Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹89.7 L
EMD Value
₹90,000
Closing Date
10 Aug 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Municipal Commissioner
Proposed Furniture Work of Suman School At Plot No. 1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In North Zone (Katargam), Surat.
325876
Deputy Municipal Commissioner/NZ/03/2026-27 Work No.07
Open
Furniture/ Fixture
Works
Surat
3 documents required · 3 mandatory
₹2,832
Commissioner, Surat Municipal Corporation
₹90,000
20 Jul 2026
20 Jul 2026
20 Jul 2026
10 Aug 2026
20 Jul 2026
120 days
Name of Work : Proposed Furniture Work of Suman School At Plot No. 1/A Paikee,
Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In North
Zone (Katargam), Surat.
E-TENDER NOTICE NO. : Deputy Municipal Commissioner/NZ/03/2026-27
VOLUME-I : TECHNICAL BID
Downloading of Tender Documents : From Dt. 20/07/2026 to 10/08/2026 upto
including Addenda Corrigendum in any 17.00 hrs.
Pre Bid Conferance Online : -
Submission of Technical Bid : EMD,Tender fee to be submitted online
https/smctender.nprocure.com By Scanning https/smctender.nprocure.com by Date
On line submission (Last Date) : Dt.10/08/2026 upto 18.00hrs.
Submission of Tender fee, EMD (Only : Up to 21/08/2026 upto 18.00 hrs. in sealed
Bander cheque/D.D.), in hard copy. envelop strictly by R.P.A.D./ Speed Post to
Chief Accountant, SMC, Muglisara, Surat.
395 003 Gujarat.
On line Submission of Price Bid : On or Before Upto Date: 10/08/2026 18.00hrs.
Opening of Online Technical Bid etc…. : On Dt. 11/08/2026, 11.00 hrs. on wards
Opening of Tender Fee ,EMD & Other Dt. 24/08/2026, (Probable)
Documents etc.. in Hard Copy.
Opening of Price Bid (Online) : Dt. 25/08/2026, (Probable)
Estimated Amount : Rs.89,74,390.30 + G.S.T.
Document Fees : Rs. 2,832.00 ( With GST )
Class : "D" Class & Above with Similar Work
TENDER TO BE SUBMITTED TO:
THE CHIEF ACCOUNTANT,
SURAT MUNICIPAL CORPORATION, MUGLISARA
SURAT MUNICIPAL CORPORATION
NAME OF WORK:- Proposed Furniture Work of Suman School At Plot No. 1/A
Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In North Zone
(Katargam), Surat.
01 NOTICE INVITING TENDER
02 INFORMATION TO TENDERER
04 GENERAL DETAILS OF WORK IN BRIEF
05 INSTRUCTIONS TO TENDERER
06 GENERAL CONDITION OF CONTRACT
07 SCHEDULE - A
09 IMPORTANT INSTRUCTION TO THE TENDERER
10 SPECIAL NOTE
11 SPECIAL CONDITIONS OF CONTRACT
12 SPECIFICATIONS OF MATERIALS
13 GENERAL TECHNICAL SPECIFICATION FOR BUILDING
14 ITEMWISE DETAILED TECHNICAL SPECIFICATIONS
15 DECLARATION FORM
16 FORMAT FOR BANK GAURANTEE
17 ADVANCE STAMP RECEIPT
20 ANNEXTURE-A- AFFIDAVIT
22 ANTI-BLACKLISTING CERTIFICATE
SURAT MUNICIPAL CORPORATION
1.0 NOTICE INVITING TENDER
(A) RECEIPT AND OPENING OF TENDER :
Online Tenders will be received from the established and reliable contractors on or before
17.00 hours on (Dt.20/07/2026 to 10/08/2026) on website smctender.nprocure.com. The
tender received after due time and date specified will not be accepted.
(B) NAME OF WORK:- Proposed Furniture Work of Suman School At Plot No.
1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In North
Zone (Katargam), Surat.
1) Estimated Cost : Rs.89,74,390.30 + G.S.T.
2) Earnest Money Deposit : Rs.
3) Time Limit : 10 (Ten) months
4) Document Fee : Rs. 2,832.00 ( With GST )
5) Registration required : "D" Class & Above with Similar Work
(1) " Following Documents shall be submitted in HARD COPY to Surat Municipal
. All necessary documents mentioned in Technical bid (If any).
. Earnest Money Deposit as mentioned in the Tender.
. Addenda Corrigendum(if any) duly signed by Contractor
Technical Bid and Price Bid are not to be submitted in Physical Form, Please note that
Non submission of Technical Bid as well as price bid does not absolve the bidders from
any liability created from the bid condition and bidding process. Technical-Bid & Price
Bid in Hard coopy shall be submitted by Successful Bidders upon intimation from SMC.".
(C) OPENING OF TENDERS :
The tenders will be opened online in presence of bidders and opening authority subject to
receipt of Tender Fees & EMD in hard copy in account department (Main Office) . But
tenderer has to upload relevant documents as required /mentioned in the technical
bid in Soft Copy (By Scanning). The tenders will be opened in two stages i.e Technical
Bid and Price Bid.
(D) PURCHASE OF TENDER DOCUMENTS :
Tender Documents can be downloaded from smctender.nprocure.com (Dt.20/07/2026 to
Tender documents fees of Rs. 2832.00 (With GST) per set which is required for
submission of tender towards the cost of tender documents in cash, pay order or by
demand draft of any nationalized bank, in favour of "The Commissioner, Surat Municipal
Corporation" payable at Surat and shall be submitted alongwith EMD and other
documents. The cost of the Tender Documents will not be refunded in any circumstances.
The Surat Municipal Corporation shall not be liable for any postal delay in any case.
Demand Draft for E.M.D. & Tender (Bid) fee shall be submitted in electronic format
through online mode (by scanning) while uploading the bid. This submission shall
mean that E.M.D. & tender fee are received for purpose of opening of the bid.
Accordingly offer of those shall be opened whose E.M.D. & tender (bid) fee is received
electronically. However, for the purpose of realization of D.D. bidder shall send the
D.D. in original through RPAD / Speed post as per Clasue-3.10 below so as to reach to
Chief Accountant, SMC within 7 days from the last date of online submission of the
bid as per tender notice.
Penaltative action will be taken for not submitting original Demand Draft in the
account department of Surat Municipal Corporation within 7 days from the last date
of online submission of the bid for the first time as mentioned below.
Sr. Tender Amount Penalty Amount in Rs.
1. Up to Rs. 1 Crore Rs. 10,000/-
2. More than Rs. 1 Crore and Upto Rs. 10 Crore Rs. 20,000/-
3. More than Rs. 10 Crore and Upto Rs. 50 Crore Rs. 30,000/-
4. More than Rs. 50 Crore and Upto Rs. 100 Crore Rs. 70,000/-
5. More than Rs. 100 Crore Rs. 1,00,000/-
If bidder will not submit the penalty amount within 10 days to Surat Municipal
Corporation and/or bidder will not submit the demand draft in original for the second
time and after, Penaltative action shall be taken for abeyance of registration and
cancellation of E-tendering code for 6 (six) months.
Any documents in supporting of bid shall be in electronic format only through online
(by scanning) & hard copy will not be accepted separately.
All documents must be coloured scanned to be seen as original. Scanning in black and
white or gray shall not be acceptable.
All documents must be notarized with clearly-displaying stamp, number and name of
(E) CONTRACT PERIOD :
The total contract period is hereby fixed as 10 (Ten) months from the 10th Day of
issuance of work order.
(F) Tenderer must comply with and agree to all instructions & requirements in the Notice and
in the Instructions to Tenderers, including requirements in the Contract Documents.
(a) All tenders must be submitted in the prescribed Tender form.
(b) Each Tender must be accompanied by the completion Schedule.
(c) Each tender must be accompanied by the Tender Security (Earnest Money
Deposit) Rs. 90,000.00 as specified in the IT-07.
(d) The successful tenderer shall execute the Contract Agreement within Ten days after the
date of Notice of award.
(e) The successful Tenderer will be required to furnish a performance bond (Security
Deposit) of and amount equal to (2%) Two percent of the tendered amount. As per
clause no. IT-27.
(f) The successful Tenderer shall furnish insurance in accordance with the contract
(g) The Surat Municipal Corporation may with hold issuance of the Notice of proceed for a
period not exceeding fifteen days after the date of execution of the contract
(h) The tender and tender guarantee bond (Earnest Money Deposit) shall be submitted by
the Agency in whose name tender has been issued. Transfer of tender documents to
any other party is prohibited.
(i) All intending tenderers will have to purchase digital signatures in order to participate in
the online bidding process.
(j) All the applicant contractors are required to have their own employers code
number under EPF Act, 1952 and are required to comply the applicable
provisions of said statute regularly and totally.
Further the contractors for services are required to produce the certified copies of
paid challans in respect of employees/workers employed by said contractor in
respect of work allotted by Surat Municipal Corporation, along with copies of
Pay Roll and Muster Roll. If the same are not produced, the bills will not be
(G) RECEIPT OF TENDER DOCUMENTS :
a. Document fees and EMD Details
b. Commercial Bid
c. Annexure I to II along with all necessary supporting documents
d. Bank solvency
f. GST Registration
g. CA Certified Lass Three Finaicial Year Avg. Turnover Certificate.
h. Power of attorney
i. Partnership deed in case of Partnership firm.
j. Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/-
k. Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
The following details shall be submitted in hard copy at prescribed address :
a. Tender fees in prescribed format
b. Earnest Money Deposit in prescribed format
c. Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/-
d Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
e. Other necessary documents mentioned in Technical Bid (if any)
Please note that commercial bid shall not be submitted in hard copy under any
circumstances. This will hold the tender liable for rejection.
(H) Tender Validity Period :
The validity period of the tender submitted for this work shall be of one hundred twenty
(120) calendar days from opening date of price bid of the work and the Tenderer shall not
be allowed to withdraw or modify the tender offer on his own during the validity period.
(I) Rights Reserved :
Without assigning any reason, The Surat Municipal Corporation reserves the right to reject
the lowest or any other or all tenders or part of its. To waive any informality or irregularity
in any tender, which in the opinion of the Surat Municipal Corporation does not appear to
be in its best interest and the tenderer shall have no cause of action or claim against the
Surat Municipal Corporation or its officers, employee, successors or assignees for rejection
The Surat Municipal Corporation further reserves the right to withhold issuance of the
notice to proceed, after execution of the contract agreement by the successful Tenderer.
The Surat Municipal Corporation is not obliged to give reasons for any such action.
During Tender validity period, if any Tenderer withdraws or makes any modifications or
additions in the terms and conditions on his own in this tender, then The Surat Municipal
Corporation shall without prejudice to any right or remedy be at liberty to reject the tender
and forfeit the Earnest Money Deposit in full. Such Tenderer may be disqualified from
tendering for further works under the jurisdiction of The Surat Municipal Corporation.
The Surat Municipal Corporation reserves the right to increase or decrease the scope of
work and split the tender in two or more parts without assigning any reason even after the
award of contract.
(J) Application Received from joint venture / consortium shall not be considered.
• attested copy of partnership deed, power of attoney etc.
• passport size photographs of partner / all partners on relevant page of technical bid.
• Tenderer shall submit only one tender for the work put to this tender.
EXECUTIVE ENGINEER
NORTH ZONE (KATARGAM)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
NAME AND ADDRESS :-
2.0 INFORMATION TO TENDERER :
1. Tender validity period 120 days (One hundred & Twenty days) from the
opening of the date of opening of price bid of tender
2. Earnest Money Deposit Rs.
3. Security Deposit Two Percent (2%) of tendered Amount.
4. Retention Money Two Percent (2%) of R.A.Bill
+ Additional 5% of R.A.Bill
5. Time of Completion For the complete contract 10 (Ten)
6. Period of liability for 12 (Twelve) Months after completion of
7. Penalty for delay Zero Point two percent (0.2%) of the
contract price per day maximum upto
ten percent of the contract price.
8. Last date of download of tender Date :- Dt.10/08/2026 upto 17.00 hrs
from smctender.nprocure.com
9. Last date of submission
of online Tender Date :- 10/08/2026 upto 18.00 hrs
10. Last date of submission of
Tender fees, EMD and other
Documents Up to Dt. 21/08/2026 upto 18:00 hrs
11. Pre-Bid : Bidders shall have to post their queries on e-mail
address [email protected]
EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
NAME AND ADDRESS :-
1. Tenderers to note last date and time of submission of Tender Fees, EMD and other
documents and that they are to be posted by Registered Post A. D. / Speed Post only.
2. Tender(Technical Bids and Documents) should be duly sealed and the covering envelope
is to be only superscribed as Proposed Furniture Work of Suman School At Plot
No. 1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In
North Zone (Katargam), Surat.
3. Tender Security Bond for Earnest Money Deposit should be submitted as per Articles IT-
07 (Earnest Money Deposit)
4. Conditional tender will be rejected outright by the Surat Municipal Corporation, without
giving any reason.
5. All information as demanded should be submitted.
6. Information regarding capability etc. as per clause No.IT-04 (General Performance Data)
should be submitted in hard copy along with tender fee and EMD.
7. Please verify before SEALING that Tender (Technical Bids and Documents) are signed,
wherever required in each and every respect.
EXECUTIVE ENGINEER,
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
NAME AND ADDRESS :-
4.0 GENERAL DETAILS OF WORK IN BRIEF :
1. NAME OF WORK :- Proposed Furniture Work of Suman School At Plot
No. 1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B)
In North Zone (Katargam), Surat.
2. Estimated cost of the work : Rs. 89,74,390.30 + G.S.T.
3. Amount of Earnest Money Deposit : Rs.
4. Tender cover to be superscribed as :
1. NAME OF WORK :- Proposed Furniture Work of Suman School At
Plot No. 1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura
(G.H.B) In North Zone (Katargam), Surat.
2. Tender Notice No. :- Deputy Municipal Commissioner/North Zone/03/
2026-2027, Work No.
3. Name Of Department :- Housing Department
4. Name and Address of Tenderer.
EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
NAME AND ADDRESS :-
INSTRUCTION TO TENDERERS
IT-01 GENERAL :
The Contract documents may be secured in accordance with the notice Inviting Tender for
the work called. The work shall include supply of materials necessary for construction of
IT-02 INVITATION TO TENDER:
The Surat Municipal Corporation hereinafter referred to as the Corporation will receive
tenders for the Proposed Furniture Work of Suman School At Plot No. 1/A
Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In North Zone
(Katargam), Surat. as per the specifications in the tender documents. The tenders shall
be opened in presence of opening authority Surat in the presence of tenderers or their
representatives who are present. The Corporation reserves the right to reject the lowest or
any other or all tenders or part of it which in the opinion of the Corporation does not
appear to be in its best interest, and the tenderer shall have no cause of action or claim
against the corporation or its officers, employees, successors or assignees for rejection of
IT-03 LANGUAGE OF TENDER :
Tenders shall be submitted in English, and all information in the tender shall also be in
English, Information in any other language shall be accompanies by its translation in
English. Failure to comply with this may make the tender liable to reject.
IT-04 QUALIFICATIONS OF TENDERERS :
Sr. No. Criteria Documents required for
complete submission
1.1 Average Annual financial turnover during last 3 Copy of certificate from
years, ending 31st March of previous financial year Chartered Accountant along
should be atleast 30% of the estimated cost with copy of Balance sheets.
1.2 Solvency Certificate from bankers of schedule bank
Fresh Solvency certificate from bankers of schedule / nationalized bank
bank / nationalized bank. Minimum value of solvency
shall be 20% of estimated cost of the Tender
2.0 Registration
2.1 Minimum “D" class Registration Class with any Registration Certificate
government, semi government organization
2.2 power of attorney, partnership deed or registration Attested copy should be
deed. submitted
3.0 Relevant Experience
3.1 Similar works during last 7 years. attested copies of
3.1.1 Three similar completed works, each costing not less certificates from head of the
than amount equal to 40% of the estimated cost put to office concerned for
the tender completion of the works.
3.1.2 Two similar completed works, each costing not less the Only Govt. or Semi Govt.
amount equal to 50% of the estimated cost put to the Works shall be considered
tender for Similsr Works.
3.1.3 One similar completed works, each costing not less the
amount equal to 80% of the estimated cost put to the
4.0 Other details
4.1 Black list.
The Bidders shall note that in case the Bidder is
blacklisted / stated as defaulter / barred participating in
tenders by any of government agencies / semi
government agencies or any other equivalent agencies
during last 5 years then in that case, the Bidders will be
disqualified and will not be allowed to participate in the
bidding process, though bidder satisfies all the
qualification conditions mentioned above. In this AFFIDAVIT
regard, the decision of the Surat Municipal Corporation
will be final and binding to Bidder.
4.2 Works on hand & Litigation
The Bidder including any Member shall provide details
of all their on-going projects along with stage of ANNEXURE-I & II
litigation, if so, against the Employer / Governments.
Similar work means Furniture / Carpentary / Alluminium Work Etc... work done for Govt.
or Semi Govt. only.
(a) Turnover during last 3 years, ending 31st March of previous financial year should be
atleast 30% of Estimated Cost. An attested copy of annual turnover (CA certified) for last
3 years should be enclosed.
(b) Solvency certificate from bankers of schedule bank/Nationalized bank for the 20% of
Estimated amount. Tenderer has to submit higher amount of bank solvency if so desired by
(c) An attested copy of registration with MES, Various department of State Govt., Surat
Municipal Corporation, CPWD etc.
(d) List of the works already complete last years in prescribed proforma as per
Annexure-I and attested copies of certificates from head of the office concerned for
completion of the works.
Following enhancement factors will be used for the cost of works executed an financial
figures to amount base for the value of the works completed in India.
Financial Year Multiplying factor
Immediate last year of assessment year *
Bidder should indicate actual figures of cost and the amount for the work executed in
Annexure-I without accounting for the above mentioned factors.
(e) Declaration regarding the work on hand with the tender should also be given in
prescribed performa as per Annexture-II. Attested copies of work orders, interim
certificates if any shall also be attach as supporting documents.
(f) Attested copy of partnership deed, power of attorney etc.
(g) Application Received from joint venture / consortium shall not be considered.
• attested copy of partnership deed, power of attoney etc.
• passport size photographs of partner / all partners on relevant page of technical bid.
• Tenderer shall submit only one tender for the work put to this tender.
• Tenderer shall submit the certificate of Employers code number under EPF Act.
IT-05 TENDER DOCUMENTS :
Printed and online documents and set of drawings shall comprehensively be referred to as
Tender documents. The several sections forming the documents are the essential parts of
the contract and a requirement occurring in one shall be binding as though occurring in all.
They are to be taken as mutually explanatory and describe and provide for complete
IT-06 EXAMINATION BY TENDERERS :
A. At his own expenses and prior to submitting his tender, each tenderer shall (a) examine
the contract Documents, (b) visit the site and determine local conditions which may
effect the work including the prevailing wages and other pertinent cost factors, (c)
familiarize himself with all CENTRAL, State and local laws, ordinance, rules,
regulations and codes affecting the material supply including the cost of permits and
licenses required for the work and (d) correlate his observations, investigations, and
determinations with the requirements of the Tender Documents.
B. The tender quantity is approximate and may increase or decrease. Any increase or
decrease in quantity will not entitle tenderer to claim any extra over the quoted rate.
C. Tender Documents be completed by legible ink, checked in a responsible manner,
signed, stamped and returned together with the Tender Security Bond by the stipulated
date, which shall form the Tender.
The Tenderer is required to complete :
(i) The form of tender, including the Appendices thereto Tender Security Bond and
the Tender summary duly signed and stamped.
All the pages in which entries are required to be made by the tenderer are contained in
the tender documents and the tenderer shall not take out or add to or amend the text of
any of the documents except in so far as may be necessary to comply with any addenda
issued pursuant to Clause IT-17 hereof.
IT-07 EARNEST MONEY DEPOSIT:
A. The Tender shall be accompanied by of Earnest Money Deposit Rs. 90,000/- The
tenderer shall pay Earnest Money Deposit by pay order/demand draft issued in favour of
Commissioner, Surat Municipal Corporation, Surat through Nationalised Bank only. The Earnest
Money Deposit in the form of FDR or cheque shall not be accepted. The tenderer shall have to
mention details of Earnest Money Deposit on the seal cover of Earnest Money Deposit. The tender
details of received without Earnest Money Deposit shall be out rightly rejected.
As Per Annexure 1 Finance Department, GR. No. FD/MSE/e-file/4/2024/2859/D.M.O, Date :
A. Gaurantees Isuued By the following bank will be accepted as SD/EMD on Permanent bania.
All Nationalized Banks
B. Gaurantees Isuued By the following bank will be accepted as SD/EMD for the period up to
March 31, 2026. The Validity Cut Off Date in the OR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Gaurantee.
Axis Bank South Indian Bank
AU Small Finance Bank Standard Chartered Bank
Bandhan Bank Tamilnadu Mercantile Bank
Barclays Bank Utkarsh Small Finance Bank
City Union Bank Yes Bank
CSB Bank Ahmedabad Mercantile Co.Op. Bank
DBS Bank India Limited Nutan Nagrik Sahakari Bank Limited
DCB Bank Rajkot Nagarik Sahakari Bank Ltd. RBL
Equitas Small Finance Bank Bank
ESAF Small Finance Bank Saraswat Co. Operative Bank Ltd.
Federal Bank SBPP Co. Operative Bank Ltd.
HDFC Bank SVC Co. Operative Bank Ltd.
HSBC Bank The Cosmos Co-Op Bank Ltd.
ICICI Bank The Gujarat State Co. Operative Bank
IDBI Bank The Mehsana Urban Co. Op. Bank Ltd.
IDFC First Bank The Surat District Co. Op. Bank Ltd.
Jammu & Kashmir Bank The Surat People’s Co. Op. Bank Ltd.
Jana Small Finance Bank The Kalupur Commercial Co. Op.Bank Ltd.
Karnataka Bank The Panchmahal District Co. Op. Bank Ltd.
Karur Vysya Bank The Baroda District Co. Op. Bank Ltd.
Kotak Mahindra Bank Baroda Gujarat Gramin Bank
Saurashtra Gramin Bank
All the eligible banks are instruted to collect the original documents/papers of guarantee from
the concerned tendering authority.
B. The Earnest Money Deposit(Tender guarantee) will be forfeited in the event, the
successful tenderer fails to accept the contract and fails to submit the Performance
Guarantee Bond to the owner as stipulated in this tender documents within ten days
after receipt of notice of award of contract. In such case owner may disqualify the
tenderer from tendering for further works, under the jurisdictions of the Corporation
C. The Earnest Money Deposit of the successful tender shall be returned after the
performance guarantee bond, as required, if furnished by the contractor.
D. No interest shall be paid by the owner on any tender guarantee.
IT-08 INCOME TAX CLEARANCE CERTIFICATE :
In view of the latest circular of IT Department IT clearance certificate is not required.
However the contractor shall give Xerox copy of the PAN card.
IT-09 PREPARATION OF TENDER DOCUMENTS :
Tenderers are requested to note the following while preparing the Tender Documents:
A. Technical bid, EMD and Tender fees shall be submitted on the Tender Form bound
herein in English. All tender items and statements shall be properly filled in. Numbers
shall be stated both in words and in figures where so indicated, and signatures of all
persons signing shall be in longhand.
B. Technical Bid shall be accompanied by the prescribed tender security bond and other
required documents and drawings. All witnesses and sureties shall be persons of status
and probity and their full names, occupations and address shall be stated below their
signatures. All signatures in the Tender Documents shall be dated.
C. Variations to the Contract Documents requested by the tenderer may be affixed to the
Tender Document in the space available and duly signed and stamped. Such variations
may be approved or refused by the Engineer at the time of adjudications of Tenders,
and in either case the Engineer is not obliged to give reasons for his decisions.
D. Delivery of Tenders shall comply with Notice inviting tenders as to place, date and
E. Price Bid shall be submitted online. Tenderers are requested to quote for all four parts
Demand Draft for E.M.D. & Tender (Bid) fee shall be submitted in electronic format
through online mode (by scanning) while uploading the bid. This submission shall
mean that E.M.D. & tender fee are received for purpose of opening of the bid.
Accordingly offer of those shall be opened whose E.M.D. & tender (bid) fee is received
electronically. However, for the purpose of realization of D.D. bidder shall send the
D.D. in original through RPAD / Speed post as per Clasue-3.10 below so as to reach to
Chief Accountant, SMC within 7 days from the last date of online submission of the
bid as per tender notice.
Penaltative action will be taken for not submitting original Demand Draft in the
account department of Surat Municipal Corporation within 7 days from the last date
of online submission of the bid for the first time as mentioned below.
Sr. Tender Amount Penalty Amount in Rs.
1. Up to Rs. 1 Crore Rs. 10,000/-
2. More than Rs. 1 Crore and Upto Rs. 10 Crore Rs. 20,000/-
3. More than Rs. 10 Crore and Upto Rs. 50 Crore Rs. 30,000/-
4. More than Rs. 50 Crore and Upto Rs. 100 Crore Rs. 70,000/-
5. More than Rs. 100 Crore Rs. 1,00,000/-
If bidder will not submit the penalty amount within 10 days to Surat Municipal
Corporation and/or bidder will not submit the demand draft in original for the second
time and after, Penaltative action shall be taken for abeyance of registration and
cancellation of E-tendering code for 6 (six) months.
Any documents in supporting of bid shall be in electronic format only through online
(by scanning) & hard copy will not be accepted separately.
IT 10 SUBBMISSION OF TENDERER DOCUMENT :-
1. Following documents shall be submitted in HARD COPY TO Surat Municipal
Earnest Money Deposit as mentioned in the Tender.
Tender Fees as mentioned in the tender
Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/-
Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
Other necessary documents mentioned in Technical Bid (if any)
Addenda-Corrigendum (if any) duly signed by Contractor.
Demand Draft for E.M.D. & Tender (Bid) fee shall be submitted in electronic format
through online mode (by scanning) while uploading the bid. This submission shall
mean that E.M.D. & tender fee are received for purpose of opening of the bid.
Accordingly offer of those shall be opened whose E.M.D. & tender (bid) fee is received
electronically. However, for the purpose of realization of D.D. bidder shall send the
D.D. in original through RPAD / Speed post as per Clasue-3.10 below so as to reach to
Chief Accountant, SMC within 7 days from the last date of online submission of the
bid as per tender notice.
Penaltative action will be taken for not submitting original Demand Draft in the
account department of Surat Municipal Corporation within 7 days from the last date
of online submission of the bid for the first time as mentioned below.
Sr. Tender Amount Penalty Amount in Rs.
1. Up to Rs. 1 Crore Rs. 10,000/-
2. More than Rs. 1 Crore and Upto Rs. 10 Crore Rs. 20,000/-
3. More than Rs. 10 Crore and Upto Rs. 50 Crore Rs. 30,000/-
4. More than Rs. 50 Crore and Upto Rs. 100 Crore Rs. 70,000/-
5. More than Rs. 100 Crore Rs. 1,00,000/-
If bidder will not submit the penalty amount within 10 days to Surat Municipal
Corporation and/or bidder will not submit the demand draft in original for the second
time and after, Penaltative action shall be taken for abeyance of registration and
cancellation of E-tendering code for 6 (six) months.
Any documents in supporting of bid shall be in electronic format only through online
(by scanning) & hard copy will not be accepted separately.
All documents must be coloured scanned to be seen as original. Scanning in black and
white or gray shall not be acceptable.
All documents must be notarized with clearly-displaying stamp, number and name of
(i) COVER-1 : Technical Bid
E.M.D and Tender Fees for the work of Proposed Furniture Work of Suman School
At Plot No. 1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B)
In North Zone (Katargam), Surat. along with other Documents in Hard Copy Up to
21/08/2026 up to 18.00 hrs. Also mention the name of tenderer, address, tender notice
number etc. on the cover .
Price bid for the work of Proposed Furniture Work of Suman School At
Plot No. 1/A Paikee, Beside NPSS School No. 312/232, Ganeshpura (G.H.B) In
North Zone (Katargam), Surat. shall be submitted online.
The name of work to be written on cover shall be work of Proposed
Furniture Work of Suman School At Plot No. 1/A Paikee, Beside NPSS School
No. 312/232, Ganeshpura (G.H.B) In North Zone (Katargam), Surat. Also
mention the name and the address of tenderer, tender notice number on the cover and to be
submitted to the Chief Accountant, Surat Municipal Corporation, Muglisara, Surat –
2. Tenderer shall be required to submit the enlisted documents as mentioned below in Cover-
1. If necessary document founds insufficient then the Price Bid of the tenderer shall not be
(a) The tender shall be accompanied by Earnest Money Deposit of Rs.90,000.00 The
tenderer will pay Earnest Money Deposit by Pay Order/Demand Draft issued in
favour of "Commissioner, Surat Municipal Corporation, Surat" by Nationalized
Bank. In the form of Demand Draft and Bank Guarantee.
(b) A covering letter detailing various considerations considered in tender shall
invariably be given.
(c) Passport size photographs of all the partners (incase of partnership firm) to be
fixed on relevant Page of the tender documents.
3. (a) List of tools, plants and equipments with tenderer in detail.
(b) Technical establishment/staff of the tenderer in required Performa with their
names, qualifications and experience.
(c) Tenderer shall furnish along with the tender, information regarding Income tax
circle of the district in which he is assessed for income tax with PAN No.
4. Submission of a tender by a tenderer shall mean that he has read this notice and contract
documents and has made himself aware of the scope and specifications of the work to
be done and of conditions and nature of required quantities of materials stores, tools and
plants etc. that may be required by him in carrying out the work and of local conditions
and laws and bylaws of the Government, Surat Municipal Corporation and other factors
bearing influence on the execution and cost of the works.
5. E.M.D., Tender Fee and other necessary document in hard copy shall be received by
Registered Post A.D. or by Speed Post through Postal Authority only by the "Chief
Accountant, Surat Municipal Corporation, Muglisara, Surat-395003 Up to Dt. 21/08/2026
up to 18.00 hrs.
The same will be opened on the 24/08/2026 (Technical Bid) on wards in the presence of
the tenderers, who shall remain present in the office of "Tender opening officer, Surat
Municipal Corporation, Surat. Late tenders (i.e. tenders received after the specified time of
opening), delayed tender (i.e. tenders received before the time of opening but after due
date and the time of receipt of tender) shall not be considered at all. Tenders received
by Registered Post A.D./ Speed Post after the time and the date specified in the tender
notice shall not be received by the client from the postman. Such tenders if received will
not be opened and will stand rejected.
6. Tender shall stand rejected if:
1. Any eraser is made in the tender unauthenticated or any page or pages is/are
removed or replaced.
2. The tenderer shall submit the tender which satisfied each and every conditions laid
down in the notice tender documents, failing which the tender will be liable for
3. Tenderer's tender/quotation containing conditions shall be liable for rejection out
rightly without assigning any reason for the same.
4. Stipulates the validity period less than what is stated in the form or tender.
5. Stipulates his own conditions.
6. Does not quote his rates inclusive of Octroi duty and other terminal or sales tax or
CENTRAL taxes in his rates.
7. Does not disclose the full names and address of all his partners in the case of
partnership firm.
8. Does not pay the Earnest Money Deposit by Demand Draft/Pay order and Tender
Fees with Technical Bid (Cover-1).
9. Does not submit the tender before the stipulated time and specified date in the
Account Office as directed.
10. Does not attached the document mentioned.
11. The tenderer proposes any alteration in the work specified in the tender or in the
time limit allowed for carrying out the work or any other condition.
7. All corrections, additions or posted slips to be initialed by the tenderer.
8. All page of tender documents including specifications should be initialed by the
9. The tenderer shall submit the tender which satisfies each and every conditions laid
down in this notice and tender documents failing which the tender is liable for rejection.
10. Notice of inviting tenders shall be a part of the contract documents.
11. Acceptance of tenderer/quotation will rest with the competent authority of Surat
Municipal Corporation who does not bind himself to accept the lowest and reserves the
right to accept or to reject any or all quotations/tenders and no reasons will be given for
acceptance or rejection thereof.
12. The contractor shall also attach list of machineries, tools, plants, equipments which he
propose to deploy for this work.
13. All octroi duty and other taxes chargeable by the Municipal Corporation shall be payable
by the Contractor.
14. Tender once accepted shall be binding on the contractor even if the formal agreement is
15. Tender once offered can not be withdrawn except with the permission of head of the
concerned department, Surat Municipal Corporation, Surat.
16. The successful tenderer shall be required to enter in to agreement with Municipal
Corporation after placing the work order for the said work from SMC.
17. The successful tenderer may be required to furnish surety of 20% of the contract value on
stamp paper if so desired by the Municipal Commissioner.
18. The tenderers are requested to give complete specification of work quoted.
19. Unless specifically mentioned by the tenderer for the extra payment of taxes on price
quoted by them it will be presumed the prices quoted are inclusive of the all taxes and
no claim will be entertained for payment of extra taxes on the bills submitted by them.
20. The Price-bid will be opened only after technical clarifications are clarified.
21. Surat Municipal Corporation reserves the right to open or not to open any or all Price-bid
without assigning any reason thereof.
IT-11 TENDER VALIDITY PERIOD :
The validity period of the tender submitted for this work shall be of one hundred twenty
(120) Calendar day from the date of opening of price bid and that the tenderer shall not be
allowed to withdraw or modify the tender offer on his own during the validity period. The
tenderer will not be allowed to withdraw the tender or make any modifications or
additions in the terms and conditions of his own in his tender. If this is done then the
owner shall, without prejudice to any right or remedy, be at liberty to reject the tender and
forfeit the Earnest Money Deposit in full.
IT-12 SIGNING OF TENDER DOCUMENTS :
If the Tender is made by an individual it shall be signed with his full name above his
current address. If he tender is made by a Proprietary firm it shall be signed by the
proprietor above his name and the name of his firm with his current address.
If the tender is made by a firm in partnership it shall be signed by all the partners of the
firm above their full names and current addresses, or by a partner holding the power of
attorney for the firm signing the Tender in which case a certified copy of the power of
attorney shall accompany the Tender. A certified copy of the partnership deed, current
addresses of all the partners of the firm shall also accompany the tender.
If the tender is made by a limited company or a limited Corporation,it shall be by a duly
authorised person holding the power of attorney for signing the Tender in which case a
certified copy of the power of attorney shall accompany the Tender. Such limited
company or Corporation may be required to furnished satisfactory evidence of its
existence before the contract is award.
All witnesses and sureties shall be persons of status and probity and their full names,
occupations and addresses shall be stated below their signatures. All signatures in the
Tender document shall be dated.
IT-13 WITHDRAWAL OF TENDERS :
If, during the Tender validity period, the Tenderer withdraws his Tender, the Tender
Security (Earnest Money) shall be forfeited and the Tenderer may be disqualified
from tendering for further works under the jurisdiction of SURAT MUNICIPAL
IT-14 INTERPRETATIONS OF TENDER DOCUMENT :
Tenderers shall carefully examine the tender documents and fully inform themselves as to
all the conditions and matters which may in any way effect the work or the cost thereof.
Should a tenderer find discrepancies or omission from the specifications or other
documents, or should be in doubt as to their meaning, he should at once address querry to
the Divisional Head provided for concerned authority as referred in the Tender Document
in Clause GC-01 (Definitions and interpretations) of the (General Condition of Contract).
Any resulting interpretation of the Tender documents will be issued to all Tenderers as an
addenda corrigendum.Verbal clarification and/or information given by the SMC /
Consulting Engineer shall not be binding on the Municipal Corporation.
IT-15 ERRORS AND DISCREPANCIES IN TENDERS :
In case of conflict between the figures and words in the rates, the rates expressed in words
shall prevail and apply in such cases.
IT-16 MODIFICATION OF DOCUMENTS :
Modification of specifications and extension of the closing date of the tender, if required,
will be made by an addendum. Copies of each addendum will be sent to all tenderers.
These shall be Signed and shall form a part of tender. The tenderer shall not add to or
amend the text of any of the documents except in so far as may be necessary to comply
with any addenda.
Addenda form part of the contract documents & full consideration shall be given to all
addenda in the preparation of tenders. Tenderers shall verify the number of addenda
issued, if, any and acknowledge the receipt of all Addenda in the Tender. Failure to
acknowledge may cause the Tender to be rejected.
A. The Engineer of the owner may issue Addenda to advise Tenderers of changed
requirements.Such addenda may modify previously issued Addenda.
B. No Addendum may be issued after the time stated in Notice Inviting Tenders.
IT-18 TAXES AND DUTIES ON MATERIAL :
All charges on account of Octroi, terminal tax or Sales tax, GST etc. and other duties on
material obtain for the works from any source shall be borne by the Contractor. 'P' and
'C' form shall not be supplied by the Municipal Corporation.
IT-19 EVALUATION OF TENDERS :
As per IT (04), Experience of the Contractor shall be considered for Similar kind of works.
IT-20 EVALUATION OF TIME REQUIRED FOR COMPLETION :
The time required for completion of work shall be considered as indicated by the tenderer
in the completion schedule attached with the tender. The completion period mentioned in
this schedule is to be reckoned from 10th day from the date of work order to proceed. Total
completion period is calendar months from 10th day from date of issue of work order and
tenderers should adhere to this delivery time.
IT-21 POLICY FOR TENDER UNDER CONSIDERATION :
Tenders shall be termed to be under consideration from the opening of the tender until
such time an official announcement of award is made.
While tenders are under consideration, tenderers and their representative or other
interested parties are advised to refrain from connecting by any means Municipal
Corporation or representatives on matters related to the tenders under study. The
Engineer's representative if necessary will obtain clarification on tenders by requesting
information from any or all the tenderers either in writing or through personal contact, as
may be necessary. The tenderers will not be permitted to change the substance of his
tender after price submission. Non-compliance with this provision shall make the tender
liable for rejection.
IT-22 PRICES AND PAYMENTS :
The tenderer must understand clearly that the price quoted are for the total works or the
part of the total works quoted for and include all costs due to Materials labour, equipment,
supervisions, other services, royalties and Octroi etc. and to include all extras to cover the
cost. No claim for additional payment beyond the prices quoted will be entertained and the
tenderer will not be entitled subsequently to make any claim on any ground excepting for
the condition laid down in GC-35 (Price Adjustment).
IT-23 PAYMENT TERMS :
The terms of payment are defined in the General Conditions of Contract. The Municipal
Corporation shall not under any circumstances relax, their terms of payment and will not
consider any alternative payment terms. Tenderers should therefore in their own interest
note this provision to avoid rejection of their tenders.
Award of the Contract or the rejection of tenders will be made during the Tender validity
period stated in the Notice Inviting Tenders.
A. After all contract contingencies are satisfied and the Notice of Award is issued, the
successful Tenderer shall execute the Contract Agreement within the time stated in the
Notice Inviting Tenders and shall furnish the Bond as required herein. The Contract
Agreement shall be executed in the form stipulated by the owner. A copy of the
required form is included in the contract documents.
B. If the Tenderer receiving the Notice of Award fails or refuses to execute the Contract
Agreement within the stated time limit or fails or refuses to furnish the Bond as
required herein, the SMC may annul his award and declare the tender security
C. A Corporation, Partnership firm or other consortium acting as the Tenderer and
receiving the Award shall furnish evidence of its existence and evidence that the
officer signing the Contract Agreement & Bonds for the Corporation, partnership firm
or other consortium acting as the Tenderer is duly authorised to do so.
IT-25 SIGNING OF CONTRACT :
The successful tender shall be required to pay the security deposit and to execute the
contract within 10 days of receipt of intimation to execute the contract, failing which the
Municipal Corporation will be entitled to annul the award and forfeit the Earnest Money
Deposit. The person to sign the contract document shall be person detailed in Article IT-
IT-26 DISQUALIFICATION :
A tender shall be disqualified and will not be taken for consideration if :-
(a) The outer envelope does not show on the outside the reference of bid and thus get
opened before the due date of opening (as per Article IT-10 i.e. Submission of Tender
(b) The tender Security Deposit is not deposited in full and in the manner i.e. Earnest
(c) The tender is in a language other than English or does not contain its English
Translation in case of other language adopted for tender preparation.
(d) The tender documents are not signed by an authorised person.
(e) The general performance data for qualification not submitted fully.
(f) The tenderer does not agree to deposit security amount as specified (as per Article IT-
25 i.e. Signing of Contract).
(g) The tenderer does not agree to payment terms defined as per Article IT-23 i.e. Payment
(h) Conditional tender.
A. Tenderer may further be disqualified if :
(a) Price variation is proposed by the Tenderer on any principles other than
provided in the Tender Documents.
(b) Completion schedule offered is not consistent with the completion schedule
defined and specified in tender documents.
(c) The validity of tender is less than that mentioned in Article IT-11 i. e. Tender
Validity Period.
(d) Any of the page or pages of tender is/are removed or replaced.
(e) All corrections or pasted slips are not initialed by tenderer.
(f) Any erasure is made in the tender.
(g) Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/- is not attach
(h) Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300 is not attch
IT-27 PERFORMANCE GUARANTEE (SECURITY DEPOSIT) :
The total Security Deposit is 4% (Four) percent of contract value and shall be as under:
The successful tenderer shall have to pay initial security deposit at 2% (two) percent of the
tendered amount.
• Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order if
the Tender Amount of work is less than Rs. 2.00 crore.
• Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order /
bank Guarantee (encashable at Surat city)/ FDR if the tender Amount of work is more
than Rs. 2.00 crore & 2.00 crore.
The person/persons whose tender may be accepted [here-in after called the Contractor, which
expression shall unless excluded by or repugnant to the context include his heirs, executors,
administrators and assignees shall (within 15 days of the receipt by him of the notification of the
acceptance of his tender) deposit with Municipal Commissioner cash or Government securities
endorsed to the Commissioner sum sufficient which will make up the full security deposit
specified in the tender.
If the amount of the security deposit to be paid in lump sum within the period specified above is
not paid the tender contract already accepted shall be considered as cancelled. The security deposit
lodged by Contractor shall be refunded after the expiry of the Defects Liability period as shown in
the attached Memorandum after deducting dues, if any, which become liable to be recovered from
the Contractor under the terms and conditions of this Agreement.
Regarding remittance and release of Security Deposit (SD), Retention money deposit (RMD)
following clause will supersede over and above all the clauses depicted in the tender
Tender costing Less than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of
which, 50% of amount as Initial Security Deposit shall be payable at the rate of 2% of
approved tender cost in form of Cash or Demand Draft/ Pay Order of any Nationalised
Bank (encashable at Surat city).
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each
running account bill.
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b) Release of SD/RMD
(i) The 2% Initial security deposit in form of Cash or Demand Draft/ Pay Order shall
be released after clearance of Final bill by Audit Dept and completion of defect
liability period.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall
be released along with Final Bills according to Work Quality..
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
Tender costing Rs.2.00 Crore. & more than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of
which, 50% of amount as Initial Security Deposit shall be payable at the rate of 2% of
approved tender cost in form of in Cash or Demand Draft/ Pay Order / FDR / Bank
Guarantee of any Nationalised Bank (encashable at Surat city).
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each
running account bill.
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b 1) Release of SD/RMD
(i)The 2% Initial security deposit in form Demand Draft /Pay order / FDR shall be
released after clearance of Final bill by Audit Dept & completion of defect liability
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall
be released along with Final Bills according to Work Quality.
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
(b 2) Release of SD/RMD
(i)The 2% Initial security deposit in form Bank Guarantee shall be released along with
Final Bills according to Work Quality.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall
be released after clearance of Final bill by Audit Dept & completion of defect liability
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
The amount recovered from the running bills as security deposit shall not be allowed to the
transferred in the form of Bank Guarantee. However, the remaining 50% (2% of Security
Deposit) of the amount so, deducted from running bills will be allowed for conversion in the form
of interest bearing fixed deposit receipt, (FDR) issued in favour of the Municipal Commissioner,
Surat Municipal Corporation, Surat by a Nationalized Bank located at Surat only. Additional
stamp duty payable as per government prevailing rule shall be paid by contractor for remittance
It is clarified that the amount of security deposit shall be collected on the basis of contract price
and not on the basis of Estimated Amount put to tender. As initial Security Deposit as mentioned
above, accepted by the competent Authority shall have to be paid toward Security Deposit at the
time of execution of agreement.
Interest will be payable on FDR (that is deducted from Running Bill and converted in to FDR for
initial SD) for One year, after completion of work. After that no further interest shall be paid for
any extended period what so ever.
If the Security Deposit is not paid within 15 days from the date of L.O.I. / Work Order than
penalty at the rate of 0.065% per day of the amount of Security Deposit will charged. If the
Security Deposit is not paid within one month with interest, necessary actions as per condition of
contract will be taken.
Initial Security Deposit ( i.e. 2% Of Tender Amount) in form of Bank Guarantee may be
accepted as per relevant tender provision, However BG shall be valid till final date of
completion of work+1year (Whether final bill is audited and paid or not). It shall be
contractor's responsibility to extent the BG On Or Before expiry of time limit of BG. In case
of late renewal of BG, penalty of security deposit shall be levied at the rate of 0.065% of per
day of BG amount.
The successful tenderer shall have to enter into an agreement on a non-judicial stamp paper
of Rs. 300/- if initial Security Deposite paid in form Bank Guarantee or Demand draft as per
the form of the agreement approved by the Municipal Corporation, Surat.
If initial Security deposit is paid in form of Fixed Deposit, additional stamp paper
amounting As per government’s prevailing rule of Security Deposit shall be used to execute
The undertaking shall be executed on stamp paper worth Rs. 300/-.
The Surety shall be executed on stamp paper worth Rs. 300/-.
IT-28 STAMP DUTY :
The successful tenderer shall have to enter into an agreement on a non-judicial stamp
paper of Rs.4.90% of S.D. Amount, if S.D. Amount paid in form of FDR and otherwise as
per the form of the agreement approved by the Municipal Corporation, Surat.
The undertaking shall be executed on stamp paper worth Rs. 300/-.
The Surety shall be executed on stamp paper worth Rs. 300/-.
IT-29 BRAND NAMES :
Specific references in the specifications to any Materials by tender's name, or catalogue
number shall be construed as establishing a standard or quality and performance and not as
limiting competition and the tenderer in such cases, may at their option freely use any
other product, provided that it ensures and equal or higher quality than the standard
mentioned and meets Municipal Corporation approval.
IT-30 NON-TRANSFERABLE :
Tender documents are not transferable.
IT-31 COST OF TENDERING :
The owner will not defray expenses incurred by Tenderers in tendering.
IT-32 DEFECT OF TENDER :
The Tender for the work shall remain open for a period of 120 calendar days from the date
of receipt of the tenders for this work and that the tenderer shall not be allowed to
withdraw or modify the offer on his own during the period. If any tenderer withdraws or
makes any modifications or additions in the terms and conditions on his own, then the
Municipal Corporation, shall without prejudice to any right or remedy, be at liberty to
reject the tender and forfeit the earnest money in full.
IT-33 CHANGE IN A QUANTITY :
The Surat Municipal Corporation reserves the right to waive any informality in any tender
and to reject one or all tenders without assigning any reasons for such rejections and also
to very to quantities of items or group as specified in the Schedule of price as may be
necessary. Claim what so ever by the contractor on the basis of variation of quantities shall
not be entertained.
IT-34 NEW EQUIPMENT AND MATERIAL ;
All Materials, equipment and spare parts thereof shall be new, unused and originally
coming from manufacturer's plant to the Corporation. The rebuilt or overhauled
equipment/Materials will not be allowed to be used on work.
IT-35 RIGHTS RESERVED ;
The SMC reserves the right to reject any or all tenders, to waive any informality or
irregularity in any tender without assigning any reasons. The SMC further reserves the
right to withhold issuance of the notice to proceed, after execution of the contract
agreement, for the period of time stated in the notice inviting tenders and no additional
payment will be made to the successful tenderer on account of such withholding. The
SMC is not obliged to give reasons for any such action.
IT-36 Municipal Commissioner reserves the right to reduce the scope of work and split the
tender in two or more parts without assigning any reason even after the award of contract.
IT-37 No mobilisation advance or advance on machinery will be given.
IT-38 The scope of work is clearly mentioned in the tender documents. The contractor shall have
to carry out the work in accordance with the details specifications. No conditions will be
accepted. The conditional tender will be liable to be rejected.
IT-39 The surplus excavated earth, after backfilling the trenches shall have to be removed from
the site as directed.
After compaction and consolidation, if any short fall of earth is found then contractor has
to bring the same to the required quantity in order to meet shortfall at his own cost. More
over, if any settlement of road after reinstatement is observed during the defect liability
period of the work. Contractor shall be fully responsible for the defective work and
patches/ depression / settlement shall be repaired with quarry spoil or metal at contractor's
own cost. If contractor fails to repair the patches / depression / settlement in time,
corporation will repair it at all risk and cost of contractor.
Surplus earth shall not be disposed off in a way that leads to nuisance to the public or
GST CLAUSE FOR CONSTRUCTION / ERECTION / COMMISSIONING /
INSTALLATION / REPAIRS / MAINTENANCE / RENOVATION / FABRICATION
OF STRUCTURE INCLUDING BUILDING (MEANS ALL WORKS CONTRACT /
TURN KEY PROJECTS / SUPPLY OF MATERIAL /GOODS).
GST (Goods & Service Tax) has come in existence from 1st July, 2017. Contractor /
Successful Bidder is bound to pay any amount of GST prescribed by the Govt. of India as
per the Terms of Contract agreed upon during the course of execution of this Contract.
During the course of execution of Contract, if there is any change in Rate of GST (Goods
& Service Tax) by the Government, the same shall be reimbursed / recovered separately by
SMC, subject to the submission of Original Receipt / Proof for the amounts actually
remitted by the Successful Tenderer / Contractor to the Competent Authority along with a
Certificate from Chartered Accountant of Contractor / Successful Bidder certifying that the
amount of GST paid to the Government and the same shall be intimated / submitted /
claimed within 30 (Thirty) Days from the date of payment. Remittance of GST within
stipulated Period shall be the sole responsibility of the Successful Bidder / Contractor,
failing which, SMC may recover the amount due, from any other payable dues with SMC
and decision of Municipal Commissioner shall be final and binding on the Contractor /
Successful Bidder in this regard. Further, the non-payment of GST to the Government may
lead to the termination of contract and forfeiture of Security Deposit / Performance
Guarantee Amount.
If imposition of any other new Taxes / Duties / Levies / Cess or any other incidentals etc.
in the existing Taxes / Duties / Levies / Cess or any other incidentals etc. (Excluding GST)
are imposed during the course of the contract, the same shall be borne by the Contractor /
Successful Bidder only, in no case SMC shall be liable for the same.
The Contractor will submit the invoice to the SMC having GSTIN of SMC mentioned
therein and the taxes shall be shown separately on the face of the Invoice so as to claim as
NOTE :- The Rates mentioned in BOQ are excluding GST. GST will be reimbursed
separately (if applicable as per the opinion of Account department of SMC / GST
Consultant of SMC) as per the prevailing GST Rates decided by the Government.
The contractor is invariably bound to any changes in GST Rates made during the
course of the work. Decision of Account Department of SMC regarding applicable
GST Rates will be final. Construction Cess will be deducted from all Running Bills &
Final Bills as per the prevailing Government Rates
IT-41 No escalation charge/rates shall be paid by SMC in anycase.
IT-42 Contractor must be submitted The cement/steel (Zerox copy) bill wise.
IT-43 Contractor must be submitted royalty pass(zerox).
IT-44 All the taxes should be bear by agency & it should be applicable as per government
resolution (of change periodically) & No compensation/Reimbersion should be given to
IT-45 TAX INVOICE FOR PAYMENT OF WORK (AS PER GST RULES)
The contractor shall submit all bills on the Prescribed format, include in Tender for
purpose of payment of the work to the office of the Engineer-in-charge.
IT-46 TESTING OF CEMENT AND STEEL
It should be specifically noted that the cement and steel brought by the contractor at site of
work shall be used only after the same is tested at the approved laboratory as per the
direction of the Engineer-in-charge. Such approved laboratory may be located at Surat,
Baroda, and Ahmedabad or Mumbai.
All the charge for the transport and testing of the samples shall have to be borne by
the contractor. The frequency of testing such material shall be in accordance to the relevant
Indian Standards as directed by Engineer-in-charge
EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
GENERAL CONDITION OF CONTRACT
GC-01 DEFINITIONS AND INTERPRETATIONS :
1.0 In the contract documents, as herein defined the following words and expression used
shall, unless, repugnant to the subject or context thereof, have the following meanings assigned to
1.1 The "Owner/Municipal Corporation, Surat represen-ted by Municipal
Commissioner/Add.City Engineer, any officer authorised by the Municipal Corporation.
1.2 The "Contractor" shall mean the person or the persons, firm of company whose tender
has been accepted by the owner and includes his legal representative successors and permitted
1.3 The "Engineer-in-charge" shall mean the person designated as such by the owner from
time to time and shall include those who are expressly authorised by the Municipal
Corporation to act for and on its behalf for the operation of this contract.
1.4 "Engineer - in - charge's Representative" shall mean any Engineer or Asstt. to the
Engineer-in-charge designated from time to time by the Engineer-in-charge to perform duties
set forth in the Tender documents whose authority shall be notified in writing to the
Contractor by the Engineer-in-charge.
1.5 "Tender" The offer or proposal of the Tenderer submitted in the prescribed form setting
forth the prices for the work to be performed, and the details thereof.
1.6 "Contract Price shall mean total money payable to the Contractor under the contract
1.7 "Addenda" shall mean the written or graphic notices prior to submission of tender
which modify or interpret the contract documents.
1.8 "Contract Time" - The number of consecultative calendar months for the completion
of work as stated in the executed contract agreement.
1.9 "Contract" shall mean agreements between the parties for the execution of works
including therein all contract documents.
1.10 "Tender document" shall mean Designs, Drawings, specifica- tions, agreed variations, if
any, and such other documents constituting the tender and acceptance thereof.
1.11 "The Sub-Contractor" means any person, firm or company (other than the contractor)
to whom any part of the work has been entrusted by the Contractor with the written consent
of the Engineer-in-charge and the legal personnel representative, successors and permitted
assigness of such person, firm or company.
1.12 "The Specifications" shall mean all directions' the various technical specifications
provisions and requirements attached to the contract which pertain to the method and manner
or performing the work to the quality of the work and the Materials to be furnished under the
contract for the work and any order(s) or instruction (a) thereunder. It shall also mean the latest
Indian Standards Institution Specifications for or relative to the particular work or part there of,
so far as they are not contrary to the Tender specifications or I.S.I. specifications, and in
absence of any tender specifications, the specifications of any other country applied in India
as a matter of Standard Engineering practice and apprroved in writing by the Engineer-in-
charge with or without modifications.
1.13 The "Drawing" shall include maps, plans, tracings or prints thereof with any modifications
approved in writing by the Engineer-in-charge and such other drawings, as may, from time to
time, be furnished or approved in writing by the Engineer-in-charge in connection with the
1.14 The "Work" shall mean the works to be executed in accordance with the context or
the part thereof as the case may be and shall include extra, additional altered or substituted
works as required for the purpose of the Contract. It shall mean the totally of the work by
expression or implication envisaged in the contract and shall include all material, equipment
and labour required for or relative or incidental to or in connection with the commencement,
performance and completion of any work and/or for incorporation in the work.
1.15 The "Permanent work"means works which will be incorporation in and form part of the
work to be handed over to the owner by the contractor on completion of the contract.
1.16 The "Temporary Work" shall mean all temporary works of every kind required in or
about the execution, completion and maintenance ofthe work.
1.17 "Site shall mean the land and other place on, under, on or through which the work is to
be carried out and any other lands or places provided by the Municipal Corporation for the
purpose of the Contract together with any other places designated in the Contract as forming
part of the site.
1.18 "The Construction Equipment" means all appliance/equipments of whatever nature
required in or for execution, completion or maintenance of work or temporary works (as
hereinafter defined) but does not include Materials or other things intended to form or forming
part of the permanent work.
1.19 "Notice in Writing or Written Notice" means a notice written, types or printed form
delivered personally or sent by Regisgered post to the latest know private of business
address at Registered Office of the Contractor.
1.20 The "Alteration/Variation order" means an orders given in writing by the Engineer-in-
charge to effect additions to or deletion from and alterations in the work.
1.21 "Final Test Certificate" shall mean the final test Certificate issued by the owner
within the provisions of the Contract.
1.22 The "Completion Certificate" shall mean a certificate to be issued by the Engineer-in-
charge when the work has been completed to his satisfaction.
1.23 The "Final Certificate" shall mean the final certificate issued by the Engineer-in-charge
after the work is finally accepted by the owner.
1.24 "Defect Liability Period" shall mean the specified period between the issue of
completion Certifi-cate and the final certificate as specificed in the tender.
1.25 "Approved" shall mean approved in writing including subsequent modification in
writing of previous verbal approval and "Approval" means approved in writing including as
1.26 "Letter of Acceptance"shall mean an intimated by a letter to tenderer that the tender has
been accepted in accordance with provisions contained therein.
1.27 "Order" and "Instruction" shall respectively mean any written order or instruction
given by the Engineer-in- charge within the scope of his powers in terms of the Contract.
1.28 "Running Account Bill" shall mean a Bill for the payment of "On Account" money to
the contractor during the progress of work on the basis of work done and the non-perishable
Materials to be incorporated in the work supplied by the Contractor.
1.29 "Security Deposit" shall mean the deposit to be held by the owner as security for the due
performance of contractual obligations.
1.30 "The appointing authority" for the purpose of Arbitration shall be the Municipal
Commissioner, Surat Municipal Corporation, Surat.
1.31 Retention Money shall mean the money retained from R.A. Bill for due completion of
1.32 Unless otherwise specifically stated, the masculine gender shall include the faminine
and natural genders and viceversa and the singular shall include the plural and vice-versa.
GC-02 LOCATION OF SITE AND ACCESSIBILITY :
The site of works is within the limits of Surat Municipal Corporation. It is served by all
weather roads and Western Railway Broad Guage line, Government Irrigation Canal Crossing.
The intending Tenderer should inspect the site and make himself familier with site conditions and
available communication facilities. Non availability of access/roads shall in no case be the cause
to condon any delay in the execution of the work or be the cause for any claims or extra
GC-03 SCOPE OF WORK :
The scope of work is defined broadly in the special conditions of Contract and specifications.
The Contractor shall provide all necessary Materials equipment and labour etc. for the
execution and of the work till completion. All Materials that go with the work shall be
approved by the Engineer-in-charge prior to procurement and use.
Owner at his discretion may endeavour to provide water to the Contractor at the owner's source
of supply at one point at the rate charged for such works.
The contractor shall make his own arrangement for the distribution pipe net works from the
source of supply after getting prior permission for the same from the Engineer-in-charge.
Supply of water shall not be free and the necessary charges as fixed by the Local Body shall have
to be paid by the contractor.
However, owner does not guarantee the supply of water and this does not relieve the contractor of
his responsibility in making his own arrangements and for the timely completion of the work
The Contractor shall have to make his own arrangement for power supply.
LAND FOR CONTRACTOR'S FIELD OFFICE, GODOWN & WORKSHOP:
Owner will not be a position to provide land required for Contractors shall have to make his
own arrangement for the same. No land will be provided by S.M..C. to the contractor for
constructing his labour and supervisory comp and other service facilities.
GC-04 RULLING LANGUAGE :
The language according to which the contractor shall be constructed and interpreted shall
be English. All entries in the contract documents and all correspon-dence between the
contractor and the Municipal Corporation or the Engineer shall be in English. All dimensions
for the Materials shall be given in metric units only.
GC-05 INTERPRETATION OF CONTRACT DOCUMENT :
1. The provisions of the General Conditions of Contract and special conditions of contract
shall prevail over those of any other documents of the contract unless specifically provided
otherwise. Should there be any discrepancy, inconsistency error or ommission in the
several documents forming the contract, the matter may be referred to the Engineer-in-charge
for his instructions and decision. The Engineer-in-charge's decision in such case shall the final
and binding to the contractor.
2. Works shown upon the drawings but not described in the specifications of described in
the specific specifications without showing on the drawings shall be taken as described in the
specifications and shown on the drawings.
3. The heading and the marginal notes to the clauses of those general conditions of contract or to
the specifications or to any other part of tender documents are solely for the purpose of giving
a concise indication and not a summary of contents thereof or be used in the interpretation or
construction thereof of the contract.
4. Unless otherwise stated specifically, in this contract documents the singular shall include
the plural and vice versa wherever the context so requires. Works implementing persons shall
include relevant corporated companies/ registered associations / body of individual / firm of
5. Notwithstanding the sub-divisions of the documents into separate sections and volumes
every part of each shall be supplementary to and complementary of every other part and shall
be read with and into the context so far as it may be practicable to do so.
6. Where any portion of the General Conditions of contract is repugnant to or ar variance with
any provisions of the special conditions of contract, then, unless a different intension appears,
the provisions of the special conditions of contract shall be deemed to override the provisions of
General conditions of Contract and shall to the extent of such repugnancy or variance prevail.
7. The Materials, Design and Workmanship shall satisfy the relevant I.S.S.and Codes referred
to. If Additional require- ments are shown in the specifications, the same shall be satisfied over
and above I.S.S. and Codes.
8. If the specification mention that the contract shall perform certain work or provide certain
facilities, it will mean that the contractor shall do so at his own cost.
9. The correctness of the details given in the tender documents is not guaranteed. The contracotr
shall independently obtain all necessary information for making the tender. The contractor
shall be deemed to have examined the Contract Documents, to have generally obtained his
own information in all matters that might affect the carrying out of the work or the Tenderer
rates. Any error in description of quantity or commission there from shall not vitiate the contract
or release the contractor from executing the work comprised in the contract according to the
Drawings and specifications at the tendered rates. He is deemed to have known the scope,
nature and magnitude of the work and the requirements of Materials and labour involved and as to
what all works he has to complete in accordance with the contract what-soever be the defects,
omissions, or errors that may be found in the contract documents. The contractor shall be
deemed to have visited the site and the surroundings,to have satisfied himself to the nature of all
existing structures, if any, and also as to the nature and the conditions of railways, roads,
bridges and culverts, means of transport and communications, whether by land, air or water and
as to possible interceptions thereto and the access and agrees from the site, to have made
inquires, examined and satisfied himself as to the sites for obtaining sand, stones, bricks and
other Materials, the sites for disposal of surplus Materials, the available accommodation as
to whatever required, the depicts and such other buildings as may be necessary for executing
and completing the work, to have local independent inquiries as to the subsoil, subsoil water and
variation thereof, storms, prevailing winds, climatic conditions and all other similar matters
effecting the work. He is deemed to have acquinted himself as to his liability for payment of
Government taxes, custom duty and other charges.
Any neglect or failure on the part of the contractor in obtaining necessary and reliable
information upon the forgoing or any other matters affecting the contract shall not relieve him
from any risks or liabilities or the entire responsibility from completion of the work at the
tendered rates and time in strict accordance with the contract documents.
No verbal agreement or inference from conversation with any officer or employee of the worner
either before or after the execution of the Contract Agreement shall in any way effect or modify
any of the terms of obligations herein contained.
GC-06 CONTRACTOR TO UNDERSTAND HIMSELF FULLY :
The contractor by tendering shall be deemed to have satisfied himself, as to consideration and
cirucmstances affecting the tender price, as to the possibility of executing the works as shown
and described in the contract and to have fixed his prices accordingg to his own view on these
matters and to have understand that no additional allowances except as otherwise expressely
provided, will after words be made beyond the contract price. The contractor shall be
responsible for any misunder-standing or incorrect information given in writting by the
GC-07 ERROR IN SUBMISSION ;
The contractor shall be responsible for any errors or ommissions in the particulars supplied
by him. Whether such particulars have been approved by the Engineer or not, provided that such
discrepancies, errors or ommissions be not due to inaccurate information or particular furnished
in writing to the Contractor by the Municipal Corporation or the Engineer.
GC-08 SUFFICIENCY OF TENDER :
The Contractor shall be deemed to have satisfied himself before tendering as to the
correctness of the tender rates which rates shall, except as or other wise provided for, cover all
the Contractor's liabilities and obligation set forther or implied in the contract for the proper
execution of work for compliance with requirements of Article GC-19 thereof.
GC-09 DISCREPANCIES :
The drawings and specifications are to be considered as mutually explanatory of each other,
detailed drawings being followed in preference to small scale drawings and figures dimension
in preference to scale and special conditions in preference to general conditions. Special
direction or dimen- sions given in the specifications shall supersede all else. Should any
discrepanies however, appear or should any misunderstanding arise as to the meaning and
intent of the said specifications or drawings, or as to the dimensions or the quality of the
Materials or the due and proper execution of the works, or as to the measurement or quality and
valuation of the works executed under this contract or as extra there upon the same shall be
explained by the Engineer-in-charge and his explanation shall subject to the final decision
of the Additional City Engineer, in case reference be made to him, be binding upon the
contractor shall execute the work according to such explanation (subject to aforesaid) and without
addition to or deduction from the contract and shall also do all such works and things necessary
for the proper completion of the works as implied by the Drawings and specifications, even
though such works and things are not specially shown and described in said specifications. In
cases where not particular specifications are given for any article to be used under the contract,
relevant specifications of the Indian Standard Institution shall apply.
GC-10 PERFORMANCE GUARANTEE : (Security Deposit)
The total Security Deposit is 4% (Four) percent of contract value and shall be as under:
The successful tenderer shall have to pay initial security deposit at 2% (two) percent of the
tendered amount.
• Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order if
the Tender Amount of work is less than Rs. 2.00 crore.
• Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order /
bank Guarantee (encashable at Surat city)/ FDR if the tender Amount of work is more
than Rs. 2.00 crore & 2.00 crore.
The person/persons whose tender may be accepted [here-in after called the Contractor, which
expression shall unless excluded by or repugnant to the context include his heirs, executors,
administrators and assignees shall (within 15 days of the receipt by him of the notification of the
acceptance of his tender) deposit with Municipal Commissioner cash or Government securities
endorsed to the Commissioner sum sufficient which will make up the full security deposit
specified in the tender.
If the amount of the security deposit to be paid in lump sum within the period specified above is
not paid the tender contract already accepted shall be considered as cancelled. The security deposit
lodged by Contractor shall be refunded after the expiry of the Defects Liability period as shown in
the attached Memorandum after deducting dues, if any, which become liable to be recovered from
the Contractor under the terms and conditions of this Agreement.
Regarding remittance and release of Security Deposit (SD), Retention money deposit (RMD)
following clause will supersede over and above all the clauses depicted in the tender
Tender costing Less than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of
which, 50% of amount as Initial Security Deposit shall be payable at the rate of 2%
of approved tender cost in form of Cash or Demand Draft/ Pay Order of any
Nationalised Bank (encashable at Surat city).
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each
running account bill.
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b) Release of SD/RMD
(i) The 2% Initial security deposit in form of Cash or Demand Draft/ Pay Order shall
be released after clearance of Final bill by Audit Dept and completion of defect
liability period.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall
be released along with Final Bills according to Work Quality..
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
Tender costing Rs.2.00 Crore. & more than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of
which, 50% of amount as Initial Security Deposit shall be payable at the rate of 2% of
approved tender cost in form of in Cash or Demand Draft/ Pay Order / FDR / Bank
Guarantee of any Nationalised Bank (encashable at Surat city).
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each
running account bill.
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b 1) Release of SD/RMD
(i)The 2% Initial security deposit in form Demand Draft /Pay order / FDR shall be
released after clearance of Final bill by Audit Dept & completion of defect liability
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall
be released along with Final Bills according to Work Quality.
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
(b 2) Release of SD/RMD
(i)The 2% Initial security deposit in form Bank Guarantee shall be released along with
Final Bills according to Work Quality.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall
be released after clearance of Final bill by Audit Dept & completion of defect liability
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
The amount recovered from the running bills as security deposit shall not be allowed to the
transferred in the form of Bank Guarantee. However, the remaining 50% (2% of Security
Deposit) of the amount so, deducted from running bills will be allowed for conversion in the form
of interest bearing fixed deposit receipt, (FDR) issued in favour of the Municipal Commissioner,
Surat Municipal Corporation, Surat by a Nationalized Bank located at Surat only. Additional
stamp duty payable as per government prevailing rule shall be paid by contractor for remittance
It is clarified that the amount of security deposit shall be collected on the basis of contract price
and not on the basis of Estimated Amount put to tender. As initial Security Deposit as mentioned
above, accepted by the competent Authority shall have to be paid toward Security Deposit at the
time of execution of agreement.
Interest will be payable on FDR (that is deducted from Running Bill and converted in to FDR for
initial SD) for One year, after completion of work. After that no further interest shall be paid for
any extended period what so ever.
If the Security Deposit is not paid within 15 days from the date of L.O.I. / Work Order than
penalty at the rate of 0.065% per day of the amount of Security Deposit will charged. If the
Security Deposit is not paid within one month with interest, necessary actions as per condition of
contract will be taken.
Initial Security Deposit ( i.e. 2% Of Tender Amount) in form of Bank Guarantee may be
accepted as per relevant tender provision, However BG shall be valid till final date of
completion of work+1year (Whether final bill is audited and paid or not). It shall be
contractor's responsibility to extent the BG On Or Before expiry of time limit of BG. In case
of late renewal of BG, penalty of security deposit shall be levied at the rate of 0.065% of per
day of BG amount.
The successful tenderer shall have to enter into an agreement on a non-judicial stamp paper
of Rs. 300/- if initial Security Deposite paid in form Bank Guarantee or Demand draft as per
the form of the agreement approved by the Municipal Corporation, Surat.
If initial Security deposit is paid in form of Fixed Deposit, additional stamp paper
amounting As per government’s prevailing rule of Security Deposit shall be used to execute
The undertaking shall be executed on stamp paper worth Rs. 300/-.
The Surety shall be executed on stamp paper worth Rs. 300/-.
GC-11 INSPECTION OF WORK :
1. The Engineer in charge will have full power and authority to inspect the work at any time
wherever in progress either on the site or at the contractor's any other manufacturers workshops
or factories wherever situated and the contractor shall afford for Engineer-in-charge every
facility and assistance to carry out such inspection. Contractor or his authorised representative
shall,at all time during the usual working hours and all other times when so notified remain
present to receive orders and instructions, orders given to Contractor's representative shall
considered to have the same force as if they had been given to the contractor himself. Contractor
shall give not less than 7 days notice in writing to the Engineer-in- charge before covering up or
otherwise placing beyond reach of inspection and measuring any work in order that the same
may be inspected and measured. In the event of breach of the above,the same shall be
recovered at Contractor's expenses for carrying out such inspection or measurment.
2. No material shall be despatched from contract store on site of work before obtaining
approval in writing of the Engineer-in-charge, Contractor shall provide at all time during the
progress of work and maintenance period proper means of access with ladders, gangways,
etc. and the necessary attendance to move and adopt as d irected for inspection or
measurement of work by Engineer-in-charge.
GC-12 DEFECT LIABILITY :
1.Contractor shall guarantee the work for a period of 12 months after Completion of Work..
Any damage or defect that may arise or that may remain undis- covered at the time of issue
of completion certificate connected in any way with the equipment or Materials supplied by
him or in the Workmanship be rectified or replaced by contractor at his own expenses as
desired by Engineer-in-charge or in default may cause the same to be made good by other agency
and deduct expenses of which the certificate of Engineer-in-charge shall be final from any sums
that may then or any time thereafter become due to contractor of sale thereof or of a
sufficient portion thereof.
2.From the commencencement to completion of work contractor shall take full responsibility
for the case of the work including all temporary works and in case any damage, loss or injury
shall happen to work or any part thereof or to any temporary works from any cause whatsoever
and shall at his own cost repair and make good the same so that at completion work shall be in
good order and in confirmity in every respect with the requirements of contract and as per the
instructions of the Engineer-in-charge.
3.If at any time before the work is taken over, the Engineer- in-charge shall -
(a) Decide that any work done or Materials used by the contractor are defective or not in
accordance with contract or that work of any portion thereof is defective or do not fulfill the
requirements of contract (all such Materials being hereinafter called defects in this clause and
(b)as soon as reasonably practicable given to contractor notice in writing of the said defect
specifying particulars of the defects alleged to exist or to have occured, then contractor shall at
his own expenses and with all speed make good the defects so specified.
(b) In case contractor fails to do so, owner may take at the cost of the contractor, such steps as
may in all circumstances,be reasonable to make good such defects. The expenditure so incurred
by S.M.C. will be recovered from the amount due to contractor.The decision of Engineer-in-
charge with regard to the amount to be recovered from contractor will be final and binding on
the contractor.
GC-13 POWER OF ENGINEER TO GIVE FURTHER INSTRUCTIONS :
The Engineer shall have the power and authority from time to time and at all times to give
further instructions and directions as may appear to him necessary or proper for the guidance
of contractor and the works and efficient execution of the works according to the terms of the
specifications, and the contractor shall receive, execute, obey and be bound by the same,
according to the true intent and meaning thereof, as fully and effectually as though the same had
accompanied or had been mentioned or referred to in the specifications. No work which
readically changes the original nature of the contract shall be ordered by the Engineer and in
the event of any deviation being ordered,which in the opinion of the contractor changes the
original nature of the contract, the shall nevertheless carry it out and any disagreement as to the
nature of the work & the rate to be paid thereof shall be resolved.The time of completion of
works, in the event of any deviations, resulting in additional cost over the contract sum being
ordered, then be extended or reduced reasonable by the Engineer. The Engineer's decision in the
case shall be final and binding.
GC-14 PROGRAMME :
The time allowed for execution of works shall be essence of the contract. The contract period shall
commence from date of Notice of intimation to proceed. The tenderer at the time of submitting his
tender shall indicate the construction or pipeline schedule, the month-wise programme required
for the execution of the works and shall confirm the same within fourteen (14) days of the
acceptance of his Tender. The contractor shall provide to the Engineer-in-charge a detailed
programme of time schedule for execution of the works in accordance with the specifications
& the completion date. The entire programme to be finalised by the Contractor,has to confirm to
the execution period mentioned alongwith the Bill of Quantities in the Tender Documents.The
Engineer upon scrutiny of such submitted programme by contractor,shall examine suitability of it
to the requirement of contract and suggest modifications, if found necessary.
GC-15 SUBLETTING OF WORKS :
No part of the contract nor any share or interest thereon shall in any manner or degree be
transferred,assigned or sublet by the contractor directly or indirectly to any firm or Corporation
whatsoever except as provided for in the succeding subclause without the consent in writing of
GC-16 SUB-CONTRACTORS FOR TEMPORARY WORKS ETC. :
The owner may give written consent to sub-contractors for execution of any part of the work
at the site being entered upon by the contractors provided each individuals contractor is
submitted to the Engineer-in-charge before being entered into and in approved by him. List of
Sub-Contractors is to be supplied. Not with standing any subletting with such approval as
aforesaid and not with standing the Engineer-in-charge shall have received copies of any sub-
contractors, the contractors shall be and shall remain solely responsible for the quality and
proper expenditions and execution of the works and the performance of all the conditions of
contract in all respects as if such submitting or sub-contracting had not taken place and as if such
work had done directly by the Contractor.
GC-17 TIME FOR COMPLETION:
1.The work covered under this contract shall be commenced from the date of contract is served
with a notice to proceed with the work and shall be completed before the date as mentioned in
the time schedule of work. The time is the essence of the contract and unless the same is extended
as mentioned in clause No. GC-18 (Extension of time) the contractor will be panalised for the
2.The general time schedule for work is given in the tender document. Contractor shall prepare
a detailed weekly or monthly programme of work in consultation with Engineer-in-charge soon
after the agreement and the work shall be strictly executed accordingly. The time for as
construction of road given includes,the time required for testing, rectification if any, retesting
and completion in all respects to the entire satisfaction of the Engineer- in-charge.
GC-18 EXTENSION OF TIME :
Time shall be considered as the essence of the contract. If however, the failure of the
Contractor to complete the work as per the stipulated dates referred to above arises from
delays on the part of Municipal Corporation in supplying the Materials of equipment it has
undertaken to supply under the contract or from delays in handing over sites or from increase in
the quantity of work to be done under the contract, or force Majeure an appropriate extension of
time will be given. The Contractor shall request such extension within one month of the cause
of such delay and in any case before expirry of the contract period.
GC-19 CONTRACT AGREEMENT :
The successful tenderer shall when called upon to do so, enter into and execute the Contract
Agreement within (15) fifteen days of the Notice of Award, in the form shown in tender
documents with such modifications as may be necessary in the opinion of the Municipal
Commissioner. It should be incumbent on the contract to pay the stamp duty and the legal
charges for the completion of the contract agreement.
GC-20A.PENALTY FOR DELAY :
If the contractor fails to complete the work within the stipulated completion date for the
work or he shall pay liquidated damages at one tenth of Two percent of contract value per day
of delay in completion and handing over the work or part thereof as the case may to the
Municipal Commissioner. The amount of liquidated damages shall, however, be subjected to a
maximum of ten (10) percent of the contract value. Delays in excess of one hundred days will be a
cause for termination of the contract and forfeiture of all security for performance.
The successful tenderer shall have to submit the progress bar-chart within fifteen days after the
contract, and the contractor should work as per the approved bar-chart, failing the contractor
shall have to pay the compensation for delay as per the decision of Municipal Commissioner.
GC-21 FORFEITURE OF SECURITY DEPOSIT :
Whenever any claim arises against the contractor for the payment of a sum of money out of or
under the contract, the owner shall be entitled to recover such sum by appropriating in part of
whole, the security deposit of the contractor. In case the Security deposit is insufficient the
balance recoverable shall be deducted from any sum then due or which at any time
thereafter may become due to the contractor shall pay to the owner on demand may balance
GC-22 ACTION OF FORFEITURE OF SECURITY DEPOSIT :
In any case in which under any clause or clauses of the contract, the contractor shall have
forfeited the whole of his Security deposit or have committed a breach of any of the terms
contained in this contract, the owner shall have power to adopt any of the following courses
as he may deem best suited to his interest -
(a) To rescind the contract (of which rescission notice in writing to the contractor under the
hand of the owner shall be conclusive evidence) in which case, the security deposit of the
contractor shall stand forfeited and be absolutely at the disposal of the owner.
(b) To employ labour and to supply Materials to carry out the balance work debiting contractor
with the cost of labour employed and the cost of Materials supplied for which a certificate of
the Engineer-in-charge shall be final and conclusive against the contractor and 10% costs on
above to cover all departmental charges and crediting him with the value of work done at the
same rates as if it has been carried out by the contractor under the terms of his contract. The
certificate of Engineer-in-charge as to the value of the work done shall be final and
conclusive against the contractor.
(c) To measure up the work of the contractor and to take such part hereof as shall be unexecuted
out of his hand to give it to another contractor to complete. In this case the excess -
expenditure incurred than what whole have been paid to the original contractor, if the would
work had been executed by him, shall be earnest and paid by the original contractor and shall
be deducted from any money due to him by the owner under the contract or otherwise and for
the excess expenditure, the certificate of the Engineer- in-charge shall be final and conclusive.
In the event any of the above course being adopted by the owner, the contractor shall have no
claim to compensation for any less sustained by him by reason of his having purchased or
procured any Materials or entered into any agree-ment so or made by advance on account of
or with a view to the execution of the work of the performance of the contract. In such case the
contractor shall not be entitled to recover or be paid by sum for any work actually performed
under this contract unless the Engineer-in-charge will certify in writing the performance of such
work and the value payable in respect thereof and the shall only be entitled to be paid the value
so certified. In the event of the owner putting in force the powers as stated in a, b, c, above vested
in him under the preceeding clause, he may, if he so desire, take possession of all or any tools
and plant, Materials and stores in or upon the work or the site thereof belonging to the
contractor, or procured by him and intended to be used for the execution of the work or any
part thereof paying or allowing for the same in account at the contract rates to be certified by
the Engineer-in-charge whose certificate thereof shall be final otherwise the Engineer-in-charge
may give notice in writing to the contractor or his representative requiring him to remove such
tools plant Materials or stores from the premises within the time specified in the notice and
in if the contractor fails to comply with any such notice, the Engineer-in-charge may remove
them at the Contractor's expenses or sell them by auction or private sale on account of the
contractor and his risks in all respects without any furhter notice as to the date, time to place
of the sale and the certificate of Engineer-in-charge as to the expenses of any such removal
and the amount of the proceeds and the expenses of any such sale shall be final and conclusive
against the contractor.
GC-23 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK :
If at any time from the commencement of work, the owner shall for any reasons whatsoever not
require the whole or part thereof a specified in the tender to be carried out, the Engineer-in-
charge shall give notice in writing of the contractor, who shall have no claim to any payment
or compensation whatsoever on account of any profit or advantage which he might have derived
from execution of work in full, but which he did not derive in consequence of the full amount
of the work not having been carried neither shall be have any claim for compensation by
reason if any alternations having been made in original specifications, drawings, designs
and instructions which shall involve any curtailment of the work as originally contemplated.
When the contractor is a partnership firm, the prior approval in writing of the S.M.C.shall be
obatined before any change is made in the constitution of the firm, where the contractor is an
individual or a Hindu Undivided Family business concern, such approval as aforesaid shall,
likewise be obtained before sub- contractor enters into any agreement with other parties
whereunder the reconstituted firm would have the right to carry out the work hereby undertaken
by the contractor. In either case if prior approval as aforesaid is not obtained, the contract shall
be deemed to have been allotted in contravention of sub- letting clause hereof and the same
action may be taken and the same consequence shall ensure as provided in the sub-letting
GC-24 IN EVENT OF DEATH OF CONTRACTOR :
Without prejudice to any of the right or remdies under the contract, if the contractor dies, the
owner shall have the option of terminating the contract without compensation to the contractor.
GC-25 MEMBER OF THE OWNER NOT INDIVIDUALLY LIABLE :
No official or employee of the owner shall in any way be personally bound or liable for the
acts or obligations of the owner under the contract or answerable for any default or ommission
in the observance or performance of the acts, matters or things which are herein contained.
GC-26 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS :
The contractor shall not be entitled to any incresse on the Schedule of rates or any other rights or
claims whatsoever by reason of representation, explanation or statement or alleged
representation, promise or guarantees given or alleged to have been given to him by any person.
GC-27 CONTRACTOR'S OFFICE AT SITE :
The Contractor shall provide and maintain an office at the site for the accommodation of his
agent and staff and such office shall be opened at all reasonable hours to receive instruc-
tions, notice or other communications.
GC-28 CONTRACTOR'S SUBORDINATE STAFF AND THEIR CONDUCT :
1. The contractor on award of the work shall name and depute a qualified Engineer having
experience of carrying out work of similar nature,to whom equipments,Materials, if, any, shall be
issued and instructions for work given.The contractor shall also provide to the satisfaction of
Engineer in-charge sufficient and qualified staff to superintend the execution of the work,
competent sub- agents, foremen and leading hands including those specially qualified by previous
expeditions to a supervise the type of works comprised in the contract in such manner as will
ensure work of the best quality and expeditions working, it, in the opinion of the Engineer-in-
charge, additional properly qualified supervision staff is considered necessary, if shall be
employed by the contractor without additional charge on account thereof. The contractor shall
ensure to the satisfaction of the Engineer- in-charge that sub - contractors, it any shall provide
competent and efficient supervision over the work entrusted to them.
2. If and whenever any of the contractor 's or sub-contractor agents, sub-agents, assistance,
formen or other employees shall, in the opinion of Engineer-in-charge, be guilty of any
misconduct or be incompetent or insufficiently qualified or inteligent in the performance of their
duties or that in opinion of the owner or Engineer-in-charge, it is undesirable for administrative or
any other reason for person or persons to be employed in the works, the contractor, if so directed
by the Engineer-in-charge, shall at once remove person or persons from employment thereon.
Any person or persons so removed shall not again be remployed in connection with the works
without the written permission of the Engineer-in- charge. Any person so removed from the
works shall be immediately replaced at the expenses of the contractor by acqualified and
competent substitute. Should the contractor be required to repatriate any person removed from
the works he shall do so and shall bear all costs in connection therewith.
3. The contractor shall be responsible for the proper behaviour of all the staff, foremen, workmen
and others shall exercise proper control over them and in particular and without prejudice to
the same. Generally, the contractor shall be bound to prohi-bit,and prevent any employee from
trespassing or acting in any way detrimental or prejudicial to the interest of the community or of
the properties or occupiers of land and properties in the neigh-bourhood and in the event of
such employees so trespassing, the contractor shall be responsible therefore and relieve the
owner of all consequent claims, actions for damages or injury or any other grounds
whatsoever. The decision of the Engineer-in- charge upon any matter arising under this clause
shall be final.
4. If and required by the owner, the contractor's personnel entering upon the owner's
premises shall be properly identified by badges of a type acceptable to the S.M.C. which
must be worn at all times on owner's premises.
GC-29 TERMINATION OF SUB-CONTRACTOR BY OWNER :
If any sub-contractor engaged upon the works at the site executes any work which in the
opinion of Engineer-in-charge is not in accordance with the contract documents, the S.M.C.
may be give written notice to the contractor request his to terminate such sub-contract and the
contractor upon the receipt of such notice shall terminate such sub-contract and the letter shall
forthwith leave the works failing which the owner shall have the right to remove such sub-
contractors from the site.
No action taken by the owner under the above clause shall relieve the contractor of his
liabilities under the contract or give rise to any right to compensa-tion, extension of time or
GC-30 POWER OF ENTRY :
If the contractor shall not commence the work in the manner previously described in the
contract documents or if he shall, at any time, in the opinion of Engineer-in-charge.
(i) Fail to carry out works in conformity with the documents or
(ii) Fail to carry out the works in accordance with the time schedule.
(iii) Substantially suspend work or the works for a period of fourteen days without authority
from Engineer-in-charge or
(iv) Fail to carry out and execute the work to the satisfaction of the Engineer-in-charge or
(v) Fail to supply sufficient or suitable construc-tion plant temporary works, labour Materials or
(vi) Commit breach of any other provisions of the contract on his part to be performed or
observed or persist in any of the above mentioned breached of the contract for fourteen days after
notice in writing shall have been given to the contractor by the Engineer-in-charge requiring such
breach to be remedied or
(vii) Abandon the work or
(viii) During the continuance of the contract becomes bankrupt, make any arrangement or
compromise with his creditors, or permit any execution to be levied or go into liquidation
whether compulsory or voluntary not being merly a voluntary liquidation for the purpose
of amalgamation or reconstruction then in any such case.
The owner shall have the power to enter upon the works and take possession thereof and of the
Materials, temporary works, constructional plant and stock therein, and to revoke the
contractor's licence to use the same and to complete the works by his agents, other contractor or
workman or to relate the same upon any terms and to such other person, firm or corporation as
the owner in his absolute discretion may think proper to employ, and for the purpose aforesaid to
use or authorise the use of any Materials, temporary works, constructional plant, and stock as
aforesaid, without making payment or allowance to the Contractor for the said Materials other
than such as may be certified in written by the Engineer-in-charge to be reasonable and without
making any payment or allowance to the contractor for the use of said temporary works,
constructional plant and stock or being liable for any less or damage thereto. If the owner shall
be reason of his taking possession of the works or of the work being got completed by other
contractor incur excess certified by the Engineer-in-charge shall be deducted from any money
which may be due for the work done by the contractor under the contract and not paid for.
Any deficiency shall fortwith be made good and paid to the owner by the contractor and the owner
shall have power to sell in such manner and for such price as he may think fit all or any of the
constructional plant, Materials etc. constructed by or belonging to and recoup and retain the said
deficiency or any part thereof out of the proceeds of the sale.
GC-31 CONTRACTOR'S RESPONSIBLITY WITH THE OTHER CONTRACTOR &
Without repugnance to any other condition, it shall be the responsibility of the contractor
executing the work of civil construction to work in close co-operation and co-ordinate the work
with other contractors or their authorised represaentative and the contractor will put a joint
scheme with the concurrence of other contractors showing the arrange-ments for carrying his
portion of the work to the Engineer-in-charge and get the approval. The Engineer-in-charge
before approving the joint scheme will call the parties concerned and modify the scheme if
required. No claim will be entertained on account of the above. The contractor shall conform
in all respects with the provisions of any statutory regulations, ordinances or by laws of any
local or locally consitituted authorities or public bodies which may be applicable from time to
time to works or any temporary works. The contractor shall keep the owner indemnified
against all penalties and liabilities of every kind arising out of non-adherence to such statutes,
ordinanace, laws, rules, regulations, etc.
GC-32 OTHER AGENCIES AT SITE :
The Contractor shall have to execute the work in such place and condition where other agencies
will also be engaged for other works, such as site grading, filling and levelling, electrical and
mechanical engineering works, etc. No claim shall be entertained for works being executed in
the above circumstances.
GC-33 NOTICES :
Any notice under this contract may be served on the contractor or his duly authorised
representative at the job site or may be served by registered post direct to the official address of
the contractor proof of issue of any such notice could be conclusive of the contractor having
been duly informed of all contents therein.
GC-34 RIGHT OF VARIOUS INTERESTS :
The owner reserves the right to distribute the work between more than one contractor. Contractor
shall co-operate and afford reasonable opportunity to other contractors for access to the works
for the carriage and storage of Materials and execution of their works.
Wherever the work being done by any department of the owner or by other contractor
employed by the owner is contingent upon work covered by this contract, the respective rights of
the various interests shall be determined by Engineer-in-charge to secure the completion of
various portions of the work in general harmoney.
GC-35 PRICE ADJUSTMENT :
No adjustment in price shall be allowed as the time limit for completion of the project is less than
GC-36 TERMS OF PAYMENT :
The payment of Bills shall be made progressively according to the rules and practice followed
by the Municipal Corporation. The progressive payment unless otherwise provided in the
Contract Agreement or sub-sequently agreed to by the parties, shall be made generally monthly
on submission of a bill by the Contractor in prescribed form in an amount according to the
value of the work performed less the aggregate of previous progressive payments and as
required by clause GC-37 (Retention money) herein. All such progressive payment shall be
regarded as payment by way of advance against final payment.
Payment for the work done by the contractor will be based on the measurement at various
stages of the work, in accordance with the conditions at Clause GC-77 (Measurement of Work
GC-37 RETENTION MONEY :
Pursuant to Clause GC-36 Terms of Payment on all money due to the contractor for work done,
Municipal Corporation will hold as retention money of Five percent (5%) of the value of
work. The retention money will not normally be due for payment until the completion of the
entire work and till such period the work has been finally accepted by the Municipal Corporation
and completion certificate issued by the Municipal Corporation in pursuant to Clause No.GC-83
(Completion Certificate).
However, after the assurance of completion certificate, and Municipal Commissioner may at
its own discreation and having considered the Contractor's performance and diligence during the
contract time allow the retention money to converted into a Bond as stipulated in the Clause GC-
10 (Performance Bond Security Deposit).
GC-38 PAYMENT DUE FROM THE CONTRACTOR :
All costs, damages or expenses, for which under the Contract the Contractor is liable to the
Municipal Corporation deducted by the Municipal Corporation from any money due or becoming
due to the Contractor under the contract or from any other contract with the Municipal
Corporation or may be recovered by action at law or other-wise from the Contractor.
GC-39 CONTINGENT FEE :
1.The Contractor warrants that he has not employed any person to solicit or secure the contract
upon any agreement for a commission, percentage, brokerage or contingent fee. Breach of this
warranty shall give the Municipal Commissioner the right to cancel the contract or to take any
other measure as the Municipal Commissioner may deem fit. The warranty does not apply to
commissions payable by the contractor to establish commercial or selling agent for the
purpose of securing business.
2.No officer, employer of the Municipal Corporation be admitted to any share or part of this
contract or to any benefit that may rise therefrom.
GC-40 BREACH OF CONTRACT BY CONTRACTOR :
If the contractor fails to perform the work under the contract with due diligence or shall refuse
or neglect to comply with instruction given to him by the Engineer-in-charge in accordance with
the contract, or shall contravence the provisions of the contract, the S.M.C. may give notice in
writing to the contractor to make good such failure, neglect or contravention. Should the
Contractor fail to comply with such written notice within twenty eight (28) days of receipt, if the
Municipal Commissioner shall think fit, it shall be lawful for the Municipal Corporation,
without prejudice to any other rights, the contractor may have under the contract, to terminate the
contract for all or part of the works, and to make any other arrangements it shall deem
necessary to complete the work outstanding under the contract at the time of termination. In this
event Article GC-15 (Subletting of work)and GC-16 (Sub-Contracts for Temporary Works
etc.)hereof shall be invoked and the performance Bond shall immediately become due and
payable to the Municipal Commissioner the value of the work done on the date of termination
and not paid for shall stand forfeited to the Municipal Corporation and the Municipal
Corporation shall have free use of any works which the contractor may have at the site at the
time of termination of the contract.
GC-41 DEFAULT OF CONTRACTOR :
1. The Municipal Corporation may upon written notice of default to the contractor terminate the
contract in circumstance detailed hereunder :
(a) If in the judgement of the Municipal Corporation the contractor fails to make completion
of works within the time specified in the completion schedule or within the period for which
extension has been granted by the Municipal Corporation /Engineer to the Contractor.
(b) If in the judgement of the Municipal Corporation the contractor fails to comply with any of the
provisions of this contract.
2. In the event the Municipal Commissioner terminates the contract inwhole or in part as
provided in Article GC-48 (Termination of Contract), the Municipal Corporation reserves the
right to perchase upon such terms and in such manner as it may deem appropriate, plant similar to
that terminated and the contractor will be liable to the Municipal Corporation for any additional
costs for such similar and / or for liquidated damaged for delay until such resonable time as may
be required for the final completion of works.
3. If this contract is terminated as provided in this paragraph GC - 30 (Power of entry)
(1) the Municipal Corporation in addition to any other rights provided in this clause, may
require the Contractor to transfer title and deliver to the Municipal Corporation under any of
the following cases in the manual and as directed by the Municipal Corporation. (a) Any
partially completed information and contract rights as the contractor has specifically produced or
acquired for the performance of the contract so termi-nated.
4. In the event the Municipal Corporation does not terminate the contract as provided in the
paragraph GC- 48 (Termination of Contract) the Contractor shall continue performance of the
contract, in which case the shall be liable to the Municipal Corporation for liquidated damages
for delay until the works are accepted.
GC-42 BANKRUPTCY :
If the Contractor shall become bank rupt or insolvent or have a receiving order made against
him, or compound with the creditors, or being the Municipal Corporation commence to be
wound up, not being a member's Voluntary winding up for the purpose of amalgamation or
reconstruction, or carry on its business under a receiver for the benefit of his creditors or
any of them, the owner shall be at liberty to either (a) terminate the contract forthwith by
giving notice in writing to the contractor or to the receiver or liquidator or to any person or
organisation in whom the contract may become vested and to act in the manner provided in
Article GC-41 (Default of Contractor) as though the last mentioned notice had been the notice
referred to in such Article of (b) to give such receiver liquidator or other person in work the
contract may become vested the option of carrying out the contract subject to his providing a
satisfactory guarantee for the due and faithfully performance of the contract subject to his
providing a satisfactory guarantee for the due and faithfull performance of the contract upto an
amount to be agreed. In the event that the Municipal Corporation terminates the Contract in
accordance with this article, the performance Bond shall immediately become due and
payable on demand to Municipal Corporation.
GC-43 OWNERSHIP :
Works supplied pursuant to the Contract shall become the property of the Municipal
Corporation from whichever is the earlier of the following times, namely,
(a) When the works are completed pursuant to the Contract.
(b) When the Contractor has been paid any sum to which he may become entitled in respect
thereof pursuant to clause GC-36 (Terms of Payment).
GC-44 DECLARATION AGAINST WAIVER :
The condonation by the Municipal Corporation of any breach of brenches by the stipulations
and conditions contained in the contract shall in no way prejudice or effect to the constructed as a
waiver of the Municipal Corporation rights, powers and remidies under the contract in
respect of any breach or breaches.
GC-45 LAWS GOVERNING THE CONTRACT :
The contract shall be constitued according to and Subject to the laws of India and the State
of Gujarat and under the jurisdiction of the courts of Gujarat at Surat.
GC-46 OVERPAYMENT AND UNDERPAYMENT :
Whenever any claim forths payment of a sum to the Municipal Corporation arises out of or
under this Contract against the contractor the same may be deducted by the Municipal
Corporation from any sum then due or which at any time thereafter may become due to the
contractor under this contract and failing that under any other contract with the Municipal
Corporation or from any sum due to the contractor with the Municipal Corporation (which may
be available with Municipal Corporation), or from his retention money, or he shall pay the
claim on demand. The Municipal Corporation reserves the right to carry out post payment
audit and technical examination of the final bill including all supporting vouchers, abstracts,
The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected no withstanding the fact that the amount of the final bill may be included by the
It as a result of such audit and technical examination any over payment is discovered in respect
of any work done by the Contractor or alleged to have been done by him under the contract,
it shall be recovered by the Municipal Corporation from the contractor by way of all the
means prescribed above or if any under payment is discovered by the Municipal Corporation,
any amount due to the contractor under this contract or under payment may be adjusted against
any amount then due or which may at any time thereafter become due before payment is made
to the contractor from him to the Municipal Corporation on any other contract account
GC-47 SETTLEMENT OF DISPUTES :
Except or otherwise specifically provided in the contract, all disputes concerning questions of
fact arising under the contract shall be decided by the Commissioner,subject to a written appear
by the Contractor to the Commissioner, and these decisions shall be final and binding to the
GC-48 TERMINATION OF THE CONTRACT:
1.If the Contractor finds it impracticable to continue operation owing to Force Majeure reasons
or for any reason beyond his and/or the Municipal Commissioner find site impossible to
continue operation when prompt notification in writing shall be given by the party affected to the
2.If the delay or difficulties so caused can not be expected to cease or become unavoidable or
if operations can not be resumed within six (6) months the party shall have the right to terminate
the contract upon Ten (10) days written notice to the other. In the event of such termination of
the contract, payment to the Contractor will be made as follows :
a) The Contractor shall be paid for all works approved by the Engineer and for any other
legitimate expenses due to him.
b) If the Municipal Commissioner terminates the contract owing to Force Majeure or due to any
cause beyond its control, the contractor shall additionally be paid for any work done during the
said Six (6) months period including any financial commitment made for the proper
performance of the Contract and which are not reasonable defrayed by payment under (a) above;
c) The Municipal Commissioner also release all bonds and guarantees at its disposal except is
cause where the total amount of payments made to the contractor exceeds the final amount due to
cause where the total amount of payments made to the contractor exceeds the final amount due to
him in which case the contractor shall refund the excess amount within Sixty (60) days after
termination and the Municipal Commissioner thereafter shall release all bonds and guarantees,
should the contractor fail to refund the amount received in excess within the said period such
amounts shall be deducted from the bonds or guarantees provided.
3. On the termination of the contract for any cause the contractor shall see the orderly
suspension and termination of operations, with due consideration to the interests of the
Municipal Corporation with respect to completion, safeguarding or storing of Materials procured
for the performance of the contract and the salvage and resale thereof.
GC-49 CHANGES IN CONSTITUTION :
Where the contractor is a partnership firm, the prior approval in writing of the Municipal
Commissioner shall
be obtained any change is made in the constitution of the firm. Where the contractor is an
individual or an undivided family business concern such approval as aforesaid shall like wise
be obtained before the contractor enters into any partnership agreement whereunder the
partnership firm would have the right to carry out the works hereby undertaken by the contractor.
If prior approval as aforesaid is not obtained the contract shall be deemed to have been assigned in
contravention of Article thereof.
GC-50 SUB-CONTRACTUAL RELATIONS :
All work performed for the contract by sub-contractor shall be pursuant to an appropriate
agreement between the contractor and sub-contractor which shall contain provisions to :
a) Protect and preserve the rights of the Municipal Corporation and the Engineer with
respect to the work to be performed under the sub-contract so that the sub-contractor thereof will
not prejudice such rights.
b) Require that such work be performed in accordance with requirements of the Contract
c) Require under such contract of which the contractor is a party, the submission to the
contractor of application for payment and claims for additional costs, extension of time,
damages for delay or otherwise with respect to the sub- contracted portions of the work
in sufficient time, that the contractor may apply for payment and comply in accordance with
the contract Documents for like claim by the Contractor upon the Municipal Corporation.
d) Waive all rights the contracting parties may have against one another for damages caused
by fire or other perils covered by the property insurance except such rights as they may have
to the proceeds so such insurance held by the Municipal Corporation as trustee and,
e) Obligate each sub-contractor specifically to consent to the provisions of this Article.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of
any payment then due or thereafter to become due an amount sufficient to completely
indemnify the owner against such lien or claim or if such lien or claim be valid the owner may
be or become due and payable to the contractor. If any lien or claims remaining, unsettled after
all payments are made, the contractor shall refund or pay to the owner all money that the latter
may be compelled to pay in discharging such lien or claim including all cost and reasonable
GC-52 EXECUTION OF WORK :
The whole work shall be carried out in strict conformity with the provisions of the Contract
Documents, detailed drawings, specifications and the instructions of the Engineer-in-charge
from time to time. The Contractor shall ensure that the whole work is executed in the most
substantial, proper and best Workmanship using Materials of best quality in strict accordance
with the specifications to the entire satisfaction of the Engineer-in- charge.
GC-53 WORK IN MONSOON :
When the work continues in monsoon, the contractor shall maintain minimum labour force
required, for the work and plan and execute the construction and erection work according to the
prescribed schedule. No extra rate will be considered for such work in monsoon. During
monsoon and entire constructing period the contractor shall keep the site free from water at his
GC-54 WORK CLOSED ON SUNDAYS & HOLIDAYS & BETWEEN SUNSET AND
No work shall be carriedout on Sundays and Corporation Holidays and no work shall be
carried out between sunset and sunrise. Except with the special permission of Engineer-in-
charge in writing perviously obtained and with holding such permissions shall be no ground of
complaint on the part of contractor or cause for compensation to them. Working period shall
be maximum eight (8) hours per days.
GC-55 EXTRA SUPERVISION CHARGES TO BE BORNE BY CONTRACTOR :
Further to clause No.GC-54 when Engineer-in-charge feels necessary to give permission to
contractor for carrying out work for period of more than Eight hours working period in a day
and/or to continue work on sunday and Corporation holidays. Extra Supervision charges arising
due to overtime working of Corporation's staff shall be borne by the contractor at prevailing
rates from time to time. Such extra supervision charges shall be deducted by Corporation from
the running bill/s of the contractor at Surat Municipal Corporation's description.
GC-56 DRAWING TO BE SUPPLIED BY THE OWNER :
The drawings attached with the tender documents shall be for general guidance of the
contractor to enable him to visualize the type of work contemplated and scope of work involved.
Detailed working drawings according to which the work is to be done shall be furnished from
time to time as the work progresses. The contractor shall study the drawings thoroughly in
connection with other connected details and discrepancy if any bring to the notice of the
Engineer-in-charge before actually carrying out the work.
GC-57 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR :
Where drawings, date are to be furnished by the contractor they shall be as enumerated in special
condition of contract and shall be furnished within the specified time. Where approval of
drawings has been specified it shall be the Contractor's responsibility to have these drawings
got approved before any work is taken up with regard to the same. Any changes becoming
necessary in these drawings during the execution of the work shall have to be carried out by the
contractor at no extra cost. All final drawings shall bear the certification stamp as indicated below
duly signed by both the contractor and Engineer- in-charge.
"Certified true for ___________________________________project Agreement
____________________ Contractor Engineer-in-charge Drawings will be approved within three
(3) weeks of the receipt of the same by the Engineer-in-charge.
GC-58 SETTING OUT WORK :
The contractor shall set out the work on the site handed by the Engineer-in-charge and shall be
responsible for the correctness of the same. The work shall be carried out to the entire
satisfaction of Engineer-in-charge. The approval thereof or partaking by Engineer-in-charge in
setting out work shall not relieve contractor of any of his responsibilities.
The contractor shall provide at his own cost all necessary level posts, pegs, bamboos, flage,
ranging, rods, strings and other Materials and labourers required for proper setting out of the
work. The Contractor shall provide, fix and be responsible for the maintenance of all stakes,
temples level marks profiles and similar other things and shall take and necessary precautions to
prevent their removal or disturbance and shall be responsible for the conse-quence for such
removal or disturbance. The contractor shall also be responsible for the maintenance of all
existing Survey Marks, Boundary Marks, Distance Marks and Centre line marks either
existing or fixed by the Contractor. The Centre, longitudinal or face lines and cross lines shall
be marked by small masonary pillars. Each pillar shall have distance mark at the centre for
setting up the theodolite. The work shall not be started unless the setting out is checked by
Engineer-in-charge in writing but such approval shall not relive the contractor of his
responsibilities. The contractor shall provide all Materials, labour and other facilities necessary
for checking at his own cost.
Pillars bearing geodetic marks on site shall be protected by the Contractor. On completion of the
work the contractor shall submit the Geodetic documents according to which the work has
been carried out.
GC-59 RESPONSIBILITIES OF CONTRACTOR FOR CORRECTTNESS OF WORK:
The contractor shall be entirely and exclusively responsible for the correctness of every part of
the work and shall rectify completely and errors thereon at his own cost when so instructed by
Engineer-in-charge.
1. Materials to be supplied by Contractor :
Contractor shall procure and provide all the Materials required for the execution and
maintenance of work
including M.S. rods, all tools, tackle, construction plant and equipment except the Materials to be
supplied by the owner detailed in the contract documents and for the transport thereof, owner,
shall made recommendations to the respective authorities if designed by the contractor but
assumes no responsibility or any nature. Owner shall insist for procurement of Materials with
ISI Marks supplied by reputed firms on the DGS & D List. 2. If however the Engineer-in-charge
feels that work is likely to be delayed due to contractor's inability to procure the Materials, the
Engineer-in-charge shall have the right to procure Materials from the market and the contractor
will accept these Materials at the rates decided by Engineer-in-charge
GC-60 MATERIALS TO BE SUPPLIED BY THE OWNER :
1.If the contract provides certain Materials or stores to be supplied by the S.M.C. such
Materials and stores shall be transported by the contractor at his cost from S.M.C's stores or
Railway Station. The sum due from contractor for the value of Materials supplied by the owner
will be recovered from the R.A.Bill on the basis of actual consumption of Materials in the work
covered and for which R.A.Bill has been prepared. After completion of the work contract has to
account for the full quantity of Materials supplied to him.
2.The value of store Materials supplied by the S.M.C. to the contract shall be charged at rates
shown in the contract document and in case any other material not listed in the schedule of
Materials is supplied by the S.M.C., the same shall be charged at cost price including carting
and other expenses inclurred in procuring the smae. All Materials so supplied shall remain the
property of the owner and shall not be removed from the site on any account.Any material
remaining un-used at the time of completion of work or termination of contract shall be
returned to S.M.C.'s store or any other place as directed by the Engineer-in-charge in perfectly
good condition at contractor's cost. When Materials are supplied free of cost for us in work and
surplus and unaccounted balances thereof are not returned to the Municipal Corporation,
recovery in respect of such balance will be effected at double the applicable issue rate of the
Materials or the market rate whichever is higher.
GC-61 CONDITIONS OF ISSUE OF MATERIALS BY THE S.M.C.:
a)The Materials specified to be issued by the S.M.C. to the contractor shall be issued by the
S.M.C.'s store or at Railway Station and all expenses for its shifting to site shall be borne by
the contractor. The Materials will be issued during working hours and as per rules of S.M.C. from
b)Contractor shall bear all expenses for storage and safe custody at site of Materials issued to
him before use in work.
c)Material shall be issued by the S.M.C.in Standard/non-standard sizes as obatined from
d)Contractor shall construct suitable godowns at site for storing the Materials to proect the
same from damage due to rain, dampness, fires, theft etc.
e) The contractor should take the delivery of the Materials issued by the S.M.C. after
satisfying himself that they are in good conditions. Once the Materials are issued, it will be the
responsibility of the Contractor to keep them in good condition and in safe custody. If the
Materials get damaged or if they are stolen, it shall be the responsibility of the contractor to
replace them at his according to the instruc- tions of the Engineer-in-charge.
f) For delay in supply or for non supply of Materials to be supplied by the S.M.C., on account
of natural calamities, act of enemies, other difficulties beyond the control of the S.M.C., the
S.M.C. carries non-responsibilities. In no case the contractor shall be entitled to claim any
compensation for loss suffered by him on this account.
g) None of the Materials issued to the contractor, shall be used by the Contractor for
manufacturing items which can be obtained from manufacturer. The Materials issued by the
owner shall be used for the work only and no other purpose.
h) Contractor shall be required to execute indemnity bond in the prescribed form for the same
custody and account of Materials issued by the owner.
i) Contractor shall furnish sufficiently in advance a Statement of his requirements of quantities
of Materials to be supplied by the S.M.C. and the time when the same will be required for the
work, so as to enable Engineer-in-
charge to make arrange-ments to procure and supply the Materials.
j) A daily account of Materials issued by the owner shall be maintained by the Contractor
showing receipt, consumption and balance in head in the form laid down by Engineer-in-charge
with all connected paper and shall be always available for inspection in the site office. k)
Contractor shall see that only the required quantities of Materials are got issued and no more.
The contractor shall be responsible to return the surplus Materials in good condition at
S.M.C.'s store at his own cost.
GC-62 MATERIALS PROCURED WITH ASSISTANCE OF THE OWNER :
Notwithstanding anything contained to the contrary in any of the clauses of this contract, where
any Materials for the execution of the contract are procured with the assistance of the S.M.C.
either by issue from S.M.C. stock or purchase made under orders or permits or licences issued
by the Government, the contractor shall hold the same Materials as trustees for owner and use
such Materials economically and solely for the purpose of contract and not dispose them off
without the permission of S.M.C.and return, iif required by Engineer-in-charge, all surplus or
unserviceable Materials that may be left with him after the completion of the contract or at its
termination for any reason whatsoever on his being paid or credited such prices as Engineer-in-
charge shall determine having due regard to the conditions of the Materials. The price allowed
to contractor shall not exceed the amount charged to him excluding the storage charges if
any. The decision of Engineer-in-charge shall be final and conclusive in such matters. In the
event of breach of the aforesaid condition, the contractor shall in terms of licence of permits
and/or for criminal breach of trust be liable to compensateS.M.C. at double rate or any higher
rates.In the event of these Materials at that time having higher rate or not being available in the
market then any other rate to be determined by the Engineer-in-charge and his decision shall be
final and conclusive.
GC-63 MATERIALS OBTAINED FROM DISMANTLING :
If the contractor, in the course of execution of work is called upon to dismantle any part for
reasons other than on account of bad or imperfect work, the Materials obtained from dismantling
will be the property of the S.M.C. and will be disposed of as per instruction of Engineer-in-
charge in the best interest of the S.M.C.
GC-64 ARTICLE OF VALUE OR TREASURE FOUND DURING CONSTRUCTION:
All gold, silver and other minerals of any discription and all previous stones, coins, treasures,
relics, antiquities and other similar things which shall be found in under or upon site shall be the
property of the owner and the contractor shall property preserve the same to the satisfaction of
Engineer-in-charge and shall hand over the same to the owner.
GC-65 DISCREPANCIES BETWEEN INSTRUCTIONS :
If there is any discrepancy between the various stipulations of the contract documents of
instructions to the contractor or his authorised representative or if any doubt arises as in the
meaning of such stipulation or instructions, the contractor shall immediately refer in writing to
the Engineer-in-charge whose decision shall be final and conclusive and no claim for losses
caused by such discrepancy,shall in any event be admissible.
Incase there is any descripancy in measurements shownin drawinge and specifications, the same
shown in drawing shall be considered as final and will be binding upon the contractor.
GC-66 SCHEDULE OF QUANTITIES AND EXTRA ITEMS :
A.Schedule of Quantities :
Variations in the quantities of work in schedule of quantities shall not vitiate the contract. The
rates quoted for the individual items shall apply for the quantities of work increased or
decreased by not more than twenty percent for each of the items, should the quantities of work
actually involved under any item very by more than twenty (20%)percent, the rate for such item
of work shall be revised in accordance with the procedures indicated under clause "Extra
Items". The payment for the items will, however, continue to be at the original rate till the revised
B.Extra Items :
Extra Items of work shall not vitiate the contract. The contractor shall be bound to
execute extra items of work as directed by the Engineer-in-charge. The rates for extra
items shall be derived from the S.O.R.(R&B Division) Year 2023-2024 and quoted premium
of tender. If the rate of extra item is not available in S.O.R. it will be derived on prevailing
GC-67 ACTION WHEN NO SPECIFICATION IS ISSUED :
In case of any class of work for which no specification is supplied by the S.M.C. in the
tender documents,such work shall be carried out in accordance with I.S.S. do not cover the same,
the work should be carried out as per standard Engineering practice subject to the approval of
Engineer-in- charge.
GC-68 ABNORMAL RATES :
Contractor is expected to quote rate for each item after careful analysis of cost involved for the
performance of the completed item considering all specifications and conditions of contract.
This will avoid loss of profit or gain in case of curtailment or change or specification for any
item. In case it is notice that the rates quoted by a tenderer for any item is usually high or
unusually low, it will be sufficient cause for rejection of tender unless the S.M.C. is
convinced about the reasonableness of the rates on scrutiny of the analysis for such rate to the
furnish-ing by the tenderer or demand.
GC-69 ASSISTANCE TO ENGINEER-IN-CHARGE :
Contractor shall make available to Engineer-in-charge free of cost all necessary instruments and
assistance in checking of any work made by the contractor for taking measurement of work.
GC-70 TEST OF QUALITY OF WORK :
1.All Workmanship shall be of the best kind described in the contract document and in
accordance with the instructions of Engineer-in-charge and shall be subjected from time to time
to such test at contractor's cost as the Engineer-in-charge may directed at the place of
manufacture of fabrication or on site or at any such place.Contractor shall provide assistance,
instruments labour and Materials as are normally required for examining measuring and testing
any work Workmanship as may be selected and required by Engineer-in-charge.
2. All tests will be necessary in connection with the execution of work as decided by Engineer-
in-charge shall be carried out at an approved laboratory at contractor's cost.
3. The contractor shall furnish to Engineer - in - charge for approval when requested or if
required by the specification adequate samples of all Materials and finished goods to be used
in work and sufficiently in advance to permit test and examination thereof. All Materials
furnished and finished goods applied in work shall be exactly as per the approved samples.
4. All the testing charges shall be borne by the Contractor.
GC-71 ACTION AND COMPENSATION IN CASE OF BAD WORKMANSHIP :
If it shall appear to the Engineer-in-charge that any work has been executed with Materials of
inferior description, or quality or are unsound or with unsound imperfect or unskilled
Workmanship or otherwise not in accordance with the contractor shall, no demand in writing
from Engineer-in-charge or his authorised representative specifying the work, Materials or
articles compained of, notwithstanding that the same may have been inadvertantly passed,
certified and paid for forthwith rectify or remove and reconstruct the work, specified and in the
event of failure to do so within a period to be specified by Engineer- in-charge in his aforesaid
demand, contractor shall be liable to pay compensation at the rate of one (1) percent of the
tendered cost of work for every Ten (10) days limited to a maximum of Ten (10%) Percent of the
value of work while his failure to do so continue and in the case of any such failure the
Engineer-in- charge may on expiry of the notice period rectify and remove and re-execut the
work or remove and replace with other at the risk and cost of the Contractor. The decision of
the Engineer-in- charge as to any question arising under this clause shall be final and
GC-72 SUSPENSION OF WORK :
Contractor shall, if ordered in writing by Engineer-in-charge or his representative temporarily
suspended the work or any part thereof for such time (not exceeding two months) as ordered
and shall not after receiving such written order proceed with the work until he shall have
received a written order to proceed therewith the contractor shall not be entitled to claim
compensa- tion for any loss or damage sustained by him by reason of temporary suspension
of work as aforesaid. An extention of time for completion of work will be granted to the
contractor corresponding to the delay caused by such suspension of work if the applied for the
same provided the suspension was not conse- quent upon any default or failure on the part of the
GC-73 OWNER MAY DO PART OF THE WORK :
When the contractor fails to comply with any instructions given in accordance with the
provisions of this contract,the S.M.C. has the right to carry out such parts of work as the
S.M.C. may designate whether by purchasing Materials and engaging labour or by the agency of
another contractor. In such case the S.M.C.shall deduct from the amount which otherwise might
become due to contractor the cost of such work and Materials with Ten (10%) percent added
to cover all departmental charges and should the total amount thereof exceed the amount due
to cover all departmental charges and should the total amount thereof exceed the amount due
to contractor, contractor shall pay the difference to S.M.C.
GC-74 POSSESSION PRIOR TO COMPLETION :
The Engineer-in-charge shall have the right to take possession of or to use any completed or
partly completed work or part of work, such possession or use shall not be deemed to be an
acceptance of any work completed in accordance with the contractor. If such prior
possession or use by Engineer-in- charge delays the progress of work, equitable adjustment in
the time of completion will be made and the contract shall be deemed to be modified accordingly.
GC-75 COMPLETION CERTIFICATE :
As soon as the work has been completed in accordance with contract (except in minor
respect that do not effect their use for the purpose for which they are intended and except for
maintenance thereof) as per general conditions of contract and has passed the tests on
completion, the Engineer-in-charge shall issue a certificate (hereinafter called completion
certificate) in which he shall certify the date on which work has been completed and has
passed the said tests and S.M.C. shall be deemed to have taken over work on the date so
certified. If work has been divided in various groups in contract, S.M.C. shall be entitled to take
over any group or groups before the other or others and there-upon the Engineer-in-charge
will issue a completion certificate which will, however, be for such group or groups so taken
over only. In order that contractor could obtain a completion certificate, he shall made good,
with all speed any defect arising from the defective materials supplied by contractor or
workmanship or any act or commission of contract that may have been discovered or
developed after the work or group of works has been taken over. The period allowed for
carrying out such work will be normally, one month. If any defect be not remedied within a
reasonable time, S.M.C. may proceed to do work at contractor's risk and expenses and deduct
from the final bill such amount as may be decided by S.M.C. If by reason of any default on the
part of the contractor, a completion certificate has not been issued in respect of every portion of
work within one month after the date fixed by contractor for completion of work, S.M.C. shall
be at liberty to use work or any portion thereof in respect of which a completion-certificate has
been issued, provided that work or the portion thereof so used as aforesaid shall be afforded
reasonable opportunity for completion of this work for the issue of completion certificate.
GC-76 SCHEDULE OF RATES :
1. The price/rates quoted by the contractor shall be remain firm till the issue of finalcertificate and
shall be subject to price ADJUSTMENT CLAUSE GC-35. Schedule of rates shall be deemed
to include and cover all costs expenses and liabilities of every description and all risks of every
kind to be taken in executing, completing and handling overwork to owner by contractor.
Contractor shall be deemed to have known the nature, scope, magnitude and the extent of work
and Materials required through contract documents may not fully and precisely furnish them.
He shall make such provision in the schedule of rates as he may consider necessary to cover the
cost of such items of work and Materials as may bereasonable and necessary to completion work.
The opinion of Engineer-in-charge as to the item of work shall be final and binding on
Contractor although the same may be not shown on or described specifically in contract
2. The Schedule of rates shall be deemed to include and cover the cost of all constructional plant,
temporary work, pumps, Materials, labour and all other Materials in connection with each item
in schedule of rates and the execution of work or any portion thereof furnished complete in
every respect and maintained as shown or described in the contract document or as may be
ordered in writing during the continuance of the contract.
3. The Schedule of rates shall be deemed to include and cover the cost of all royalties and free for
the articles and processes, protected by letters patent or otherwise incorporated in or used in
connection with work, also all royalities, and other payments in connection with Materials of
whatsoever kind for work and shall include an indemnity to-owner which contractor hereby gives
against all action, proceeding, claims, damages, costs and expenses arising from the incorporation
in use of work of any such articles, processes or Materials. Octroi of other Municipal or Local
Board charges if levied on Materials equipment of machineries to be brought to site for use on
work shall be borne by the contractor.
4. No exemption or reduction of custom duties excise duties, sales-tax or any other taxes or
charges of the Central or State Government any local body whatsoever will be granted to
obtained. All of such expenses shall be deemed to have been included in and covered by schedule
of rates. Contractor will also obtained and pay for all permits or other privileges necessary to
5. The schedule of rates shall be deemed to include and cover risk on account of delay or
intereference with contractor's conduct of work which may occure from any cause including
orders of S.M.C. in the exercise of his power and no account of extension of time granted due to
various reasons.
6. For work under unit rate basis no alteration will be allowed in the schedule of rates by reason
of work or any part of them being field, altered extended, diminished or ommitted.
GC-77 PROCEDURE FOR MEASUREMENT OF WORK IN PROGRESS :
1. All measurements shall be in metric system. All the work in progress will be jointly
measured by the representative of Engineer-in-charge and contractor's authorised agent. Such
measurements will be got recorded in the measurement book by the Engineer or his authorised
representative and signed by contractor or his authorised agent in token of acceptance. If the
contract or his authorised agent fails to be present when even required by the Engineer-in-
charge for taking measurements for any reasons whatsoever, the measurement will be taken by
the Engineer - in - charge or his authorised representative not withstanding the absence of
contract and these measurement will be deemed to be correct and binding on contractor.
2. Contractor will submit a bill in approved proforma in duplicate to the Engineer-in -charge of
the work giving abstract and detailed measurements of various items executed during a month as
mutually agreed. The Engineer-in-charge shall verify the bill and the claim, far as admissible,
adjusted if possible, within 10 days of presentation of the bills.
3. In case of Tenders for completed items of work, contractor may be allowed 'Secured Advance'
on the Security of Materials brought to site for execution of the constructed items of work the
extent of 75% of the value of Materials of unperishable nature and an agreement bedrawn up with
contractor under which the owner secured a lien on these Materials and is safe guarded against
losses due to any reasons whatsoever. Recoveries of advance paid would not be post-poned till
the whole work is completed but shall be adjusted from his work done or the Materials used, the
necessary deductions being made when the items of work in which they are used and are billed
for. When the mode of measurement is not covered by contract for any item of work it shall be as
per latest I.S.I.
GC-78 RUNNING ACCOUNT PAYMENT TO BE RECOVERDED AS ADVANCES :
1. All running account payments shall be regarded as payments by way of advance against the
final payment only and not as payment for work actually done and completed and shall not
preclude the requiring of bad, unsound and imperfect or unskilled work to be removed and
taken away and reconstructed or to be considered as an admission of the due performance of
contract or any part thereof.
GC-79 NOTICE FOR CLAIM FOR ADDITIONAL PAYMENT :
If the contractor considers that he is entitled to extra payment or compensation or any claim
whatsoever in respect of work, he shall forthwith give notice in writing to the Engineer-in-charge
about his extra payment and/or compensation. Such notice shall be given to the Engineer-in-
charge within Ten (10) days from the happening of any event upon which contractor basis such
claims and such notice shall contain full particular of the nature of such claim with full details
and amount claimed. Failure on the part of the contractor to put forward any claim with the
necessary particulars as above within the time above specifed shall be an absolute waiver
thereof. No commission by S.M.C. to reject any such claim and no delay in dealing therewith
shall be waiver by S.M.C. of any rights in respect thereof.
GC-80 PAYMENT OF CONTRACTOR'S BILL :
1. The price to be paid by the S.M.C. to contractor for the work to be done and for the
performance of all the obligations under taken by the contractor under contract shall be based on
the contract price and payment to be made accordingly for the work actually executed and
approved by the Engineer-in-charge.
2. No payment shall be made for work costing less than Rs.5,000/-till the work is completed
and a certificate
of completion given. But in case of work estimated to cost more than Rs.5,000/- contractor on
submitting the bill thereof will be entitled to receive a monthly payment, proportionate to the
part thereof, approved and passed by Engineer-in-charge whose certificate of such approval and
passing of the sum so payable shall be final and conclusive against contractor. This payment
will be made after making necessary deductions as stipulated elsewhere in the contract
documents for Materials, security deposit, etc. The payment shall be released to the
contractor within Thirty (30) days of submission of the bill in case of running bill and with in
two (02) months in case of final bill, contractor shall present the bill duly pre-receipted on
proper revenue stamp.
Payment due to Contractor shall be made by the by crossed Accounts payee cheque in Indian
currency forwarding the same to the registered office of the contractor. Owner shall not be
responsible if the cheque is mislaid or misappropriated by unauthorised person.
GC-81 FINAL BILL :
The final bill shall be submitted by Contractor within two (02) month of the date of physical
completion of work, Otherwise the Engineer-in-charge certificate of the measurement and of total
amount payable for work shall be finalised binding on all parties.
GC-82 RECEIPT FOR PAYMENT :
Receipt for payment made on account of work when executed by a firm must be signed by a
person holding power of attorney in this respect on behalf of contractor except when described
in the tender as a limited company in which case the receipt must be signed in the name of the
company by one of its principal officers or by some other person having authority to give
effectual receipt for the Company.
GC-83 COMPLETION CERTIFICATE :
1. When the contractor fulfil his obligation as per terms of contract he shall be eligible to
apply for completion certificate. Contractor may apply for separate completion certificate in
respecf of each such portion of work by submitting the completion documents alongwith such
application for completion certificate.
The Engineer-in-charge shall normally issue to contractor the completion certificate within
(Two) month after receiving an application thereof from contractor after verifying from the
complete documents and satisfying himself that work has been completed in accordance with and
as set out in the construction and erection drawings and the contract document. Contractor after
obatining the completion certifi-cate is eligible to present the final bill for work executed by
him under the terms of contract.
2. Within 2 (Two) month of completion of work in all respect contractor shall be furnished with a
certificate by the Engineer-in-charge of such completion but no certificate shall be given nor shall
work be deemed to have been executed, until all (1) scaffolding, surplus Materials and rubbish is
clearing off site completely (2) until work shall have been measured by the Engineer-in-charge
whose measurement shall be binding and conclusive and (3) until all the temporary works, labour
and staff colonies etc.constructed are removed and the work site cleaned to the satisfaction of the
Engineer-in-charge. If contractors shall fail to comply with the requirements as aforesaid or
before date fixed for the completion of work,the Engineer-in-charge may at the expenses of
contractor remove such scaffolding, surplus Materials and rubbish and dispose of the same he
3. The following documents will form the completion documents :
(a) Technical documents according to which work was carried out.
(b) Construction drawings showing therein the modifications and corrections made during the
course of execution signed by Engineer-in-charge.
(c) Completion certificate for "Embedded" or "Covered" up work.
(d) Certificate of final levels as set out for various works.
(e) Material appropriation statement for the Materials issued by owner for work and list of
surplus Materials returned to S.M.C.'s store duly supported by necessary documents.
4. Upon expiry of the period of defects liability and subject to Engineer-in-charge being
satisfied that work has been duly maintained by contractor during the defects liability period
as fixed originally, or as external subsequently and the contractor has in all respects made up
by subsidence and performed all his obligations under contract, the Engineer- in-charge shall
(without prejudice to the rights of owner in any way) give final certificate to that effect.
The Contractor shall not be considered to have fulfilled the whole of his obligation until final
certificate shall have been given by the Engineer-in-charge notwithstanding previous entry upon
and taking possession, working or using of the same or any part thereof by owner.
5.Final Certificate only Evidence of Completion :
Except the final certificate no other certificate or payments against a certificate or an general
account shall be taken to be an admission by owner of the due performance of contract or any part
thereof or of occupancy validity of any claim by the contractor.
GC-84 TAXES, DUTIES, OCTROI, ETC. :
The Contractor shall be liable to payment of all the Central/ State/Local Bodie's Levies,/ taxes or
duties etc. The SMC shall neither bear it nor reimburse at any time but will ensure
deduction of Central/State/Local levies and taxes at Source at the rate provided under the
relevant statutes from time to time inforce.
1% Construction Cess will be deducted from respective R.A. Bill and Final bill in
accordance with the prevailing norms of Govt. of Gujarat.
GC-85 INSURANCE :
Contractor shall at his own expenses carry and maintain with reputable Insurance Companies
to the satisfaction of owner as follows :
1.Employees State Insurance Act :
Contractor agrees to and does hereby accept full and exclusive liability for compliance with all
obliga-tions imposed by the Employees' State Insurance Act 1948, and Contractor further agree
to defend, indemnify and hold owner harmless from any liability or penalty which may be
imposed by the Central or State Government of Local authority by reasons of any asserted
violation by contractor or Sub-Contractor of the Employees' State Insurance Act, 1948 and also
from all claims, suits or proceedings that may be brought against owner arising tender, growing
out of or by reasons of the work provided for by this contract whether brought by employees of
Contractor, by third parties or by Central or State Government authority or any administrative
Sub-division thereof. Contractor agrees to fill in with the Employees State Insurance
Corporation, the declaration from and all forms which may be required in respect
Contractor's or Sub-contractor's employees these aggregate remuneration is Rs. 400/-p.m.or less
and who are employed in work provided for or those covered by E.S.I from time to time under
the agreement. The Contractor shall deduct and secure the agreement of the Sub-contractor
to deduct the employees' contribution as per the first Schedule of the Employees' State
Insurance Act from wages. Contractor shall remit and secure the agreement of Sub-contractor to
remit to the State Bank of India Employees' State Insurance Corporation Accounts, the employees
contribution as required by the Act Contractor agrees to maintain all cares and record as
required under the Act in respect of employees and payments and contractor shall secure the
agreements of the sub-contractors to maintain such records, any expenses incurred for the
contributions or maintaining records shall be to contractor's or sub- contractor' account.
Owner shall retain such sum as may be necessary from the contract value until contractor
shall furnish satisfactory proof that all contribution as required by the Employees' State Insurance
Act 1948 have been paid.
2.Workman's Compensation And Employees Liability Insurance :
Insurance shall be effected for all contractors employees engaged in the performance of this
contact. If any part of work is sublet, contractor shall require the sub-contractor to provide
workmans' compensation and employer's liability insurance which may be required by owner.
3.Other Insurance required under law or regulation by owner :
Contractor shall also carry and maintain any and all other insurance which may be required
under any law or regulation from time to time. He shall also carry and maintain any other
insurance which may be required by owner.
GC-86 DAMAGE TO PROPERTY :
1. Contractor shall be responsible for making good to the satisfaction of owner any loss of and any
damage to all structures and properties belonging to owner or being executed or Procured by
owner or of other Agencies within the premises of all work of owner, if such loss or damage is
due to fault and / or the negligence or will full act or ommission of contractor, his employees,
agent representatives or Sub- contractors.
2. Contractors shall indemnify and keep owner harmless of all claims for damage to properties
other than S.M.C's property arising under or by reasons of this agreement if such claims result
from the fault and / or negliance or wilful act of ommission of contractor,his employees, agents,
representatives or sub-contractors.
GC-87 OUR LAWS AND REGULATIONS :
1.The contractor shall be reponsible for the strict compliance of and shall ensure strict
compliance by his sub contractor employees and agents of all labours and others laws, rules or
regulations having the force of law affecting the relationship of employer and employee
between the contractor/ sub-contractor and their respective employees.
2.No labour below the age of eighteen (18) year be employed on work.
3.Contractor shall pay to the labours engaged on work according the law.
4.The Contractor and sub-contractors o f the contractor shall obtain proper authority disignated
in this behalf under any application law, rules or regulations (including but not restricted to the
factories Act and Contract Labour Abolition and Regulation Act 1970,) in so far as applicable)
any and all such licences, consents, Registration and / or other authorisation as shall from
time to time be or become necessary for relatint to the execution of work or any part of
portion thereof or the storage or supply of any Materials or otherwise in connection with the
performance of the contract and shall at all times observance by the sub- contractors,
employees and agents of all terms and conditions of the said licences,consents, regulation and
other authorisa- tion and laws, rules and regulations applicable thereto.
GC-88 CONTRACTOR TO INDEMNIFY OWNER :
1. The Contractor shall indemnify and keep indemnified the owner and every member, officer
and employee of owner from and against all action, claims, demands and liabilities whatsoever
and in respect of the breach of any of the above clauses and/or against any claim, action or
demand by any workman/ employee of the contractor or any sub-contractor and or from any
liability and way to any workman / employee of the contractor or any sub-contractor under
any law, rule or regulations having the force of law, including but not limited to claims against
the owner under the workman compensation Act 1923. The employees' Provident Funds Act
1952 and/or the Contract Labour (Abolition and Regulations) Act,
2. Payment of claims and damages :
If owner has to pay any money in respect of such claims or demands as aforesaid, the amount so
paid and the cost incurred by the owner shall be charged to and paid by contractor without
any dispute notwithstanding the same may have been paid without the consent or authority of
the Contractor.
3. In every case in which by virtue of any provision applicable in the workman's Compensation
Act 1923 or any other Act, be obliged to pay compensation to workman employed by
Contractor the amount of compensation so paid, and without prejudice to the rights of S.M.C.
under sec.(12) Sub-section (2) of the said Act, S.M.C. shall be at liberty to recover such amount
from any surplus due to the contractor or the security deposit. S.M.C. will not be bound to
contest any claim made under section (12) Sub-section (2) of the said Act except or written
request of Contractor and upon the contesting of such claim.
4. The Contractor shall protect adjourning sites against structural decorative and other damages
caused to adjourning premises by the execution of these works and made good at his cost, any
such damage, so caused.
GC-89 IMPLEMENTATION OF APPRENTICE ACT 1964 :
Contractor shall comply with the provisions of the Apprentice Act 1964 and the orders issued
thereunder from time to time. If the fails to do so, it will be a breach of contract. Contractor shall
also be liable for any particular liability arising on account of any violation of the provisions of
the Act by him.
GC-90 HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS :
Contractor shall comply with all the rules and regulations of the local sanitary authorities or as
framed by owner from time to time for the protection of health and sanitary arrangements of all
labour directly or indirectly employed on the work of this contract.
GC-91 SAFETY CODE :
Contractor shall adhere to safe construction practice and gurard against hazardous and unsafe
working conditions and shall comply with owner's safety rules and set fourth herein.
1. First Aid and Industrial Injuries :
1.1 Contractor shall maintain first aid facilities for its employees and chose of his sub-
1.2 Contractor shall make outside arrangements for ambulance service and for the treatment
of industrial injuries. Name of those providing these services shall be furnished to Engineer-in-
charge prior to start of construction, and their telephone numbers shall be prominently posted
in contractor's field office.
1.3 All injuries shall be reported promptly to Engineer- in-charge, and a copy of
Contractor's report covering each personal injury requiring the attention of a physician shall
be furnished to owner.
2. General Rules :
2.1 Carrying, striking, matches, lighters inside the project area & smoking within the job site is
strictly probibited Violators of smoking rules shall be discharged immediately. Within the
operation area, not hot work shall be permitted without valid gas safety, fire permits. The
Contractor shall also be held liable and responsible for all lapses of his sub-contractors/
employees in this regards.
3. Scaffolding :
3.1 Suitable scaffolding shall be provided for workmen for all works that can not safely be
done from the ground or from solid construction except such short period work as can be done
safely from ladders. When a ladder is used, an extra mazdoor shall be engaged for holding the
ladder and if the latter is used for carrying Materials as well, suitable foothold sand handholds
shall be provided on the ladder and the same shall be given inclination not steeper than 1 to
(1 horizontal and 4 vertical).
3.2 Scaffolding or stagging more than 3.6 M (12') above the ground or floor, swing or
suspended from an overhead support or erected with stationary support shall have a guard rail
properly attached, bolted, braced and otherwise fixed at least 1.0 M (3') high above the floor or
platform of scaffolding or staging and extending along the entire length of the outside ends
thereof with only such openings as may be necessary for the delivery of Materials. Such
scaffolfing or staging shall be so fastened as to prevent it from swaying from the building or
4. Maintenance of Safety Devices :
4.1 All scaffolds,ladders and other safety devices mentioned or described herein shall be
maintained in some conditions and no scaffold, ladder or equipment shall be altered or
removed while it is in use. Adequate washing facilities should be provided at or near place or
5. Display or Safety Instructions :
5.1 These safety provisions should be brought to the notice of all concerned by display on a
notice board at a prominent place at the work-spot. The person responsible for compliance of the
safety code shall be named therein by the Contractor.
6. Enforcement of Safety Regulations :
6.1 To ensure effective enforcement of the rules and regula-tions relating safety precautions,
the arrangements made by the contractor shall be open to inspection by the welfare Officer,
Engineer-in-charge of safety Engineer of the owner or their representatives.
7. No Exemption :
7.1 Not with standing the above clause 1.0 to 13.0 there is nothing to exempt the contractor
from the operations of any other Act or rules in force in the Republic of India.
7.2 In addition to the above, the Contractor shall abide by the safety code provision as per
C.P.W.D. Safety Code framed from time to time.
GC-92 ACCIDENTS :
It shall be the contractor's responsibility to protect against accidents on the work. He shall
indemnify the Municipal Corporation against any claim for damage or for injury to persons or
property resulting from, and in the course of work and also under the provision of the
Workman's Compensation Act. On the occurance of an accident arising out of the works which
results in death or which is so serious as to be likely to result in death, the contractor shall
within twenty four hours of such accident, report in writing to the Engineer-in-charge, the
facts stating clearly and is sufficient details the circumstances of such accident and the
subsequent action. All other accidents on the works involving injuries to persons or damage to
property other than that of the contractors shall be promptly reported to the Engineer-in-charge
stating clarly and in sufficient details and facts and circumstances of the accidents and the
action taken. In all cases the contractor shall indemnify the Municipal Corporation against all
loss of damage resulting directly or indirectly from the Contractor's failure to report in the
manner aforesaid. This includes panalties or fine consequency of failure to give notice under
the workman's compensation Act or failure to confirm to the provisions of the said.Act in regard
to such accidents.
In the event of an accident in respect of which compensation may become payable under the
workmens compensation Act VIII of 1923 including all modification thereof whether such
compensation may become payable by the contractor or by the Municipal Corporation as
principal employer, the Engineer-in-charge may retain out of money due and payable to the
contractor such sum or sums of money as may, in the opinion of the Engineer-in-charge be
sufficient to meet such liability. On receipt of award from the labour commission in regard to
quantum of compensation, the difference in amount will be adjusted.
GC-93 It is clarified that if the contractor makes his own arrangements for water required for
construction and labour camp etc. by drilling bore. No water charges will be recovered from
the contractor. On the otherhand, even if the contractor is not taking connection and makes
other arrangement to use Municipal water by tanker or tapping water from near private
connection even so water charges shall be recovered as per relevant condition of the tender.
GC-93 (A) PRICE VARIATION CLAUSE:
No Price Variation difference will be paid to the contractor for Labour, Materials, P.O.L. (Fuel) or
any other material for the work
GC-93 (B) STAR RATE & DIFFERENCE FOR REINFORCEMENT STEEL &
No star rate or basic rate difference will be paid to the contractor for cement , steel reinforcement
or any other material for the work.
GC-94 GOODS AND SERVICE TAX (GST)
GST CLAUSE FOR CONSTRUCTION / ERECTION / COMMISSIONING / INSTALLATION /
REPAIRS / MAINTENANCE / RENOVATION / FABRICATION OF STRUCTURE
INCLUDING BUILDING (MEANS ALL WORKS CONTACT / TURN KEY PROJECTS /
SUPLY OF MATERIAL / GOODS)
GST (Goods & Service Tax) has come in existence from 1 July 2017. Contract / Successful
Bidder is bound to pay any amount of GST prescribed by the Govt. of India as per the
Terms of Contract agreed upon during the course of execution of this Contract.
During the course of execution of contract. if there is any change in Rate of GST (Goods &
Service Tax) by the Government the same shall be reimbursed / recovered separately by SMC
subject to the submission of Original Receipt / proof for the amounts actually remitted by the
successful Tenderer / Contractor to the competent authority along with a certificate from
Chartered Accountant of Contractor / Successful Bidder certifying that the amount of GST paid to
the Government and the same shall be intimated / submitted /claimed within 30 Days form the
date of payment Remittance of GST within stipulated period shall be the sole responsibility of the
Successful Bidder / Contractor, failing which SMC and decision of Municipal Commissioner shall
be final and binding on the Contractor / Successful Bidder in this regard Further the non-payment
of GST to the Government may lead to the termination of contact and forfeiture of security
Deposit / Performance Guarantee Amount.
If imposition of any other new Taxes / Duties / Levies / Cess or any other incidentals etc. or any
increase in the existing Taxes / Duties / Levies / Cess or any other incidentals etc. (Excluding GST
) are imposed during the course of the contract the same shall be borne by the Contractor /
Successful Bidder only in no case SMC shall be liable for the same.
The Contractor will submit the invoice to the SMC having GSTIN of SMC mentioned therein and
the taxes shall be shown separately on the face of the invoice so as to claim as ITC by SMC.
NOTE :- The Rates mentioned in BOQ are excluding GST. GST will be reimbursed separately (if
applicable as per the opinion of Account department of SMC / GST Consultant of SMC) as per
the prevailing GST Rates decided by the Government. The contractor is invariably bound to
any changes in GST Rates made during the course of the work. Decision of Account
Department of SMC regarding applicable GST Rates will be final. Construction Cess will be
deducted from all Running Bills & Final Bills as per the prevailing Government Rates
GC-95 SECURED ADVANCES:
No Secured advances shall be paid.
GC-96 SUBMISSION / COMPULSION BY CONTRACTOR
The contractor registered with S.M.C. or any other Govt. organisation is required to employ
minimal technical staff as detailed in the certificate issued to him. If contractor does not employ
same technical staff over works entrusted to him, should submit photo-identity and education
qualification of technical staff appointed at site.
"The contractor shall have to keep the record of the labourers employed for the concerned work.
The contractor should provide attendance card, identification card, pay slip etc to the labourers
employed. Further, the amount of E.S.I. & Provident Fund should be deducted from the salary of
the labourers employed and such amount should invariably be deposited to the concerned
Government Departments. In addition, the amount of social security under E.P.F. & M.P. act
shall be recovered every month & such amount should invariably be deposited directly to the
concern Government Departments. In the same context, the details regarding such amount
deposited to the concern Govt. Deptt. and labourers employed shall be furnished to the office of
Traffic Cell Department of S.M.C. every month.In case of failure, such amount shall be
deducted/recovered from the running bill directly in accordance with the details given by
contractor regarding labourers employed and as per the prevailing rules of Government.In absence
of detail, an adhoc suitable amount of the total amount of work done shall be recovered directly
of detail, an adhoc suitable amount of the total amount of work done shall be recovered directly
from the running bills. On submission of evidence of recovery of such amount, the amount
recovered/deducted shall be released in the next bill after due sanction of Competent Authority of
GC-97 SPECIAL RISK
If during the contract, there shall be outbreak of war (whether war is declared or not), major
epidemic, earthquake, or similar occurrence in any part of the world beyond the control of either
party to the contract which whether financially or otherwise materially affects the execution of the
contract, the contractor shall unless and until, the contract is terminated under the provisions of
this article, use his best endeavors to complete the execution of the contract, provided always that
the Corporation shall be entitled at any time after the onset of such special risks, to terminate the
contract by giving written notice to the contractor and upon such notice being given this contract
shall terminate but without prejudice to the rights of either party in respect of any antecedent
breach thereof. If any of the works, or materials to be deli subjected to damage or distribution by
reasons for the special risks, the contractor shall be entitled to payment for such damage or
destroyed materials and to any costs involved in making good damages or destroyed materials as
may be required by the Municipal Corporation.
The contractor shall not be liable for payment of compensation for delay or for failure to perform
the contract for reasons of Force Majeure such as acts of public enemy, acts of Government fires,
floods, cyclone, epidemics, quarantine restrictions, lockouts, strikes, freight embargoes and
provided that the contractor shall within Ten (10) days from the beginning of such delay notify the
Engineer-in-charge in writing the cause of delay. The Municipal Commissioner shall verify the
facts and grant such extension as the facts justify.
GC-98 SECURITY DEPOSIT
The person/persons whose tender may be accepted (hereinafter called the contractor, which
expression shall unless excluded by or repugant to the context include his heirs, executors,
administrators and assignees) shall (within 15 days of the receipt by him of the notification of the
acceptance of his tender otherwise 0.065% per day of S.D. amount will be charged as penalty)
deposit with Municipal Commissioner in cash or Government securities endorsed to the
Commissioner sum sufficient which will make up the security deposit specified in the tender.
If the amount of the security deposit to be paid in lump sump within the period specified above
is not paid the tender contract already accepted shall be considered as cancelled. The security
deposit lodged by contractor shall be refunded after the expiry of the Defects Liability period
as shown in the attached Memorandum after deducting dues, ifany, which become liable to be
recovered from the contractor under the terms and conditions of this Agreement.
GC-99 COMPENSATION OF THE DELAY
The time allowed for carrying out the work as entered in the ender shall be strictly observed
by the contractor and shall be reckoned from the date on which the order to commence work is
given to the contractor. The work shall through out the stipulated period of the contract be
proceeded with, all due diligence (time being deemed to be the assence of the contract on the part
of the contractor) and the contractor shall pay as conpensation a percentage amount (shown in
the attached Memorandum) of the tendered cost of the whole work as shown by the tender for
every day that the work remains uncommenced or unfinished after the proper days, And further
to ensure good progress during the execution of the work the contractor shall be bound, in all
cases in which the time allowed for any work exceeds one month, to complete parts of the
work during the period shown in the attached Memorandum.
In the event of the contractor failing to comply with these conditions he shall be liable to pay as
compensation, the amount mentioned above for every day that the due quantity of work remained
incomplete provided always that the total amount of compensation to be paid under the provision
incomplete provided always that the total amount of compensation to be paid under the provision
of this clause shall not exceed 10 percent of the Tendered cost of the work as shown in the tender.
GC-100 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FOREFITED
In any case in which under any clause of or clauses this contract the contractor shall have
tendered himself liable to pay compensation amounting to the whole of this security deposit
(whether paid in one sum or deducted by instalments) or in the case of abandonment of the
work owing to serious illness or death of the contractor or any other causes, the Commissioner
on behalf of the Corporation shall have power to adopt of the following courses, as he
may deem best suited to the interest of Municipal Corporation .
(a) To rescind the contract (of which rescission notice in writting to the contractor under the
hand of the Commissioner shall be conclusive evidence) and in that case that security deposit
of the contractor shall stand forefeited and be absolutely at the disposal of Municipal Corporation
(b) To employ labour paid by the related Zone and to supply material to carry out the works,
or any part of the work debitting, the contractor with errectness of which cost and price the
certificate of Executive Engineer shall be final and conclusive against the contractor and
crediting him with the value of the work done,in all respects in the same manner and at the same
rates as if it had been carried out by the contractor under the terms of his contract, and in that
case the certifate of the Executive Engineer as to the value of the work done shall be final and
conclusive agains the contractor.
(c) To order that the work of the contractor be in measured up and to take such part
thereof as shall be unexecuted out of his hands, and to give it to another contractor to complete, in
which case any expenses which may be incurred in excess of the sum which would have been
paid to original ontractor, if the whole work had been executed by him (as to the amount of
which excess expenses the certificate in writing of the Executive Engineer shall be finl and
conclusive) be borne & paid by the original contractor shall be deducted from any money due
to him by Municipal Corporation under the contract or otherwise from his security deposit or
the proceeds of sale thereof, or a sufficient part thereof.
Action when the progress of any perticular portion of the work if unsatisfactory
In the event of any of the above courses be adopted by the Commissioner the contractor shall
have no claim to compensation for any loss sustained by him by reason of his purchased or
procured any materials or entered into any engagements, or made any advances on account of or
with a view to the execution of the work or the performance of the contract.And in case the
contract shall be reseinded under provision aforesaid, the contractor shall not be entitled to
recover, or be paid any sum for any work thereto actually performed by him under this contract
unless and until the Executive Engineer shall have certified in writing the performance of such
work and the amount payable to him in respect thereof, and he shall only be entitled to paid the
Particular amount so certified.
GC-101 COMPENSATION TO LOSS
Contractor remains liable to pay compensation if action not taken under clause(3) If the progress
of any particular portion of the work is unsatisfactory the Commissioner shall notwithstanding that
the general progress of the work is satisfactory in accordance with clause 2, be entitled to take
action under clause 3 (b) after giving the contractor 10 day's notice in writing and contractor
will have no claim for compensation for any loss sustaind by him owing to such action.
GC-102 Power to take possession of require to removal of, or self contractor's plan
In any case in which any of the powers conferred upon the Commissioner by clause 3 and
hereof shall have become exercisable and same shall not have been exercised the non-exercise
thereof shall not constitute a waiver of any of the conditions hereof such powers shall
notwithstanding be exercisable in any future case default by the contractor for which by any
cluase or clauses hereof he is declared liable to pay compensation mounting to the whole of
his security deposit require or and the liability of the contractor for past and future
compensation shall remain unaffected.
In the event of the Commissioner taking action under sub-caluse (a) or (c) of clause 3, he may,
be he so desire to take possession of all or any tools, plant materials and stores in or upon the
works, or the site thereof or belonging to the contractor, or procured by him and intended to be
used for the execution of the work of any part thereof, paying or allowing for the same in account
at the contract rates, or in the case of contract rates not being applicable, at current market
rates,to be cartified by the Executive Engineer whose certificate thereof shall be final. In the
alternative the Commissioner may by notice in writing to the contractor or his clerk of the works.
Foremen or other authorised agent require him to remove such tools, plant, materials, or stores
from the premises within a time specified in such notice; &in the event of the contractor failing
to comply with any such requisition, the Commissioner may remove them at the contractor's
expense or sell them by action or private sale at the risk and account of the contractor in all
respects, and certificate of the Executive Engineer as to the expense of any such removal, and the
amount of the proceeds and expense of any of any sale shall be final and conclusive against the
GC-103 EXTENSION OF TIME
If the Contractor shall desire an extension of the time for completion of the work on the
ground of his having been unavoidably hindered in its execution or on any other ground, he
shall apply in writing to the Commissioner within 30 days from the date on which he was
hindered as aforesaid on or which the cause for asking for extension occurred and the
Commissioner may, if in his opinion, there are reasonable grounds for granting an extension,
grant such extension as he thinks necessary or proper. The decision of the Commissioner in
thismatter shall be final.
GC-104 FINAL CERTIFICATION
On completion of the work the contractor shall be furnished with a certificate by the Executive
Engineer (hereinafter called the Engineer- in- charge) of such completion, but no such certificate
shall be given nor shall the work be considered to complete until the contactor shall have removed
from the premises on which the work shall have been executed all scaffolding, surplus
materials and rubbish, and shall have cleaned of the dirt from all woodwork, doors,
windows,walls, floors or other parts of any building, in or upon which the work has been
executed,or of which he may have had possession for the purpose of executing the work,nor until
the work shall have been measured by the Engineer-in-charge or w here the measurement have
been taken by his subordinates until they have received the approval of the Engineer-in-
charge, the said measurement being binding and conclusive against the contractor.
If the contractor shall fail to comply with the requirements of this clause as to the removal of
scaffolding, surplus materials and rubbish. And cleaning off dirt on or before the date fixed for
the completion of the work, the Engineer-in-charge may, at the expense of the contractor remove
such scaffolding surplus material and rubbish, and dispose off the same as he thinks fit and
clean off such dirt as aforesaid; and contractor shall forthwith pay the amount off all
expenses so incurred,but shall have no claim in respect of any such scaffolding or surplus
materials as aforesaid except for any sum actually realized by the sale thereof.
GC-105 PAYMENT ON INTERMEDIATE CERTIFICATE TO REGARDED AS
No payment shall be made for any work, on estimated to cost less than rupees one thousand, till
after the whole of the said work shall have been completed & a certificate of completion given.
But in the case of works estimated to cost more than rupees one thousand, the contractor shall, on
submiting a monthly bill therefore be entitled to received payment proportionate to the percentage
shown in the attached Memorandum of the part of the works than approved and passed by the
Engineer-in-charge, whose certificate of such approval and passing of the sum so payable shall be
final and conclusive against the contractor.
All such intermediate payment shall be regarded as payment by way of advance against the final
payments only & not as payments for work actually done and completed and shall not preclude
the Engineer-in-charge from requiring bad, unsound imperfect of unskilful work to be removed &
taken away & reconstructed, or re-erected. nor shall any such payment be considered as an
admission of the due performance of the contract or any part thereof in any respect of the accruing
of and claim; nor shall it conclude, determine or affect in any way the Powers of the Engineer-in-
charge as to the final settlement and adjustment of the accounts or otherwise, or in any other way
very or affect the contract. The final bill shall be submitted by the contractor within one month of
the date fixed for the completion of the work, otherwise the Engineer-in-charge's certificate of the
measurement and of the total amount payable for the work shall be final and binding on all parties.
measurement and of the total amount payable for the work shall be final and binding on all parties.
GC-106 PAYMENT AT REDUCED RATE ON ACCOUNT OF ITEM OF WORK NOT
ACCEPTED AS COMPLETED TO BE THE DISCRETION OF THE ENGINEER-IN-
The rates for serveral items of the work agreed to within, shall be valid only when the item
concerned is accepted as having been completed fully in accordance with the sanctioned
specifications. In cases where the items of works are not accepted at so completed the Engineer-
in-charge may make payment on account of such items at such reduced rates as he may consider
reasonable in the prepartion of final or on account bills.
CLAUSE-10 Time for Bills to be submitted
A bill may be submitted by the contractor once in each month on or before the date fixed by the
Engineer-in-charge for all works executed in the previous months, and the Engineer -in- charge
shall take or cause to be taken the requisite measurement for the purpose of having the same
verified, and the claim, so far as it is admissible shall be adjusted if possible within fifteen days
from the presentation of the bill. If the contractor does not submit the bill within the time fixed as
aforesaid, Engineer-in-charge may depute a subordinate to measure up the said work in the
presence of the contractor or his duly authorised agent whose counter signature to the
measurement list shall be sufficient warrant, and the Engineer-in-charge may prepare a bill from
such list which shall be binding on the contractor in all respects.
GC-107 BILLS TO BE ON PRINTED FORMS
The contractor shall submit all bills on the printed forms to be had on application at the office of
the Engineer-in-charge. The charges to be made in the bills shall always be entered at the rates
specified in the tender or in the case of any extra work ordered in pursuance of these conditions,
and not mentioned or provided for in the tender at the rates hereinafter provided for such work.
GC-108 STORES SUPPLIED BY SMC
If the specification or estimate of the work provides for the use of any special description of
materials to be supplied from the Municipal Store or if it is required that the contractor shall use
certain stores to be provided by the Engineer-in-charge (such materials and stores and the prices to
be charged thereof as hereinafter mentioned being so far as practicable for the convenience of the
contractor but not so as in any way to control meaning or effect of the contract specified in the
schedule or memorandum hereto annexed) the contractor shall be supplied with such materials and
stores as may be required from time to time to be used by him for the purpose of the contract only
and the value of the full quantity of materials and stores so supplied shall be set off deducted form
any sums then due, or thereafter to become due to the contractor under the contract, or otherwise
or from the security deposit, or the proceeds of sale thereof shall be deposit is held in
Governement securities the same or a sufficient portion there of shall in that case be sold for the
purpose. All material supplied to the contactor shall remain the absolute property of Municipal
Corporation and shall on no account be removed from the site of the work, and shall at all times
be opened to inspection by the Engineer-in-charge. Any such materials unused and in perfectly
good condition at the time of completion or determation of the contract shall be returned to the
related zone store, if the Engineer-in-charge so requires by a notice in writing given under his
hand, but the contractor shall not be entitled to return any such materials except with such consent
and he shall have no claim for compensation on account of any such materials supplied to him as
aforesaid but remaining unused by him or for any wastage in or damage thereto.
GC-109 WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWINGS ORDERS ETC.
The contractor shall execute the whole and every part of the work in the most substantial and
workman like manner, and both as regards materials and in every other respect in strict
accordance with the specifications. The contractor shall also conform exactly, fully and faithfully
to designs, drawings and instructions in writing relating to the work signed by the Engineer-in-
charge and lodged in his office and to which the contractor shall be entitled to have access for the
purpose of inspection at such office, or on the site of the work during office hours, and the
contractor shall, if he so requires, be entitled at his own expense to make or cause to be made
copies of the specifications and of all such designs, drawings and instruction on aforesaid.
GC-110 ALTERNATION ON SPECIFICATIONS AND DESIGN NOT TO INVALIDATE
CONTRACTORS. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR
SCHEDULE TO RATES OF THE SMC
The Engineer-in-charge shall have power to take any alteration in, or addition to the original
specifications, drawings, designs and instruction that may appear to him to be necessary or
advisable during the progress of the work, and the contractor shall be bound to carry out the work
in accordance with any instructions in this connection which may be given to him in writing
signed by the Engineer- in-charge and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner above specified as part
of the work shall be carried out by the contractor on the same conditions in all respect on which he
agreed to do the main work and at the same rates as are specified in the tender for the main work.
And if the additional and altered work includes any class of work for which on rates is specified in
this contract than such class of work shall be carried out at the rates entered in the schedule of
rates of Municipal Corporation or at the rates mutually agreed upon between the Engineer-in-
charge and the contractor whichever are lower if the additional or altered work for which no rate is
entered in the schedule of Rates of Municipal Corporation is ordered to be carried out before the
rates are agreed upon then the contractor shall, within seven days of the date of receipt by him of
the order to carry out the work, inform the Engineer-in-charge of the rate which it is his intention
to charge for such class of work and if the Engineer-in-charge does not agree to this rate he shall
by notice in writing be at liberty to cancel his order to carry out such class of work, and arrange to
carry it out in such manner as he may consider advisable provided always that if the contractor
shall commence the work or incure any expenditure in regards thereto before the rates shall have
been determined as lastly herein before mentioned, then in such case he shall only be entitled to be
paid in such case he shall only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the rate as aforesaid
according to such rate or rates as shall be fixed by the Engineer-in-charge. In the event of a
dispute, the decision of the Commissioner will be final.
Where, however, the work shall have to be executed according to the designs; drawings and
specifications recommended by the contractor and accepted by the competent authority the
alteration above referred to shall within the scope of such designs drawings and specification
appended to the tender.
Extension of time in consequence of additions or alterations. The time limit for the completion of
work shall be extended in the proportion that the increase in its cost occasioned by alterations or
addition the cost of the original contract work, and the certificate of the Engineer-in-charge as to
such proportion shall be conclusive.
GC-111 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORKS
TO BE CARRIED OUT
If at any time after the execution of the contract documents the engineer-in-charge shall for any
reason whatsoever, require the whole or any part of the work as specified in the tender to be
stopped for any period or shall not require the whole or part of the work to be carried out at all or
to be carried out by the contractor, he shall give notice in writing of the fact to the contractor who
shall thereupon suspend or stop, the work totally or partially, as the case may be. In any such case,
except as provided hereunder, the contractor shall have no claim to any payment or compensation
whatsoever on account of any profit or advantage which he might have derived from the execution
of the work in full but which he did not so derive in consequence of the full amount of the work
nor having been carried out, or on account of any loss that he may be put to on account of
materials purchased or agreed to be purchased, or for unemployment of labour recruited by him.
He shall not also have any claim for compensation by reason of any alteration having been made
in the original specifications, drawings, designs and instructions may involve any curtailment of
the work as originals contemplated. Where which however, materials have already been purchased
or agreed to be purchased by the contractor, before receipt by him of the said notice, the contractor
shall be paid for such materials at the rate determined by the Engineer-in-charge, provided they
are not in excess of requirements and are of approved quality and/or shall be compensated for the
loss, if any that he may be put to in respect of materials agreed to be purchased by him, the
amount of such compensation to be determined by the Engineer-in-charge, whose decision shall
be final. If the contractor suffers any loss on account of his having to pay labour charges during
the period during which to stoppage of work has been ordered under this clause the contractor
shall on application be entitled to such compensation on account of labour charges as the
Engineer-in-charge, whose decision shall be final, may consider reasonable, provided that the
contractor shall not be entitled to any compensation on account of labour charges if, in the opinion
of the Engineer-in-charge, the labour could have been employed by the contractor elsewhere for
the whole or part of the period during which the stoppage of the work has been ordered as a
GC-112 ON CLAIM TO COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY
IN SUPPLY OF MATERIALS BY SMC.
The contractor shall not be entitled to claim any compensation from Municipal Corporation for the
loss suffered by him on account of delay by Municipal Corporation in the supply of materials
entered in schedule A' where such delay is caused by
(1) Difficulties relating to the supply of Railway wagons & availability of Government controlled
(2) Force Majeure.
(3) Act of God.
(4) Act of the Nation's enemies or any other reasonable cause beyond the control of Municipal
In the case of such delay in the supply of material the Municipal Corporation shall grant such
extension of time for the completion of the work as shall appear to the Commissioner to be
reasonable in accordance with the circumstances of the case. The decision of the Commissioner as
to the extension of time shall be accepted as final by the contractor.
The contractor is to set out and levi the work & will be responsible for the accuracy of same. He is
to provide and maintain measuring and surveying instruments including steel tapes, theodolite
and dumpy level at all times for proper carrying of the work and for the use of Executive
Engineer and his representative including skilled attendance.
The Contractor is to cover up and protect the works from the weather, and is suspend all `wet'
operations during weather which, in the Executive Engineer opinion, will be detrimental to the
Samples of each class of material and workmanship shall be submitted by the Contractor for the
approval of Executive Engineer and after such approval these samples shall be deposited
at any place the Executive Engineer may appoint and the Contractor shall be required to
perform all the works of this contract in accordance with the samples.
On completion, all work must be cleaned down; rubbish removed and the works and land
cleaned of rubbish; surplus materials and other accumulations, and everything left in a clean
and ordinary condition.
The contractor shall provide, erect and maintain proper sheds and temporary buildings for the
storage and protection of materials and goods and for the execution of work which may be
fabricated or brought on the site.
The contractor is to set out and level the works and will be responsible for the accuracy of the
same. He shall also be responsible for the correctness of the positions, levels, dimensions and
alignment of all parts of the structures as shown in the drawings supplied to him.If at any time
any error shall appear during the progress of any part of the work, the contractor shall at his
own expense rectify such error if called upon to the satisfaction of the Executive Engineer.
The contractor shall permit the execution of the work not provided for in the tender by artists;
tradesman, or others engaged by the Municipal Corporation . The contractor shall allow all
reasonable facilities and the use of his scaffolding and water for the execution of such work,
but is not required to provide any special scaffolding for the execution of such work except by
special arrangement with Municipal Corporation .
GC-120 TIME LIMIT FOR UNFORESEEN CLAIM
Under no circumstance whatsoever shall the contractor be entitled to any compensation from
Municipal Corporation on any account unless the contractor shall have submitted a claim in
writing to the Engineer-in-charge within one month of cause of such claim occurring.
GC-121 ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK:
If at any time before the security deposit is refunded to the contactor, it shall appear to the
Engineer-in-charge or
his subordinate in charge of the work that any work has been executed with unsound imperfect, or
unskillful workmanship or with materials of inferior quality; or that any materials or articles
provided by him for the execution of the work are unsound, or of a quality inferior to that
contracted for, or other- wise not in accordance with the contract, it shall be lawful for the
Engineer-in-charge to intimate this fact in writing to the contractor and them not withstanding the
fact that the work, materials or articles complained of may have been inadvertently passed,
certified and paid for, the contractor shall be bound forthwith to rectify, or remove and reconstruct
the work so specified in whole or in part as the case may require, or if so required shall remove the
materials or articles so specified and provide other proper and suitable materials or articles at his
own charge and cost; and in the event of his failing to do so within a period to be specified by the
Engineer-in-charge in the written intimation aforesaid, the contractor shall be liable to pay
compensation at the rate of one percent on the amount of the tender for every day not exceeding
ten days, during which the failure so contimate and in the event of any such failure as aforesaid
the Engineer-in-charge may rectify or remove and execute the work or remove and replace the
materials or articles complained or as the case may be at the risk and expense in all respects of the
contractor, should the Engineer-in-charge consider that any such inferior work or materials as
described above may be accepted or made use of it; shall be within his discretion to accept the
same at such reduced rates along with the appropriate penalty as the Commissioner may deem fit.
The period to be counted from that date of final completion and handing over of the work to the
Municipal Corporation during which the contractor is so liable for any defects in the work shall be
the Defects Liability Period shown in the attached Memorandum.
GC-122 WORK TO OPEN BE INSPECTION
Contractor is responsible agent to be present. All works under in course of execution or executed
in pursuance of the contract shall at all time be open to the inspection and supervision of the
Engineer-in- charge and his subordinates, and the contractor shall at all times during the usual
working hours, and at all other times at which reasonable notice of the intention of the Engineer-
in-charge or his subordinate to visit the work shall have been given to the contractor, either
himself be present to receive orders and instructions, or have a responsible agent duly accredited
in writing present for that purpose. Orders given to the contractor's duly authorised agent shall be
considered to have the same force and effect as if they had been given to the contactor himself.
GC-123 NOTICE TO BE GIVEN BEFORE WORK IS CONVERED UP
The contactor shall give not less than five day's notice in writing to the Engineer-in- charge or his
subordinate in charge of the work before covering up or other wise placing beyond the reach of
measurement any work in order that the same may be measured; and correct dimensions thereof
taken before the same is so covered up or placed beyond the reach of measurement any work
without the consent in writing of the Engineer- in- charge or his subordinate in charge of the work,
and if any work shall be covered up or placed beyond the reach of measurement without such
notice having been given or consent obtained, the same shall be uncovered at the contractor's
expense, and in default thereof no payment or allowance shall be made for such work or for the
materials with which the same was executed.
GC-124 Contractor Liable For Damage Done, And Or Imperfection For Three Months
After Certificate.
If the contactor or his workmen; or servants shall break, deface injure or destroy any part of a
building in which they may be working, or any building, road, fence enclosure or grass land or
cultivated ground continuous to the premises on which the work of any part thereof is being
executed; or if any damage shall be done to the work for any cause whatever while if is in
progress or if any imperfection become apparent in it within the Defect liability period mentioned
above by Engineer- in- charge the contactor shall make good the same at his own expense, or in
default the Engineer in charge may cause the same to be made good by other workmen and deduct
the expenses (of which certificate of Engineer-in- charge shall be final) from any sum that may be
due or thereafter became due to the contractor or from his security deposit or the proceed of sale
thereof or of a sufficient portion thereof.
GC-125 CONTRACTOR TO SUPPLY PLANT, SCAFFOLDING ETC
The contractor shall supply at his own cost all materials ( except such special materials, if
supplied from the Pubub works department Stores in accordance with the contract).plant tools,
appliances implements, ladders, cordage, scaffolding and any temporary works which may be
required for the proper execution of the work, in the original; altered or substituted from, and
whether included in these specification or, other documents forming part of the contract or
referred to in these conditions or not and which may be necessary for the purpose of
satisfying or complying with the requirements of the Engineer-in-charge as to any matter on
which under these conditions he is entitle to be satisfied, or which he is entitled to require
together with carriage thereof. To and from the work. The contractor shall also supply without
charge the requisite number of persons with the means and materials necessary for the purpose
of setting out works and counting, weighing and assisting in the measurement or examination at
any time and from time to time of the work or materials, Failing this the same may be
provided by the Engineer-in-charge at the expense of the contractor and the expense may be
deducted from any money due to the contractor under the contract, or from his security
deposit or the proceeds of sale thereof or of a sufficient portion thereof. The contractor shall
provide all necessary fencing and lights required to protect the public from accident; and shall
also be bound to bear the expenses of every suit. Action or other legal proceedings, at law,
that may be brought by any person for Injury sustained owing to negligence of the above
precautions, and to pay damages and costs which may be awarded in any such suit action or
proceedings, to any such person, or which may with the consent of the contractor be paid in
compromising any claim by any such person.
The contractor shall make his own arrangement for drinking water for the labour employed by
GC-127 LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN OR OUTSIDE
Compensation for all damage done intentionally or unintentionally or by contractor's labourers
whether in or beyond the limits of municipal property shall be estimated by the Engineer-in-
charge or such other office as he may appoint & estimates of Engineer-in-charge subject to the
decision of the Commissioner on appeal be final & the contractor shall be bound to pay the
amount of the assessed compensation of demand failing which the same will be recovered from
the contractor as damage from the security deposit or deducted by the Engineer-in-charge from
any sum that may by due or become due from Mahanagar Seva Sadan to the contractor under
this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal proceedings that
may be brought by any person from injury sustained by him owing to negligence of precautions
to prevent the spread of fire & he shall also pay any damages and cost that may be awarded by
the court in consequence.
GC-128 WORK ON SUNDAY
No work shall be done on Sunday without the sanction in writing of the Engineer-in -charge.
Contract may be rescinded by and security deposit forfeited for subletting it without approval or
for be inging a public officer or if contractor becomes in solvent:
The contract shall not be assigned or subject without the written approval of the Engineer- in-
charge, and if the contactor shall assign or sublet his contract or attempt to do so or become
insolvent or commence any proceedings to be adjudicated an insolvent or make any composition
with his creditors, or attempt to do the Engineer-in-charge may, by notice in writing rescind the
contract. Also if any bribe, gratuity gift, loan, perquisite, reward or directly advantage, pecuniary
or otherwise, shall either or indirectly be given, promised, or offered by the contractor, or any of
his servants agents to any public officer or person in the employ of Municipal Corporation in any
way relating to his office or employment, or if any such officer or person shall become in any
way directly or indirectly interested in the contract the Engineer- in-charge may be notice in
writing rescind the contract. In the event of contract being rescinded, the security deposit of the
contractor shall thereupon stand forfeited and be absolutely at the deposit of the Mahanagar
Seva Sadan & the same consequences shall ensue as if the contract had been rescinded under
clause-3 hereof and in addition the contactor, shall not be entitled to recover or be paid for
any work thereto for, actually performed under the contract.
GC-130 SUM PAYABLE BY WAY OF COMPENSATING TO BE CONSIDERED AS
REASONABLE COMPENSATION WITHOUT REFERENCE ACTUAL LOSS
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Municipal Corporation
without reference to the actual loss or damage sustained and whether any damage has or has
not been sustained.
GC-131 CHANGES IN THE CONSTITUTION OF FIRM TO BE NOTIFIED.
In the case of a tender by partners any change in the constitution of a firm shall be forthwith
notified by the contractor to the Engineer-in-charge for his information.
GC-132 WORKS TO BE UNDER THE DIRECTION OF EXECUTIVE ENGINEER
All works to be executed under the control shall be executed under the directions and subject
to the approval in the respects of the Executive Engineer who shall be entitled to direct at what
point or points and in what manner they are to be commenced, and from time to time carried on.
GC-133 DECISION OF THE COMMISSIONER TO BE FINAL
Except where otherwise specified in the contract decision of the Commissioner shall be final
conclusive and binding on all parties to the contract upon all questions relating to the meaning of
the specification designs, drawings and instructions here in before mentioned and as to the
quality of workmanship, or materials used on the work, or as to any ot her question, claim, right,
matter, or thing whatsoever in any way arising or relating to the contract, designs, drawings,
specifications, estimates, instructions, orders or these conditions, or otherwise concerning the
works or the execution or failure to execute the same, whether arising, during the progress of
the work or after the completion or abandonment thereof.
GC-134 LUMP SUM IN ESTIMATES:
When the estimate on which a tender is made includes lump sums in respect of parts of the work
the contractor shall be entitled to payment in respect of the item of work involved or the part of
the work in question at the same rates as are payable under this contract of such items of if the
part of the work in question is not in the opinion of the Engineer-in-charge capable of
measurement the Engineer-in-charge may at his discretion pay the lump sum amount entered in
the estimate, and the certificate in writing of the Engineer-in-charge shall be final and
conclusive under the provision of the clause.
GC-135 ACTION WHERE NO SPECIFICATION
In the case of any class of work of which there are on such specifications as are mentioned in
Rule 1 such work shall be carried out in accordance with the Municipal or Gujarat Government
P.W.D. specifications, and in event of there being no Municipal or Government P.W.D.
specifications, then in such case the work shall be carried out in all respects in accordance with the
instructions & requirement of the Engineer- in-charge.
GC-136 DEFINITION OF WORKS
The expression "works" or "Work" where used in these conditions shall, unless there be
something in the subject or context repugnant to such construction be constructed to mean the
work of works the contracted to be executed under or in virtue of the contract, whether
temporary or permanent, and whether original altered, substituted or additional.
GC-137 REFUND OF QUARRY FEES AND ROYALTIES
All quarry fees and royalties shall be paid by the contractor All octroi taxes shall also be paid
contractor according to the Municipal rules in force at the time and no refund shall be given
Certificate for refund of quarry fees and royalties in admissible under existing rules shall be
given by the Municipal to the contractor after successful completion of the contract. For the levy
of water charges for construction work, please see the attached Memorandum.
GC-138 COMPENSATION UNDER WORKMEN'S COMPENSATION ACT
The contactor shall be responsible for and shall pay any compensation to his workmen payable
under the workmen's Compensation Act 1923 ( VIII of 1923 ) or any statutory modification
thereof for injuries caused to workmen.
GC-139 CLAIM FOR QUANTITIES OF WORK ENTERED IN THE TENDER
Quantities shown in the tender are approximate and no claim shall be entertained for quantities
of work executed being either more or less then those entered in the tender of estimate.
GC-140 CLAIM FOR COMPENSATION DELAY IN STARTING THE WORK
No. compensation shall be allowed for any delay caused in the starting of the work on account
of any acquisition of land and in the case of clearence work, for any delay in accordance to
GC-141 CLAIM FOR COMPENSATION FOR DELAY IN THE EXCAVATION OF
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow pits or compartments. The rates are inclusive for hard or cracked soil
excavation in mud, sub- soil water or water standing in borrow pits, and no claim for an
extra rate shall be entertained, unless otherwise expressly specified.
GC-142 ENTERING UPON OR COMMENCING ANY PORTION OF WORK
The contractor shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge of the
work failing such authority the contractor shall have no claim to ask for measurements for
payment of work,
GC-143 MINIMUM AGE OF PERSONS EMPLOYED THE EMPLOYMENT OF
DONKEYS AND OR OTHER ANIMALS & THE PAYMENT OF FAIR WAGES
(i) No contractor shall employ any person who is under the age of 12 years.
(ii) No contractor shall employ donkeys or other animals with breching of string or thin
rope. The breeching must be atleast three inches wide and should be of tape (Nawar).
(iii) No animals suffering from sores, lameness or emaciation or which isimmature shall be
employed on the work.
(iv) The Engineer-in-charge or his agent is authorised to remove from the work any person or
animal found working which does not satisfy these conditions and no responsibility shall be
accepted by Municipal Corporation for any delay caused in the completion of the work by
(v) The contractor shall pay fair & reasonable wages to the workmen employed by him in the
contract undertaken by him in the event of any dispute arising between the contractor
and his workmen onthe grounds that the wages paid are not fair and reasonable, the
dispute shall be referred without delay to the Executive Engineer who shall decide the same.
The decision of the Executive Engineer shall be conclusive and binding.
On the contractor but such decision shall not in any way affect the condition in the
contract regarding the payment to be made by Municipal Corporation at the sanctioned
GC-144 METHOD OF PAYMENT
Payment to contractors shall be made by cheques drawn on any Bank in Surat, provided the
amount exceeds Rs.10. Amounts not exceeding Rs.10 will be paid in cash.
GC-145 ACCEPTANCE OF CONDITION COMPULSORY BEFORE TENDERING FOR
Any contractor who does not accept these conditions shall not be allowed to tender for works.
GC-146 CLAUSE HEADINGS
The clause headings in these conditions are for purposes of reference only and are not to be
deemed to from part of this contract.
Disputes if any, shall be discussed and mutually settled and in case of disagreement the same
shall be referred to Commissioner/Standing Committee. After referring to Commissioner/Standing
Committee if the said dispute is not solved, the same shall be referred to the court subject to Surat
Jurisdiction only.
GC-148 THE FOLLOWING CONDITION ARE BEING INCLUDED IN THIS TENDER
AND SHALL BE CONSIDERED AS A PART OF TENDER DOCUMENT.
(i) In case the total amount of work done is less than 5% of the contract value, prorate S.D. to
(i) In case the total amount of work done is less than 5% of the contract value, prorate S.D. to
that extent may be refunded to the contractor while releasing the payment of final bill. In short, the
S.D. to be retained by the Corporation after payment of final bill shall be equal to 2% of the
amount of final bill as per the prevailing norms or as per the norms decided from time to time.
(ii) If there is increase in amount of work more than 5% of the Contract value. The Additional
S.D. shall be recovered from the running bill. When the total of any of work done by the
Contractor up to running bills under consideration is more than 5% of the contract value.
However, such S.D. shall be recovered in the round figure of Rs. 1000/- i.e. the amount of work
done when it exceeds 5% of the contract value it shall be refunded of to the nearest multiple of
Rs.25000/- such additional S.D. shall be recovered for the works amount to Rs. 5 Lacs or more at
the rate of 4% of the additional amount.
(iii) In many cases, the contractors are stopping the work half-way due to number of reason and
when the department has to take actions in accordance to clause 3(a) or (b) or (c) of the
contract the remaining work has to be carried out by advertising the tender for the remaining
work and the whole administrative process right from inviting tenders to finalising the tender etc.
In such cases a fixed amount of Rs.1000/- should be reversal from the original contract towards
the cost of advertisement and other administrative charges incurred by the department in finalising
the contract for the remaining work. In case a separate advertisement is issued for a single work
actual cost of advertisement shall be recovered such recovery shall be in addition to the recovery
to be made under clause-3 or such other relevant clauses.
In continuation of clause No.46(i) if any contractor found employing person or persons under the
age of 12 years, during course of the construction at any stage, legal actions shall be taken against
him as stipulated in Child Labour (Prohibition & Regulation) Act 1986 and also, a penalty of
Rs.20,000/-(Rupees Twenty thousand) shall be imposed which shall be deposited with District
Collector in Child Labour Rehabilitation cum Welfare Fund.
GC-150 EVALUATION OF SUBMITTED QUALIFICATION OFFER BASED ON
SUBMISSIONSMADE BY THE TENDERER
The tenderer shall be fully responsible for correctness of submissions made whether same has
been examined and approved by employer or not. In the event of misrepresentation or suppression
of the matter/ fact by the tenderer, the action will be taken on the wrong tenderer as per procedure/
provision outlined in the tender document. Price bid will be opened of those tenderers, whose post
qualification bids meet requirements of the qualifying criteria as laid down in tender
GC-151 RESPONSIBILITY OF CONTRACTOR UNDER CONSTRUCTION AND
DEMOLITION WASTE (C & D WASTE) RULES
• Contractor shall remove all condtruction and demolition waste (C & D waste) and clean
the area every day, or depending upon (1) The type & schedule of the work, (2) The
quantity and type of waste generated, appropriate storage and collection facility shall be
developed at site. Reasonable timeframe shall be worked out in consultation with engineer
in charge of the project, for storage & usage of C & D waste.
• If it's found that contractor is irregular and showing negligence to management of C & D
waste, them if deem fit, engineer in charge would arrange to dispose the said C & D waste
through an authorized C &D waste contractor/agency of surat municipal corporation and
all the expenditure made towaers disposal of this C & D waste shall be recovered from the
contractor as per the prevailing charges.
• Contractor shall have to bear the expenses towards management of C & D waste as per the
prevailing norms, no extra payment shall be entertained for the same.
• Contractor shall keep record of generation and disposal of construction and demolation
waste (C & D waste) and proof of its disposal as per the provision of C & D waste rules
and he has to submit alone with running bills.
• If contractor fails to upkeep and maintain records of C & D waste generation- disposal
records etc., Than it shall be calculated as per the provision of the standing committee
resoluction no 1621/2016, dt.01/10/2016 and charges shall be recovered from due of
contractor with surat municipal corporation.
Contractor shall also ensure use of recycled products made from SMC authorized C & D waste
agency as far as possible to promote the C & D waste management project.
EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
The Surat Municipal corporation shall not issue cement and reinforcement steel
Contractor shall make his own arrangement to procure all materials, cement and
reinforcement steel.
The cement to be used shall be 53 The reinforcement steel i.e. HYSD bars
grade Cement and out of following shall be only of following makes and shall
brands only: be Thermo-Mechanically treated (TMT).
4. Electrotherm(India) Ltd.
6. JSW Steel Ltd.
8. Gallant Metal Ltd.
9. Polaad TMT Steel
The brands for structural steel to be used shall be of make TATA, Jindal, SAIL or Asian.
All structural steel shall conform to I.S. 226-1975. The steel shall be free from the defects mentioned in
I.S. 226- 1975 and shall have a smooth finish. The material shall be free from loose mill scale, rust pits
or other defects affecting the strength and durability. Rivet bars shall conform to I.S. 1148-1992.
When the structural steel is supplied by the contractor test certificates of the manufacturers shall
be obtained according to I.S. 226-1975 and other relevant Indiand Standards.
Coloured galvanized Roofing sheet shall be of TATA or Jindal make trafford sheet
WASTAGE OF CEMENT AND REINFORCEMENT STEEL :
As the contractor is to bring the cement and steel, the question of considering the wastage on the basic of
issue rate does not arise i.e. no saparate payment shall be made for any kind of wastage in the materials.
The payment for reinforcement bar will be made on theoritical weight basis. The weight shall be computed
on the basis of the length of the steel used in the work multiplied by the standard unit weight of
MS/HYSD/TMT bar as mentioned in IS code No.1786.
The steel consumption eighter less than 7.5% of the standard consumption shall be penalised either at
the double existing corporation issue rate or the prevailing market rate, whichever is more.
Similarly, for cement also, the less consumption beyond 5% shall be penalised at the double existing
corporation issue rate or the prevailing market rate, whichever is more.
As per RAC/Out/No. 671, Dt.04/07/2026 Basic Rate for the month of July-2026 (1) High strenth TMT
steel Rs. 48,500/-(Without GST) Per MT (2) High strenth TMT CRS steel Rs. 51,000/-(Without
GST) Per MT (3) Cement is Rs. 5,600/-(Without GST) Per MT
Any of the above mentioned brands of Cement and Reinforcement steel shall only be used by the
contractor at the time of execution.
TESTING OF CEMENT AND STEEL AND OTHERS CONSTRUCTION MATERIALS :
It should be specifically noted that the cement and steel and others construction materials brought by the
contractor at site of work shall be used only after the same is tested at the approved laboratory as per the
direction of the Engineer- in-charge. Such approved laboratory may be located at Surat, Baroda,
Ahmedabad or Mumbai.
All the charge for the transport and testing of the samples shall have to be borne by the contractor. The
frequency of testing such material shall be in accordance to the relevant Indian Standards as directed by
Engineer-in-charge.
EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION
Signature of the Contractor:-
(1) General Description of the Work : Proposed Furniture Work of Suman School
At Plot No. 1/A Paikee, Beside NPSS School
No. 312/232, Ganeshpura (G.H.B) In North
Zone (Katargam), Surat.
(2) Estimated Cost : Percentage Rate Tender
(3) Earnest Money Deposit : Rs.
(4) Security Deposit
(i) Initial Security Deposit : Rs. 2% of the Tender Value.
Percentage to be retained from : Rs. 5 % ( Retention ) + Rs. 2 % ( as S.D) = Total 7%
running bills (Seven Percentage)
Time allowed for the completion : 10 (Ten) months
of the Work from date fixed in
Work Order Letter to commence
Percentage to be retained from : (1) In Case of Bank Gaurantee – 2% Retention from
Final Bill Final Bill (Initial S.D as B.G will be Released after
Payment of Final Bill and 2% Retention will be
Released after Completion of Defect Liability
Period and Audit Related Procedures, whichever
(2) In Case of F.D.R – N.A (F.D.R will be Released
after Completion of Defect Liability Period and
Audit Related Procedures, whichever complies
(5) Panelty for delayed Work : 0.2 % ( Zero point Two percent ) of the Tender Value
per day, maximum up to 10 % ( Ten percent ) of the
(6) The progress of the Work shall
confirm to the following schedule
(7) ¼th of the Work in : 1/4th of the time.
(8) ½ of the Work in : 1/2 of the time.
¾th of the Work in : 3/4th of the time.
Defect Liability Period :- 12 (Twelve) Months.
(9) Water Charges :- CONDITION FOR THE WATER SUPPLY &
ELECTRIC SUPPLY on next page.
(10) Construction Cess :- Applicable at 1% on Amount of Work Done
SIGNATURE OF THE CONTRACTOR. EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
NAME AND ADDRESS :- SURAT MUNICIPAL CORPORATION
SURAT MUNICIPAL CORPORATION
NORTH ZONE(KATARGAM)
CONDITION FOR THE WATER SUPPLY & ELECTRIC SUPPLY
FOR WATER CHARGE (As per City Engineer Note No.386, dtd.30/7/2012)
In case of Municipal Network or distribution center availe or not at near by area
Contractor has to make his own arrangement for construction work whether from private
boring or tankers. Contractor has to submit test report of water weather it is of good
quality for construction work or not and contractor has to inform about it within 30 days
of starting the work.
If contractor wants to use Municipal Water he has to follow procedure within below:
1. Contractor has to apply for water connection by Municipal Licenced plumber in
prescribed form.
2. Contractor has follow all procedure with his own expenses.
3. According to rule Municipal Corporation issue bill to contractor for consumption of water
and contractor has to paid it within stipulated time and contractor has submit one copy of
bill and payment receipt to concern department. If contractor fail to pay the bill the
amount of bill/paid receipt can be recover from contractor's bill.
4. If Municipal Corporation network is not available then Contractor can make
arrangement of water tanker from nearby distribution center after depositing required
5. After completion of work contractor has to cancelled the water connection and inform the
concern department.
6. If network and distribution center/network are both not available in that case contractor
has to make his own arrangement for good quality construction water and has to follow
(2) The contractor shall make his own arrangement at his cost for electric supply required for
operating various plants and machineries required for the works and for general lighting
purpose for site, office labour colony etc.
The energy bills shall also be paid by the contractor.
EXECUTIVE ENGINEER,
NORTH ZONE (KATARGAM)
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
IMPORTANT INSTRUCTION-A TO THE CONTRACTOR
(1) This tender document containing Page No.01 to ... duly signed by the tenderer, should be
furnished to Corporation treasury along with the amount of earnest money deposit as
mentioned in tender notice. If any of the drawings or papers removed from the tender, the
tender shall be rejected and E.M.D. shall be forfeited.
(2) The tenderer who wants to propose something in written, he should write it on his letter
pad or another paper. Anything written on tender papers shall not be considered by
Corporation and Contractor shall not be intend to do so.
(3) Following Certificate shall be enclosed with tender.
(a) Solvency Certificate amounting of 20% of tender amount.
(b) Registration Certificate of required class given by Government or Semi-
Government firm.
(c) Income-Tax clearance certificate.
(d) List of work done by Contractor with its volume.
(4) This is annual rate contract, It the work given to one or more Contractors, the time limit
shall be as per memorandum of the tender.
EXECUTIVE ENGINEER
NORTH ZONE(KATARGAM)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
IMPORTANT INSTRUCTION-B TO TENDERER
Affix latest passport
tenderer duly signed
Specimen Signature of the Contractor
AFFIX LATEST PASSPORT SIZE PHOTOGRAPH OF ALL PARTNERS IN CASE
OF PARTNERSHIP AGENCY
Specimen signature of all partners incase of partnership agency.
(1) Submission of Registered Agreement is
compulsory in case of partnership
3. Submission of audited account balance sheet of last three years is complusery for tenderer
submitting agency.
4. Submission of sale tax certificate, with proof of residence is compulsary for tenderer.
5. In case of Government royalty applicable to tenderer, it is compulsary to submit a receipt of
royalty payment with tender.
6. The Photograph and specimen signature of contractor will be cross checked, whenever contractor
receives payment in account section of S.M.C.
7. The specimen signature of contractor will be cross checked by Account Department of
S.M.C., in case of representative of Contractor alongwith letter of authority of a person who
signed an agreement, receives payment.
Executive Engineer
North Zone(Katargam)
Surat Municipal Corporation
Signature of the Contractor:-
(1) The work shall be carried out strictly accoriding the specifications given in Bombay Public
Works Department Hand Book Vol.1 and II (The latest edition) whenever applicable as directed
by Executive Engineer.
(2) The work shall have to be started by the contractor at as many places as ordered by the
Executive Engineer.
(3) If during excavation or carrying out of any item of the work, any electric pole, electric cable,
telephone cables, telegraph cable, gas line, drain connection pipeline,water service pipeline, sewer
main, water mains,etc. is/are damaged by the contractor shall be liable to pay the full
expenditure required and to repair the same or charges for the same (as the case may be )
decided by the electric company, Gas Company, Government Authority or the Surat Municipal
Corporationwhich ever may be.
(4) The work shall be carried out in workman like manner, and best skilled worker should be
employed. If any defect in the work is found out the contractor shall have to rectify within the
time fixed by Executive Engineer. If he fails to rectify the defect Executive Engineer after giving
due notice shall rectify the defect at the risk and cost of the contractor.
(5) All the work shall be done strictly according to the instruction of Executive Engineer.
(6) No compensation shall be paid if the work is stoped due to defective work or as per the
instruction from Engineer-in-charge due to any reasons.
(7) The rates given in the schedule shall hold good for all works done under this contract without
reference to quantities or location of work.
(8) The contractors are particularly directed to observe from the specification what is to be
included in the items and rates for the serveral portion of the work frame out all their rates for
items accordingly.
(9) The date of starting of the work is considered to be the date specificied in the final work order.
(10) If any Clause of Arbitration is there in tender document is deleted here with.
(11) The project under this tender may be executed under strict supervision of P.M.C. if deployed
by S.M.C. Contractor shall carryout the instructions of P.M.C.
(12) Third Party Inspection shall be deployed by S.M.C.
(13) The contractor shall submit the advance Pour Card in prescribed form for the type of work which
he planned to carryout with the skilled / unskilled labour deployed by him for the work.
(14) The contractor shall establish concrete cube testing machine and other equipments required for
quality checking of materials as per instructions of PMC/ Engineer-In-charge.
(15) The contractor shall use the materials of the specified brands only. Request for equivalent brands
will be considered only if specified brand is not available in market.
(16) ACCIDENT LIABILITIES:
The Contractor shall be responsible for all liabilities under workman compensation act, as under:
(a) On occurrence of accident, resulting in death of workman employed by the Contractor which
is so serious as is likely to result in death of such workman who meet with accident, the
Contractor shall within 24 hours of accident, will intimate in writing to Engineer-in-charge of
such incidence. The Contractor shall indemnify client, against all looses/damages sustained by the
client resulting directly or indirectly from his failure to give such intimation to client including
penalties/fins if any, payable by client as a consequence of client's failure to give notice under
workman’s compensation act or otherwise to conform the provision of this act in regard to such
(b) In case when such compensations as above becomes payable under workman’s compensation
act, whether by contractor or by client as principal employer, it shall be law full for the Engineer-
in-charge to retain out of money due and payable to the Contractor, such sum or sums of money as
may in the opinion of the Engineer-in-charge be sufficient to meet such a liability, the opinion of
the Engineer-in-charge shall be final in regard to all matters arising under this clause.
(17) INSURANCE:
The Contractor shall take "All Contract Risk Insurance Policy" for the estimated cost of this work
"Work's Man Compensation Policy" for all workers and labours of contractor and client working at
site and "Third Party Insurance Policy" to fully cover all third party type risk. The insurance policy
so taken by the Contractor for such purposes shall be in the joint name of the Contractor and the
client and the policy shall be deposited with the client.
Contractors shall have to use maximum machinery for the work as per the direction of Engineer-
In-Charge. If possible, space for stacking the surplus excavated earth will be provided by SMC.
Otherwise the contractor shall arrange for the same at no extra cost to SMC.
(18) Contractor has to fixed display board describing the necessary information / particulars of work at
specific location and shall submit the evidence to engineer-in-charge along with
photographs.otherwise , 0.25% to 1.0% of tender amount as per description of engineer-in-charge
shall be kept hold,while making payment to the contractor until the evidences as stated above is
submitted. No extra payment shall be payable for fixing display boards.
(19) The Contractor shall paint building numbers & Flat numbers as per guideline of SMC without any
(20) PLEASE READ CAREFULLY
Following details pertaining to work progress is mandatory.
(A) Bar chart: Contractor shall submit barchart showing schedule of execution of various
activities within stipulated time limit
(B) Material Management : Contractor shall provide following details
• Source of materials i.e. yellow earth, Coarse aggregate, Grit, fine aggregates,
bricks, cement, steel etc.
• Supply schedule : According to bar chart, the flow diagram of materials.
(1) Man power management :
The contractor shall submit details of manpower of various categories (skilled & unskilled
labours) to be deployed for the work as under.
• Minimum no. of skilled and unskilled labors to be deployed on the work
• List of supervisors & engineers for supervision & quality control of the work.
(21) All the applicant contractors are required to have their own employers code number under EPF
Act, 1952 and are required to comply the applicable provisions of said statute regularly and totaly.
(22) Further the contractors for services are required to produce the certified copies of paid challans in
respect of employees/workers employed by said contractor in respect of work allotted by Surat
Municipal Corporation, along with copies of Pay Roll and Muster Roll. If the same are not
produced, the bills will not be released.
Executive Engineer
North Zone(Katargam)
Surat Municipal Corporation
SIGNATURE OF THE CONTRACTOR.
SPECIAL CONDITIONS OF CONTRACT
Clause given under these special conditions shall be read in conjunction with conditions of
the contract and in case of any conflict the provisions of special conditions will override
the provisions of general conditions of contract.
The tenderer shall acquaint himself with the access to site, availability of local facilities
such as transport, materials, labour and shall price his tender accordingly.
1.2 ROAD INFRASTRUCTURE :
The bidder shall acqaint himself with the access to site. The successful tenderer shall have
make road and other infrastructure facility for the easy access to the site at his own cost.
All the safety and entry rules shall be strictly followed. The contractor is fully
responsible for the safety of his staff and workmen and must equip them with safety
appliances and tools.
1.4 TIME SCHEDULE :
The work shall be executed strictly as per the time schedule/bar chart submitted
alongwith price bid offer. The entire job/project has to be completed within a period of
(Twelve) months from the Date of placement of order .The time limit includes the time limit
required for testing, rectification, if any, retesting and completion in all respect to the entire
satisfaction of the Engineer-in-charge. The timely completion of this project is very very
important for the citizen of Surat City, and hence weightage will be given on strict
compliance of work as per the sanctioning schedule of work/bar chart.
1.5 Penalty for delay :
If the contractor fails to complete the whole project by the stipulated completion date, he
shall also pay liquidated damages at one fifth of one percent i.e. 0.2% of tender amount per
day of delay in completion and handing over the work to the Surat Municipal Corporation.
The amount of liquidated damages shall however be subjected to maximum of ten (10)
percent of the tender amount. Delays in excess of one hundred days will be a cause for
termination of contract and for feiture of all per performance security.
1.6 Scope of Supply of material :
(a) Supply of material :
All materials, consumables, testing applicances, tools, tackles and spares etc. necessary for
the successful execution completion, and maintenance till handing over to S.M.C. shall be
procured and provided by the tenderer. No materials will be supplied by the owner. Except
mention in Schedule -`A.
Contractor shall have to make his own arrangement for water required for construction, testing
and for his labour/employees too.
Power required for the constructions, erection and other allied job shall be arranged by the
contractor at his own cost.
The Contractor shall have to make his own arrangement for getting electric power. The
S.M.C. will issue only recommendation letter to the contractor if required. No
compensation shall be paid for delay in getting power supply.
Cement required for the construction shall be arranged by the contractor at his own cost.
