Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-Finance | ₹2.8 L | 1 | Accepted-Finance First Lowest |
| 2 | 2₹2.9 LAccepted-Finance | ₹2.9 L | 2 | Accepted-Finance Second Lowest |
Updated dates
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
24 Mar 2026, 12:00 pmClosed
Assistant Executive Engineer
Office of the AEE, MI Subdivision, Shoranur
GENERAL-AM-2025-26-GENERAL - Annual maintanance 2025-2026 works to LIS Pattithara in Pattithara Panchayath-General Civil Work.- General Civil Work
2026_Irrig_847400_1
IRR/IA/TR/4438/2025_5_2_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
270 days
Pattithara-
Please refer tender documents.
7 documents required · 7 mandatory
₹565
₹6,355
16 Jun 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
Appendix A -Canal work
OD41089/2025-2026:Engaging Hydraulic excavator for the purpose of removing bund in bharathapuzha at pattithara LIS area which made obstruction to the flow of water into suction pipe by mechanical means, and dumping the same into appropriated places and as the direction of departmental officers at site
OD42570/2025-2026:Engaging labour for clearing jungle,cleaning and desiltation of canal, cleaning of pump house and its surroundings,and all other necessary labour arrangements for smooth running of pump house (civil,electrical and mechanical) including all charges and direction of departmental officers at site
OD54673/2025-2026:Engaging labour for repairing electrical repair such as replace pump bush after cutting and welding shaft and changing of bearing including all charges and supervision of departmental officers at site
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1432171.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1432171.xls
BOQ • 0.31 MB
affidavitformandepayment.pdf
Other Document • 0.08 MB
formoftender.pdf
Other Document • 0.18 MB
integritypact.pdf
Other Document • 0.05 MB
Download all tender documents and submit your bid