Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified. |
| 2 | Accepted-Technical LUCKNOW UTTAR PRADESH INDIRA NAGAR LUCKNOW UTTAR PRADESH 226016 | LUCKNOW | UTTAR PRADESH | 226016 | Accepted-Technical Technically Qualified. |
| 3 | Accepted-Technical | Accepted-Technical Technically Qualified. |
Tender Value
Refer Docs
Closing Date
25 Mar 2026, 11:00 amClosed
Managing Director
UPDESCO, 2nd FLOOR, UPTRON BUILDING, GOMTI NAGAR, LUCKNOW-226010
The Information Security (IS) Audit process for Sub AUA Aadhaar Authentication of the web portal sspydpo.upsdc.gov.in for the Financial Years 2024-25 and 2025-26 shall be conducted by a CERT-In empanelled auditor for Mahila Kalyan, Lucknow (U.P).
2026_UDSCL_1123435_1
UPDESCO/SW/2026/VKM346
Open Tender
Info. Tech. Services
Turn-key
60 days
UPDESCO, Uptron Building, Gomti Nagar
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,770
UPDESCO,2nd FLOOR,UPTRON BUILDING,GOMTI NAGAR
Exempted
17 Apr 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
Tender Reference No.- UPDESCO/SW/2026/VKM346
A. Charges for The Information Security (IS) Audit process for Sub AUA Aadhaar Authentication of web portal "sspydpo.upsdc.gov.in" for the Financial Years 2024–25 and 2025–26 shall be conducted by a CERT-In empanelled auditor for Mahila Kalyan, Lucknow (U.P):
Sl. No. Work Description Unit Per Unit Rate (Rs.) Amount (Rs.)
(Col-3 X Col-4)
A.1 Compliance Audit through cert-in Empanalled agency of Sub AUA / Sub KUA for the portal sspydpo.upsdc.gov.in, in accordance with the “Compliance Checklist for Certifying Compliance with Controls that the Sub AUA / Sub KUA is required to have in place – Version 2.0 (issued in May 2025)”, as prescribed by UIDAI, for the Financial Year 2024–25, in line with the approved Scope of Work 1
A.2 Compliance Audit through cert-in Empanalled agency of Sub AUA / Sub KUA for the portal sspydpo.upsdc.gov.in, in accordance with the “Compliance Checklist for Certifying Compliance with Controls that the Sub AUA / Sub KUA is required to have in place – Version 2.0 (issued in May 2025)”, as prescribed by UIDAI, for the Financial Year 2025–26, in line with the approved Scope of Work. 1
A.4 UPDESCO margin@10%
A.5 Total Cost including UPDESCO margin
A.6 GST@18%(mailto:GST@18%25塹ᴻ䡿ⲯ嶂藄挧ꮥ)
A.7 Overall cost including taxes
Note: 1. The selection of the bidder for the above project shall be based on the lowest quoted (L1) total amount of Table A . The Total Cost (Col-5) for this project shall be calculated by summation of "Total" Amount quoted for respective work items. If "Total" Amount of a work item is wrongly quoted then the correctly computed value shall be considered while calculating the Total of Amount (Col-5). 2. The rates for above work items shall be quoted by the bidders keeping all the requirements of the client in mind for successful execution of the said project.
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
PriceScheduleBOQVKM346.xls
Additional Documents • 0.03 MB
TechnofinancialbidVKM346.pdf
Tender Documents • 1.90 MB
Corr2ExtenVKM346.pdf
PDF • 0.58 MB
Corr1ExtenVKM346.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].