 2025 26.
2026_AGRI_75814_1
46/AGRI/EE(WEST-I)/2026-27
Open Tender
Civil Works
Percentage
60 days
KRISHI BHAVAN AGARTALA
AS PER DNIT
6 documents required · 6 mandatory
₹1,000
₹29,379
17 Sept 2026
13 Aug 2026
20 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift
upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 46.5 | Cum | 231.6 | ₹10,769.4 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1.58 | Cum | 1,177.3 | ₹1,860.13 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 1.58 | Cum | 8,980 | ₹14,188.4 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 12.5 | Cum | 12,073.8 | ₹1,50,922.5 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 32.04 | Cum | 13,305.8 | ₹4,26,317.83 |
| 6 | Centering shuttering including struttings, propping etc.and removal of form work for:shuttering ply a) Foundations, footings, bases for columns. | - | Sqm | 333.9 | - |
| 7 | Roof beam , Stair beam, Top Bend and Lintel with Shuttering ply. | 7.6 | Sqm | 499.4 | ₹3,795.44 |
| 8 | Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars. | 4,250.92 | kg | 103.9 | ₹4,41,670.59 |
| 9 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 52 | Sqm | 1,533.5 | ₹79,742 |
| 10 | First class brick work in foundation and plinth including cost of all materials as required complete:In cement mortar 1:4( 1 cement : 4 fine sand ). | 0.6 | Cum | 9,515.2 | ₹5,709.12 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_77178.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
DNIT46.pdf
Tender Documents • 4.20 MB
BOQ_77178.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .