Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-Finance SHRI CHANDRAPAL SINGH VILLAGE BADRADURPUR POST KHEDA BUJURG DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.2 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.3 CrRejected-Finance TATARPUR LALU A 2 ADESH NAGAR NAJIBABAD BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹1.3 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.3 CrRejected-Finance MOHALLA LUHARI SARAI NAGINA DISTRICT BIJNOR UTTAR PRADESH | NAGINA | BIJNOR | UTTAR PRADESH | ₹1.3 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | CHANDRA PAL SINGH L2 | BHAMAR SINGH L3 | LAIQUE AHMAD L5 | S F INFRA PROJECTS L6 | M/S RIDAM ASSOCIATES L1 | ATUL KUMAR GUPTA L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||||
| 1.01 | Supplying of E.C. Bags and Nylon rope Crates size (0.90x0.90x0.90 M) & Filling of E.C. Bags With local earth i/c sewing and, Carriage upto 1 Km. by power transport including laying, packing and tying in nylone crate with placing in position i/c all cost of material, labour, carriage, T&P etc. Complete excluding GST. | 593 | Nos | 137.08 ₹81,288.44 | 500 ₹3.0 L | 534 ₹3.2 L | 400 ₹2.4 L | 289 ₹1.7 L | 450 ₹2.7 L |
| 1.02 | Collection of silt/sand from River bed at river bank by Mud Pump including stacking, T&P etc.for proper completion of work excluding GST. | 405.38 | Cum | 22 ₹8,918.36 | 100 ₹40,538 | 85 ₹34,457.30 | 70 ₹28,376.60 | 50 ₹20,269 | 80 ₹32,430.40 |
| 1.03 | Supplying, laying & packing of Boulders (20 to 40 Kg. wt.) and tying in G.I. Wire crate (1.50x1.50x0.45 M)Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. | 2,762 | Nos | 3,229.5 ₹89.2 L | 3,500 ₹96.7 L | 3,359 ₹92.8 L | 3,400 ₹93.9 L | 3,050 ₹84.2 L | 3,330 ₹92.0 L |
| 1.04 | Supplying, laying & packing of Boulders (20 to 40 Kg. wt.) and tying in hexagonal. Wire crate (3.00x1.50x1.00 M)Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. | 148 | Nos | 12,507.28 ₹18.5 L | 4,200 ₹6.2 L | 12,349 ₹18.3 L | 12,500 ₹18.5 L | 11,550 ₹17.1 L | 13,000 ₹19.2 L |
| 1.05 | Suplying and laying of Geo textile sheet made of 250gsm woven multifilament polypropylene yarn / Non woven geo Sheet with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST. | 603.9 | M2 | 71.4 ₹43,118.46 | 80 ₹48,312 | 65 ₹39,253.50 | 60 ₹36,234 | 70 ₹42,273 | 40 ₹24,156 |
| 1.06 | Suplying and laying of Boulder Pitching with Boulders (20 to 40 Kg. wt.)in spur/Stud by head load with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST. | 271.76 | M3 | 2,082.6 ₹5.7 L | 3,000 ₹8.2 L | 2,082 ₹5.7 L | 2,500 ₹6.8 L | 1,800 ₹4.9 L | 2,200 ₹6.0 L |
| 1.07 | Dismantling of old boulder including cleaning and staking of material within 60.m. i/c cost labour T&P etc. complete. But excluding G.S.T. | 91.65 | M3 | 84.6 ₹7,753.59 | 300 ₹27,495 | 73 ₹6,690.45 | 100 ₹9,165 | 50 ₹4,582.50 | 30 ₹2,749.50 |
| 1.08 | Laying & packing of old boulder in (20 to 40 kg .wt.) and tying G.I Wire crate (1.50x1.50x0.45 M) size by head load with placing in position i/all cost of material, labour carrige, | 91 | Nos | 1,659.6 ₹1.5 L | 2,200 ₹2.0 L | 1,438 ₹1.3 L | 1,500 ₹1.4 L | 1,300 ₹1.2 L | 1,500 ₹1.4 L |
| 1.09 | Supplying and laying brick on edge kharanja on top of bund | 1,098 | M2 | 365.5 ₹4.0 L | 500 ₹5.5 L | 336 ₹3.7 L | 450 ₹4.9 L | 260 ₹2.9 L | 375 ₹4.1 L |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Irrigation Work Circle Tubewell colony Moradabad
LOT 11 Janpad Amroha mein Ganga nadi ke bayen kinare par sthit Hasanpur tatbandh pratham charan ke km 2.700 evam km 2.900 par poorv mein nirmit kshatigrast spuron ki punarsthapna ka karya.
2026_UPIDC_1122949_11
04/SEIWC/2025-26
Open Tender
Civil Works
90 days
AMROHA
AS PER NIT
2 documents required · 2 mandatory
₹2,354
₹3.3 L
10 Apr 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
Laying and Jointing PVC Pipe. Heading
Supplying of E.C. Bags and Nylon rope Crates size (0.90x0.90x0.90 M) & Filling of E.C. Bags With local earth i/c sewing and, Carriage upto 1 Km. by power transport including laying, packing and tying in nylone crate with placing in position i/c all cost of material, labour, carriage, T&P etc. Complete excluding GST.
Collection of silt/sand from River bed at river bank by Mud Pump including stacking, T&P etc.for proper completion of work excluding GST.
Supplying, laying & packing of Boulders (20 to 40 Kg. wt.) and tying in G.I. Wire crate (1.50x1.50x0.45 M)Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST.
Supplying, laying & packing of Boulders (20 to 40 Kg. wt.) and tying in hexagonal. Wire crate (3.00x1.50x1.00 M)Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST.
Suplying and laying of Geo textile sheet made of 250gsm woven multifilament polypropylene yarn / Non woven geo Sheet with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST.
Suplying and laying of Boulder Pitching with Boulders (20 to 40 Kg. wt.)in spur/Stud by head load with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST.
Dismantling of old boulder including cleaning and staking of material within 60.m. i/c cost labour T&P etc. complete. But excluding G.S.T.
Laying & packing of old boulder in (20 to 40 kg .wt.) and tying G.I Wire crate (1.50x1.50x0.45 M) size by head load with placing in position i/all cost of material, labour carrige,
Supplying and laying brick on edge kharanja on top of bund
Earth work in filling of bund includig carriage of earth up 1.00 km & lift 1.5 m with proper lavelling dressing manual coumpaction , cost of earth, labour, T&P etc complete. But excluding G.S.T.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2091857.pdf
BOQ Comparative Chart
xlsx
finsummary_2091857.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2091857.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid