| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.6 Cr+₹3.5 L (2.22%)Rejected-Finance | ₹1.6 Cr+₹3.5 L (2.22%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.6 Cr+₹7.4 L (4.73%)Rejected-Finance | ₹1.6 Cr+₹7.4 L (4.73%) | L-3 | Rejected-Finance L-3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.6 Cr
EMD Value
₹3.9 L
Closing Date
25 May 2026, 5:00 pmClosed
GM-CIVIL
Main Administrative Building Sector-6 Noida
M/o Road (C/o R.C.C. Footpath, P/L C.C. Pavement Secvice Road and Raising of Drain from Helipad and Shilp Haat to Shivdayal School in Sector- 33A) Noida
2026_NOIDA_1147384_1
45/GM/SM(WC-05)/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.9 L
9 Jul 2026
11 May 2026
26 May 2026
11 May 2026
25 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Kerb Stone ( Dismantling Kerb Stoneby manual meansand disposal of dismentling material with all hits and up to a lead of 1000metre) as per direction of Engineer-in-Charge. | 858 | metre | 10 | ₹8,580 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and amming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 192 | cum | 144.95 | ₹27,830.4 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5mt., direction by engineer-in-charge. The contrector has to detect different utilites like sewer line water supply line elecctric cable telephone cable gas pipe line etc. using utility detecting machine before start of excavetion and shall start of excavetion and shall start excavation only after getting permission of Engineer -in Charge . | 351 | cum | 136 | ₹47,736 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :- 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 268 | cum | 5,746.88 | ₹15,40,163.84 |
| 5 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concreteNominal concrete 1:3:6 or richer mix (i/c equivalent design mix) . (i/c equivalent design mix) . | 608 | cum | 923.42 | ₹5,61,439.36 |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 286 | sqm | 181.64 | ₹51,949.04 |
| 7 | Centring and shuttering including strutting, Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.propping etc. and removal of form for : | 864 | sqm | 335.55 | ₹2,89,915.2 |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced concrete work , using cement content as per approved design mix , manufactured in fully automatic batching plant and transported to site of work in transit mixer for a leads having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately ),All works upto plinth level. | 135 | cum | 7,912.3 | ₹10,68,160.5 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 10,598 | kg | 82.81 | ₹8,77,620.38 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.50 mt. | 96 | cum | 93 | ₹8,928 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
TD.pdf
Tender Documents • 12.95 MB
Capability.xls
Additional Documents • 0.04 MB
BOQ_2146494.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .