Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹1.1 Cr (35.4%)Admitted-Finance | ₹4.3 Cr+₹1.1 Cr (35.4%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | Shivam Borewal L2 | M/S gulab chand kumawat L1 |
|---|---|---|---|---|---|
| 1.01 | Operation and Maintenance of all units of UIT developed Water Supply scheme, (Including Transmission & Distribution system), for 3 years including round the clock O&M from CPH to ESRs to tail ends i.e. consumers end including all related electrical, mechanical, instrumentation, civil structures etc including administrative management, comprehensive operation, repairs, cost of lubricants, consumables, spare parts etc. as per scope of work & specifications. (Excluding cost of power charges). The bidder shall quote only lump sump price for O & M for entire period of 3 years including cost of chemicals and cost of providing vehicle etc as per special condition of contract. The approved total cost for 3 year O&M shall be paid to the contractor in increasing trend in subsequent years, keeping yearly rate of increasing as 5%. | 3 | Year | 1,42,30,071 ₹4,26,90,213 | 1,05,10,500 ₹3,15,31,500 Lowest |
Tender Value
₹5.9 Cr
EMD Value
₹11.7 L
Closing Date
12 Jun 2023, 12:30 pmClosed
ACE,PHED, Region Kota
ACE,PHED, Region Kota
Operation and Maintenance of UIT developed water supply schemes with Repairing of Centrifugal pump set, unlowering of pumps, repairing of pumps with material repairing of 24 feeder main, Rising distribution pipe line etc. Kota for 3 year.
2023_PHCJA_337545_1
ACE NIT No. 13/2023-24
Open Tender
Civil Works - Water Works
Item Wise
1095 days
Kota
As per TD
2 documents required · 2 mandatory
₹10,000
EE,PHED,City I Kota
₹11.7 L
Yes
18 Jul 2023
22 May 2023
12 Jun 2023
22 May 2023
12 Jun 2023
22 May 2023
Amount
Operation and Maintenance of all units of UIT developed Water Supply scheme, (Including Transmission & Distribution system), for 3 years including round the clock O&M from CPH to ESRs to tail ends i.e. consumers end including all related electrical, mechanical, instrumentation, civil structures etc including administrative management, comprehensive operation, repairs, cost of lubricants, consumables, spare parts etc. as per scope of work & specifications. (Excluding cost of power charges). The bidder shall quote only lump sump price for O & M for entire period of 3 years including cost of chemicals and cost of providing vehicle etc as per special condition of contract. The approved total cost for 3 year O&M shall be paid to the contractor in increasing trend in subsequent years, keeping yearly rate of increasing as 5%.
Shivam Borewal
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_598898.xls
BOQ • 0.27 MB
TD13.pdf
Tender Documents • 4.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .