| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹4.3 L+₹35,596.99 (9.88%)Accepted-AOC | ₹4.3 L+₹35,596.99 (9.88%) Quoted ₹4.0 L | L2 | Accepted-AOC Selected in lottery |
| 2 | L1₹3.6 LRejected-AOC AT PANCHUPALI P O PANCHUPALI DIST KEONJHAR PIN 758020 | KEONJHAR | KEONJHAR | ODISHA | 758020 | ₹3.6 L | L1 | Rejected-AOC Not selected in lottery |
| 3 | L3₹4.0 L+₹42,377.37 (11.8%)Rejected-AOC | ₹4.0 L+₹42,377.37 (11.8%) | L3 | Rejected-AOC L3 |
Tender Value
₹4.2 L
EMD Value
₹4,237
Closing Date
24 Dec 2025, 5:00 pmClosed
EXECUTIVE OFFICER JODA MUNICIPALITY
JODA MUNICIPALITY OFFICE AT PO BANEIKALA JODA DIST KEONJHAR ODISHA 758038
WORKS
2025_ORULB_122956_18
JM-02/2025-26
Open Tender
Civil Works - Others
Percentage
60 days
JODA MUNICIPALITY AT PO BANEIKALA JODA KEONJHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹4,237
Yes
8 Aug 2026
11 Dec 2025
26 Dec 2025
11 Dec 2025
24 Dec 2025
11 Dec 2025
Earth work in excavation of foundation in hard soil or Gravery Soil within 50m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within 5.00 Km lead by engaging any mechanical means as per direction of Er. In-charge over initial lead of 50m clear from work site with loading inloading & laying in layer of 0.30m in depth , breaking the clod to maximum 5 to 7 cm in size & including cost of all labour cess etc. all complete.
Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty ,cess, etc all taxes of all materials but including & cost of all labour complete.
C.C. ( 1 : 3 : 6 ) using 40 mm size HBHG metal free from weathered skin & all foreign materials including cost , conveyance to site ,watering and curing , royalty cess DMF & EMF and additional royalty etc all taxes of all materials & cost of all labour complete.
PCC work in M-20 Grade of concrete with 20mm & down graded size CBHG chips & compacting with suitable vibrator for construction of pavement including Lowering, laying the concrete, watering and curing etc. complete to required levels lid in layer including cost, conveyance to site, royalty, cess etc. all taxes of all materials & cost of all labour etc. including cost of centering & shuttering all complete.
Rigid & smooth centering & shuttering for RCC works including False work and dismentalling them after casting including cost & Charges of all materials & cost of all labour complete ( RCC Foundation)
6 mm thick cement plaster in CM ( 1:4) to drain CC surface finsihed with neat cement punning including closed deep chipping and slurry treatement cost , conveyance to site, royalty, Cess DMF & EMF and additional Royalty etc. all taxes of all materials & cost of all labour complete.
Providing & Laying 80mm thick factory made cement concrete interlocking paver block of M - 40 grade made by block making machine with strong vibrator compaction of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, fitting the joints with fine sand & including cost of paver block, conveyance to site , cess etc. & cost of all labour complete.
Supplying all labour , T & P , etc for preparation of Display Board including painting, writing & fixed in position at proper place & provision of 10 nos Photographs at different stage of execution of the work including cost of all materials & cost of all labour complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_571092.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_571092.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .