Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified. |
| 2 | Accepted-Technical LUCKNOW UTTAR PRADESH INDIRA NAGAR LUCKNOW UTTAR PRADESH 226016 | LUCKNOW | UTTAR PRADESH | 226016 | Accepted-Technical Technically Qualified. |
| 3 | Accepted-Technical | Accepted-Technical Technically Qualified. |
Updated dates
Tender Value
Refer Docs
Closing Date
25 Mar 2026, 11:00 amClosed
Managing Director
UPDESCO, 2nd FLOOR, UPTRON BUILDING, GOMTI NAGAR, LUCKNOW-226010
The Information Security (IS) Audit process for Sub AUA Aadhaar Authentication of the web portal sspydpo.upsdc.gov.in for the Financial Years 2024-25 and 2025-26 shall be conducted by a CERT-In empanelled auditor for Mahila Kalyan, Lucknow (U.P).
2026_UDSCL_1123435_1
UPDESCO/SW/2026/VKM346
Open Tender
Info. Tech. Services
60 days
UPDESCO, Uptron Building, Gomti Nagar
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,770
UPDESCO,2nd FLOOR,UPTRON BUILDING,GOMTI NAGAR
Exempted
17 Apr 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
Tender Reference No.- UPDESCO/SW/2026/VKM346
A. Charges for The Information Security (IS) Audit process for Sub AUA Aadhaar Authentication of web portal "sspydpo.upsdc.gov.in" for the Financial Years 2024–25 and 2025–26 shall be conducted by a CERT-In empanelled auditor for Mahila Kalyan, Lucknow (U.P):
Sl. No. Work Description Unit Per Unit Rate (Rs.) Amount (Rs.)
(Col-3 X Col-4)
A.1 Compliance Audit through cert-in Empanalled agency of Sub AUA / Sub KUA for the portal sspydpo.upsdc.gov.in, in accordance with the “Compliance Checklist for Certifying Compliance with Controls that the Sub AUA / Sub KUA is required to have in place – Version 2.0 (issued in May 2025)”, as prescribed by UIDAI, for the Financial Year 2024–25, in line with the approved Scope of Work 1
A.2 Compliance Audit through cert-in Empanalled agency of Sub AUA / Sub KUA for the portal sspydpo.upsdc.gov.in, in accordance with the “Compliance Checklist for Certifying Compliance with Controls that the Sub AUA / Sub KUA is required to have in place – Version 2.0 (issued in May 2025)”, as prescribed by UIDAI, for the Financial Year 2025–26, in line with the approved Scope of Work. 1
A.4 UPDESCO margin@10%
A.5 Total Cost including UPDESCO margin
A.6 GST@18%(mailto:GST@18%25塹ᴻ䡿ⲯ嶂藄挧ꮥ)
A.7 Overall cost including taxes
Note: 1. The selection of the bidder for the above project shall be based on the lowest quoted (L1) total amount of Table A . The Total Cost (Col-5) for this project shall be calculated by summation of "Total" Amount quoted for respective work items. If "Total" Amount of a work item is wrongly quoted then the correctly computed value shall be considered while calculating the Total of Amount (Col-5). 2. The rates for above work items shall be quoted by the bidders keeping all the requirements of the client in mind for successful execution of the said project.
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
PriceScheduleBOQVKM346.xls
Additional Documents • 0.03 MB
TechnofinancialbidVKM346.pdf
Tender Documents • 1.90 MB
Download all tender documents and submit your bid