All types of TMT reinforcement steel shall be arranged by the contractor at his own cost.
1.7 Construction of Stores and site office :
Suitable areas will be allocated by the S.M.C. to the Contractor to build storages for storing his
equipments, plant, materials etc. and also to build his site offices. He will be solely
responsible for watching and guarding of his stores, offices etc.
The contractor shall cover all his equipments and materials at site with requisite insurance
against theft, larceny, decoity, fire tempest, flood earthequake etc.
On completion of the works undertaken by the contractor, he shall remove all temporary
works erected by him and have the site cleaned as directed by the Engineer. The S.M.C.
reserves the right to ask the contractor any time during the tenure of the contract to vacate the
land by giving 7 day's notice on security reasons or on national interest or otherwise.
1.8 Labour and supervisory Camps:
No land will be provided by the S.M.C. to the Contractor for constructing his labour and
supervisory camps and other service facility. Contractor shall make his own arrangements
outside the site boundary.
1.9 Construction Equipments :
The contractor shall make his own arrangement to procure all constructional plant and
equipments for his own. He shall also state the type and number of different equipments
with their capacities in good working conditions which he will use on the site to ensure
completion of the work in the specified time.
All materials, construction plants and equipments once brought by the contractor to site are
not to be removed from there without the written authority of the Engineer-in-charge. Also,
the Contractor shall have adequate stock of spare parts for the equipment on the site and work
shall not be delayed on this account. Similarly all temporary works built by the Contractor
for the main construction undertaken by him, are not be dismantled and removed without the
written authority of the the Engineer-in- charge.
1.10 Co-operation with other contractors :
The contractor shall execute his work in phased manner as directed by the Engineer from time
to time so as not to obstruct or retard the work being executed simultaneously by other
The contractor shall be responsible for provision of safety arrangement and protective
clothing for all operators on the site whether or not engaged in actual operation of
supervision. The contractor shall also be responsible for safety arrangmenets of all
equipment used for construction and shall employ trained workmen conversent with
safety regulation. The contractor shall use only tested equipment and tools and shall periodically
renews tests to the satisfaction of the Engineer. All test certificate shall be made available to the
Engineer at the site of the work. If at any time, in the opinion of the Engineer, this provision is
not completion with, the Contractor shall forthewith replace such equipment and tools.
The contractor shall display notices and arrange proper fencing at such places where
hazardous work is being carried out. The contractor shall provided at his own expense on the
works to the satisfaction of the Engineer at such places, proper and sufficient fire tighting, first
and applicances etc. which shall at all times be available for use.
1.12 The contractor shall have to take photographs during various stages of construction
activity for each of the work at no extra cost. The photograph shall be of size 4" x 6" on mat
paper. The number of photographs shall be not be less than
1.13 No mobilisation advance will be paid.
1.14 It is further to clarify that, the retention money deducted from each running bill will be
released at the time of final bill. The security deposit remitted by the contractor will be
released after the completion of defect liability period.
1.15 No compensation of any item shall be paid in case any of the item is omited i.e. not executed
1.16 It is clarify once again that, the serviceable materials obtained during dismentaling/clearing
of the site or the extra excavated stuff shall have to be carted by the contractor at the places
shown by the Engineer-in-charge any where within city limit.
1.17 Out of the amount payable/creditable to contractor's account, the Central Government/State
Government tax/taxes shall be deducted at source in accordance with the relevant laws/rules
from time to time prevailling.
1.18 Surat Municipal Corporation shall not provide `C' form for tax purpose.
Executive Engineer
North Zone(Katargam)
Surat Municipal Corporation
Signature of the Contractor:-
SPECIFICATIONS OF MATERIALS
Note:- Consider latest revision of the said I.S. wherever its applicable.
1.1 The Plywood for general purpose shall conform I.S. 303-1975. Plywood is made by
cementing together thin boards or sheets of wood into panels. There are always an old
number of layers 3, 5, 7, 9 ply etc. The plies are placed so that the grain of each layer is at
right angles to the grain in the adjacent layers.
1.2 The chief advantage of plywood over a single board of the same thickness is the more uniform
strength of the plywood along the length and width of the plywood and greater resistance to
cracking and slitting with change in moisture content.
1.3 Usually synthetic resins are used for gluieg. Phenolic resins are usually cured in a hot
press which compresses and simultaneously heats the plies between hot plates which
maintain a temperature of 90 degree C. to 140 degree C. and a pressure of 11 to 14 Kg./Sq.cm.
on the wood. The time of heating may be any thing from 2 to 60 minutes depending upon
1.4 When water glue are used the wood absorbs so much Water that the finished plywood must be
dried carefully, When synthetic resins are used as adhesive the finished plywood must be
exposed to atmosphere of controlled humidity until the proper amount of moisture has been
1.5 According to I.S. : 303-1975 the plywood for general purpose shall be of three grades namely
BWR.WWR and CWR depending upon the adhesives used for bonding the veneers and it will
be further classified into six types namely AA, AB, AC, BB, BC and CC based on the quality
of the two faces, each face being of three kinds namely A, B and C. After pressing, the finished
plywood should be reconditioned to a moisture content not less than 8 percent and not
more than 16 percent..
1.6 THICKNESS OF PLYWOOD BOARDS
Board Thickness
2.1 All glass shall be of the best quality, free from specks, bubbles, smokes, veins, air holes
blisters and other defects. The kind of glass to be used shall be as mentioned in the item or
specification or in the special provisions or as shown in detailed drawings. Thickness of glass
panes shall be uniform. The specifications for different kinds of glass shall be as under ----
2.2 Sheet Glass :
2.2.1 In the absence of any specified thickness or weight in the item or detailed specifications of
the item of work, sheet glass shall be weighing 7.5 Kg./Sq.m. for panes upto 600 mm. x
2.2.2 For panes larger than 600 mm. x 600 mm. and upto 800 mm. x 800 mm. glass weighing not
less than 8.75 Kg./Sq.m. shall be used. For bigger panes upto 900 mm. x 900 mm. glass
weighing not less than 11.25 Kg./Sq.m. shall be used.
2.2.3 Sheet glass shall be patent flattened glass of best quality and for glasing and framing purposes
shall conform to I.S. 761-1960. Sheet glass of the specified colours shall be used, if so
shown on detailed drawings or so specified. For important buildings and for panes with any
dimensions over 900 mm. plate glass of specified thickness shall be used.
2.3.0 Plate Glass :
2.3.1 When plate glass is specified it shall be "Polished Patent Plate Glass" of best quality. It
shall have both the surface ground flate and parallel and polished to obtain clear
undistured vision and reflection. The plate glass shall be of the thickness mentioned in the
item or as shown in the detailed drawing or as specified. In the absence of any specified
thickness, the thickness of plate glass to be supplied shall be 6 mm. and a tolerance of
mm. shall be admissible.
2.4.0 Obscured Glass :
2.4.1 This type of glass transmits light so that vision is partially or almost completely obscured.
Glass shall be plain rolled, figured, ribbed or fluted, or frosted glass as may be specified as
required. The thickness and type of glass shall be as per details on drawings or as specified
or as directed.
2.5.0 Bajari Glass :
Glass shall be with bajari pattern embedded in a sheet of plane glass. It should be of best quality as
approved by Engineer-In-Charge. Thickness of glass shall not be less than 4 mm. bajari glass shall
be of type and thickness as specified.
M-3 ACRYLIC SHEETS :
3.1 Acrylic sheets shall be of thickness as specified in the item and of a specified shape and
size as the case may be Penels may be flat or curved. It should be light in weight. It shall be
colourless or coloured or opaaue as specified in the item. Colourless sheet shall be as
transparent as the finest optical glass. Its light transmission rate shall be about 95%.
Transparancy shall not be affected for the sheets of larger thickness. It shall be extremely
resistant to sunlight, weather and low temperatures. It shall not show any significant
yellowing or change in physical properties or loss of light transmission over a longer period of
The sheet shall be impact resistant also. Sheets should be available in complete range of
standard transparent, translucemtn and opaque colours. Sheets should be available in complete
range of standard transparent, translucent and opaque colours. Sheets shall be of such quality
that they can be cut, bent and jointed as desired. Solution for the joints shall be used as per the
requirement of manufacture.
M-4 PARTICLE BOARD :
4.1 The particle boards used for face panels shall of best quality free from any defects. The particle
boards shall be made with phenolmaldehyde adhesive. The particle boards shall conform
to I.S. 3087-1965. "Specification for wood particle board for general purpose." The size
and the thickness of the particle board shall be as specified.
M-5 CEMENT BONDED PARTICLE BOARD :
1. The particle board should confirm to IS-14276-1995 or latest.
2. It should be free from any cracks and flacks.
3. Cement bonded Particle board may be replaced by any other equivalent material as suggested
Engineer-In-Charge
M-6 EXPANDED POLYSTYRENE OR FRAMES STYROPER SLEBS :
6.1 The expanded polystyrene ceiling boards and tiles shall be of approved make and shall be of size
thickness, finish and colour and indicated. It shall be of high density and suitable for use
as insulting material. The insulting material shall be like slab of thermocole etc.
M-7 RESIN BONDED FIBRE GLASS :
7.1 The resin bonded fibre glass tiles or rools shall be of approved make and shall be sizes, thickness
and finish as indicated.
7.2 For test of Mineral wood thermal insulation Blanket I.S. 3144-1965 followed.
7.3 Insulation wool blanket shall be with the following coverings on one or both sides as indicated.
(1) Bituminised bessian kraft paper suitable for use in position where moisture has to be excluded.
(2) Hessain cloth or Kraft paper for keeping out dust.
(3) G. I. wire netting, suitable or surfaces to be plastered over.
M-8 FIXTURES & FASTENINGS :
i] The fixtures and fastenings, that is, butt, hingers, tee and strap hinges, sliding door bolts,
tower bolts, door latch, bath-room latch, handles, door stoppers, casement window
fasteners, casement stays and ventilator catch shall be made of the metal as specified
in the item or its specifications.
ii] They shall be of iron, brass, aluminium, chromium plated iron, chromium plated brass,
copper oxidised iron, copper oxidised brass or anodised aluminium as specified.
iii] The fixtures shall be heavy, medium or light type. The fixtures and fastenings shall be
smooth finished and shall be such as will ensure ease of operation.
iv] The samples of fixtures and fastenings shall be got approved as regards quality and shape
before providing them in position.
v] Brass and anodised aluminium fixtures and fastenings shall be bright finished.
i] Holdfasts shall be made from mild steel flat 30 cm. length and one of the holdfasts shall be
bent at right angle and two nos. of 6 mm. dia. hooles shall be made in it for fixing it to the
frame with screws. At the other end, the holdfast shall be forked and bent at right angles in
opposite directions.
i] Railway standard heavy type butt hinges shall be used when so specified.
ii] Tee and strap hinges shall be manufactured from M.S. sheet.
Sliding Door Bolts (Aldrops) :
i] The aldrops as specified in the item shall be used and shall be got approved.
Tower Bolts (Barrel Type) :
i] Tower bolts as specified in the item shall be used and shall be got approved.
i] The size of door latch shall be taken as the length of latch.
Bathroom Latch :
i] Bathroom latch shall be similar to tower bolt.
i] The size of the handles shall be determined by the inside grip length of the handles.
Handles shall have a base plate of length 50 mm. more than the size of the handle.
Door Stoppers :
i] Door stoppers shall be either floor door stopper type or door catch type. Floor stopper shall be
of overall size as specified and shall have a rubber cushion.
i] Door catch shall be fixed at a height of about 900 mm. from the floor level such that one part of
the catch is fitted on the inside of the shutter and other part is fixed in the wall with
necessary wooden plug arrangements for appropriate fixity. The catch shall be fixed
mm. inside the face of the door for easy operation of catch.
Wooden Door Stop With Hinge :
i] Wooden door stop of size 100 mm. x 60 mm. x 40 mm. shall be fixed on the door frame with a
hinge of 75 mm. size and at a height of 900 mm. from the floor level. The wooden door stop
shall be provided with 3 coats of approved oil paint.
Casement Window Fastner :
i] Casement window fastener for single lead window shutter shall be left or right handed as directed.
Casement Stays (Straigot Peg.Stay) :
i] The stays shall be made from a channel section having three holes at appropriate position so
that the window can be opened either fully or partially as directed.
Size of the stay shall be 250 mm. to 300 mm. as directed.
Ventilator Catch :
i] The pattern and shape of the catch shall be as approved.
i] The base and socket plate shall be made from minimum 3 mm. thick plate, and projected pivot
shall not be less than 12 mm. dia. and 12 mm. length and shall be firmly riveted to the base
plate case of iron pivot and in single piece base in the case of brass pivot.
9.1 Oil Paints :
Oil paints shall be of the specified colour and shade, and shall be of Asian, ICI, Nerolac, Dulux or
equivalent as approved by Engineer-In-Charge. The ready mixed paints shall only be used.
However, if ready mixed paint or specified shade or tint is not available white ready mixed paint
with approved stainer will be allowed. In such a case, the contractor shall ensure that the
shade of the paint so allowed shall be uniform. All the paints shall meed with the
following general requirements ---
i] Paint shall not show excessive setting in a freshly opened full can and shall easily be
redispressed with paddle to a smooth homogeneous state. The paint shall show no curdling,
livering, caking or colour separation and shall be free from lumps and skins.
ii] The paint as received shall brush easily, possess good levelling properties and show no
running or sagging tendencies.
iii] The paint shall not skin within 48 hours in a three quarters filled closed container.
iv] The paint shall dry to a smooth uniform finish free from roughness, grit uneveness and other
Ready mixed paid shall be used exactly as received from the manufacturers and generally
according to their instructions and without any admixtures whatsoever.
9.2 Enamel Paints :
The enamel paint shall satisfy in general requirements as mentioned in specification of oil
paints. Enamel paints shall conform to I.S. 2933-1975.
M-10 FRENCH POLISH :
The french polish of required tint and shade shall be prepared with the below mentioned
ingredients and other necessary materials :
i] Denatured spirit of approved quality.
The french polish so prepared shall conform to I.S. 348-
M. 11 ACRYLIC EMULSION PAINTS :
11.1. It shall be from ICI, Nerolac, Asian Paints, Berger or equivalent, as approved by the
Architect and Engineer-in-Charge. It shall conform to the relevant IS codes.
11.2. It shall be used on both interiors and exteriors, on all different types of plaster, wooden surfaces,
stone, brickwork, asbestos cement sheets, hard and soft boards, etc. It shall render rich smooth
finish and shall provide a tough film that forms a suitable protection against all elements.
11.3. II shall be water thinnable. It shall require no primer. On a well prepared surface, it
shall be applied, after one coat of cement primer, in case it is an interior surface
and waterproof cement coating, in case it is an exterior surface. On a new but
highly absorbent surface, a thin coat of the same shall be applied by adding two
parts of water by volume to two parts of acrylic emulsion by volume. On previously
painted surfaces, one coal of the same shall be applied by thinning four parts of
the emulsion with one or two parts of water. It shall be applied by brush, roller or
spray. It shall have a covering capacity of 25 - 30 S.Mts./Liter, depending on the
surface and shade used. It can be washed to remove the day-to-day dirt, after the
surface has been painted, minimum for a month.
Executive Engineer
North Zone(Katargam)
Surat Municipal Corporation
Signature of the Contractor:-
GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS
1. In the specification "as directed"/"Approved" shall be taken to mean "as directed"/approved by
the Engineer-in-charge.
2. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
3. In "Mode of Measurement" in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular point or aspects
in the relevant Indian Standards shall be refered to.
4. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits :
( i) Length, width and depth (height ..... 0.01 Mt.
( ii) Areas ..... 0.01 Sq.Mt.
(iii) Cubic Contents ..... 0.01 Cu.Mt.
In recording dimensions of work.
The sequence of length, width and height (depth) or thickness shall be followed.
5. The distance which constitutes lead shall be determined along the shortest partical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
6. Where no lead is specified, it shall mean "all leads".
7. Lift shall be measured from plinth level.
8. Definite particulars covered in the items of work, though not mentioned or elucidated in its
specifications shall be deemed to be included therein.
9. Reference to specifications of materials as made in the detailed specification the items of works
is in the form of a designation containing the number of the specification of the material and
perfix `M' e.g. `M-s'.
10. Approval of the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to
any payment or compensation whatsoever on account of any such materials being rejected by the
Engineer-in-charge.
11. The contract rate of the item of work shall be for the work completed in all respects .
12. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
13. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign
matter and to ensure the preservation of their quality and fitness for the work.
14. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
15. No materials shall be stored prior to, during and after execution of a structure in such a way as
to cause or lead to damage on overloading of the various components of the structure.
16. All work shall be carried out in a workmanlike manner as per the best techniques for the
particular item.
17. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works during execution shall be kept in
sufficient numbers and in good working condition on the site of the work.
18. The mode procedure and manner of, execution shall be such that it does not cause damage or
over-londing of the various components of the structure during execution of after completion
of the structure.
19. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides swatisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not, however, absolve the contractor of the responsibility of any
adverse effects and consequences of adopting the same in the course of execution of completion of
20. All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
21. The contractor shall be responsible for observing the rules and regulations imposed under the
"Minor Minerals Act", and such other laws and rules prescribed by Government from time to time.
22. All necessary safety measures and precautions (including those laid down in the various
relevent Indian Standards) shall be taken to ensure the safety of men, materials and machinery on
the works as also of the work itself.
23. The testing charges of all materials shall be borne by the Contractor.
24. Approval to any or the executed items for the work dose not in any way releive the contractor
of his responsibility for the correctness, soundness and strength of the structure as per the
drawings and specifications.
Executive Engineer
North Zone(katargam)
Surat Municipal Corporation
Signature of the Contractor:-
ITEMWISE DETAILED TECHNICAL SPECIFICATIONS
Providing and fixing powder coated aluminium windows having two tracks with
aluminium sections of Hindalco, Jindal, Narmada, Banco or equivalent approved
make 61.85 mm x 31.75 mm weight 0.695 kg/mtr for top track and weight
kg/mt for bottom track, shutter framing size 40 mm x 18 mm, (weight
kg/mt), interlock
.547 kg/mt., sliding on bearing all sections are of powder coated of approved shade
including 5 mm clear plain sheet glass, PVC track gasket, EPDM rubber gasket on
glass of weather tightening along with locks, handles as approved including sealing
gap with marble or any other surfaces with silicon sealants making it water proof in
all manner, etc. complete at all floor levels. (colour anodized)
Matt anodized allumium sliding windows shall be made of extruded alluminium
sections having thickness not less than 1.5 mm and matt finished colour anodized
not less than 20 micron.
The glass 5 mm thick float Saint/Gobain glass white or colour as directed.
At bottom drain section shall be used to drain out rain water. The draina track shall
be two track 62 mm x 31.75 weighing not less than 0.695 Kg/mt. The and side track
s shall not be weighing less than 0.601 Kg/meter and thickness shall not be less than
1.5 mm. The work shall be carried out as directed by Engineer-in-charge or
Shutter Frame Work :- The fully glazed shutter frame shall be made from top and
bottom section weighing not less than 0.464 Kg/meter. having bearing of Durlin or
Nylon 66. All the fixture, fastener bearing, locks, handle, gaskets shaoul be used
after getting approved from Engineer-in-charge and architect. The handle section
shall be weighing not less than 0.417 Kg/meter. The interlock section shall be
weighing not less than 0.464 Kg/mt. and having thickness of 1.5 mm. The glass
panel shall be fixed in frame work using EPDM gaskets.
The whole assembly of window shall be fixed in best workman like manner to have
smooth operations. All the windows shall be sealed to the R.C.C. or brick work with
silicon sealents of dow corning or Wacker Germany as approved by Engineer-in-
charge or his consultant.
The rate shall be for a unit of one square metre.
Providing & fixing partly panel & partly glass aluminium doors with aluminium
section of Hindalco, Jindal , Narmada,Banco or Equivalent approved make having
Plain anodized outer frame section of 63.50 mm x 38.10 mm having weight
kg. / R.M. shutter section having size 83.5 mm x 44.45mm ( top & bottom:
kg./rmt. and middle 1.139 kg./rmt.) door vertical 47.62mm x 44.45 mm (
vertical:0.881 kg./rmt. & top hing side:0.974 kg./mt.)with 5mm thick sheet glass in
acid frogting and 12 mm thick prelaminated sheet of Greenlam, Panama or archid
make as approved by Engineer-in-charge including fixing brass pivot, handle, lock
(A) Same as above but
Colour anodized
Aluminium door and frame shall conform to M-31. Sheet glass shall conform to
M-38.2, Rubber gasket as per the detail or instruction given by the site in charge.
Preparing the surface for the fixing of aluminium frame. Providing and fixing
aluminium door frame as per the details of instruction given by the site in charge
with proper alignment and precautions. Providing and fixing sheet glass with acid
frosting as per archtects details and as per the details or instruction given by the
Engineer in charge with necessary precautions. Aluminium doors, frame, glass etc.
shall be cleaned after the completion of the work as per the instruction of Engineer
MODE OF MEASURMENT AND PAYMENT :
Rates include all materials, labour, tools including providing and fixing aluminium
sheet, nails etc. complete. The measurement shall be taken for the finished product.
The rate shall be paid per Sq.mtr.
Providing & fixing Plain anodized aluminium partly glazed and partly panelled
partition using medium duty sections of Hindalco,Zindal, Narmada, Banco or
Equivalent approved make having section 63.50 mm x 38.10mm ( Frame-.758
kg/rmt & Middle section- 0.819 Kg./rmt) with 5 mm thick clear float glass of
approved make including all other necessary fittings and fixtures. Entire work will
have to be made water proof using necessary rubber sectioned wherever required.
Gaps all round the frame to be filled with approved water proof sealent. Bottom
portion of doors both side to be covered with 12mm thick prelaminated particle
board of approved make and quality and as per design.
(A) Same as above but Colour anodized
Details specification same as per Item Description and as directed by Engineer-in-
MODE OF MEASURMENT AND PAYMENT :
Rates include all materials, labour, tools including providing and fixing
aluminium sheet, nails etc. complete. The measurement shall be taken for the
finished product.
The rate shall be paid per Sq.mtr.
Dismentalling doors, windows vantilators etc. (wood of steel)
shutters inclu. Chowkhats,architraves,holdfasts, and other
attachment etc.comp. and stacking then within all lead and lift
(1) exceeding 3 sq. mt. in area.
The relevant specifications of Item No.112 shall be followed but read doors, windows
vantilators instead of
R.C.C. work. The unserviceable materials shall be disposed of at all leads and lifts.
The rate excludes scraping straightening of reinforcement but includes cutting of
The rate shall be for a unit of one Number.
Supply & Fixing of 16mm.th.Armstrong classic Lite square edge mineral fiber
celling with 24mm grid(local) G.I. Frame girid consist of 600mm x 600mm.
tecno grid pre coated main runner 38 x24x3600mm,cross T
30x24x1200mm,cross runner 24x24x600mm,wall Angle 24x24mm.required length
suspension wire of 2.50mm G.I. and necessary hardware etc.comp.approved by
engineer-in-charge
Details specification same as per Item Description and as directed by Engineer-in-
MODE OF MEASURMENT AND PAYMENT :
Rates include all materials, labour, tools including providing and fixing
aluminium sheet, nails etc. complete. The measurement shall be taken for the
finished product.
The rate shall be paid per Sq.mtr.
Providing & laying commercial white marble for storage at all floor level, over 16mm
av. Th. Base of
C.M. 1:6 (1 cement : 6sand) laid over & joined with grey cement slurry incl.
rubbing & polishing etc. comp. at all floor
41.1.0 Materials :-
Water shall conform to M-1.Lime mortar shall conform to M-10 cement
mortar shall conform to M- 11 polished kota stone shall conform to M-49.
Each slab shall be cut to the required size and shape and fine chisel dressed
at all the edges. The sides thus dressed shall have a full contact if a straight
edge is laid along. The sides shall be table rubbed with on coarse sand
before paving. All angles and edges of the slabs shall be true square and
free iron chipping and giving a plane surface. The thickness shall be as
specified in the item.
Bedding for the white marble slabs shall be cement mortar 1:6 [1 cement :
6 coarse sand ] or L.M. 1:1.5 of thickness 20 mm as given in the
description ofthe item. Subgrade shall be cleaned wetted and mopped.
Mortar of the specified mix and thickness shall then be spread, on an area
sufficient to receive one white marble. The white marble shall be washed
clean before laying. It shall be laid on top, pressed, tapped genetly to bring
it in level with the other slabs. It shall than be lifted and laid aside. Top
surface of the mortar shall then be corrected by adding fresh mortar in
hollows or depressions. The mortar then be allowed to harden bit. Over
this surface, cement slurry of honey like consistency shall be applied. The
slab shall then be gently placed in position and topped with wooden mallet
till it is properly bedded in level with and close to the adjoining slab. The
joint shall be as fine as possible.The slab fixed in the floor adjoining the
wall shall enter not less than 10 mm. under the plaster, skirting or dedo.
The junction between the wall and floor shall be finished neatly. The
finished surface shall be in true levels and slopes as directed.
The floor shall be kept wet for a minimum period of 7 days so that bedding and joints
Polishing shall be normally commenced after 14 days of laying the
stone slab. First polishing shall be done with carborundum stone, of
grade grit fitted in the heavy machine and then second polishing shall be
done with carborundum stone 220 to 350 grade grit fitted in heavy
machine. Water shall properly be used during polishing. The stone shall
then be washed clean with water. When directed by the Engineer-in-
charge wax polish of approved quality shall be applied on the surface
with the help of soft cloth over clean and dry surface then the polishing
machinge fitted with beds shall be run over it.
The holes required for Nahni traps, pipes and any other fitting shall be made without
25.3.0 Mode of Measurements & payments:-
The rate shall include the cost of all materials and labour involved in all the
operations described above. The white marble flooring shall be measured in sqaure
metres correct to two places of decimal, length and breadth shall be measured
correct to a centimeters and between the finished face of skirting dedo or mall
plaster and no deduction shall be made nor extra paid for opening in floor of areas
The rate shall be for a unit of one sq.metre.
Providing & laying Black granite with crystal edge at window sill all floor
level, over 16mm av. Th.Base of C.M. 1:6 (1 cement : 6 sand ) laid over &
joined with grey cement slurry incl. Rubbing & polished comp. at all floor
Details specification same as per item No.25 but read granite instead of
white marble and as directed by Engineer-in-charge.
The rate shall be for a unit of one Sq.metre.
Prov. & Fixing Laminated Door of Marble / wall storage shutter with
teakwood frame using with 19mm th. BWP plywood, 1mm th. SF laminate,
teakwood edge biding, ss handles, hinges, magnate, lock & necessary hardware,
serews materials etc. complete as per instruction by engineer in charge.
The rate shall be for a unit of one Sq.metre.
Providing & making wooden partition using 08 mm thick commercial plywood with
01 mm thick laminate, 3" Ö 1" size teakwood frame, 3" Ö 0.5" molding patti, 08 mm
clear glass & necessary hardware material etc., french polish finish complete
respected by drawing & engineer-in-charge.( Plywood- Saras, Kitply, Uniply,
Anchor, Green, Wood Stock, Everest, Euro or Century), (Laminate - Green
Laminates, Century, New Mica make) (Size H 5'-0" x W 4'-0")
Details specification same as per item discription, manufacturer's details,
necessary fixtures and fastening etc. complete item and as directed by Engineerin-
charge. Payment should be made as per basis as per Schedule-B.
Providing & making wooden book display rack with storage using 18, 12, 06 mm
thick commercial plywood, 01 mm thick laminate finished all shutter, teakwood
patti, M S sliding bracket lock, handle & necessary hardware fitting, fixture material
etc. inside french polish finish complete respected by drawing & engineer-in-
charge's instructions. .( Plywood- Saras, Kitply, Uniply, Anchor, Green, Wood
Stock, Everest, Euro or Century), (Laminate - Green Laminates, Century, New Mica
make) (Size - H 7'-0" x W 6'-0" x D 1'-6")
Details specification same as per item discription, manufacturer's details,
necessary fixtures and fastening etc. complete item and as directed by Engineerin-
charge. Payment should be made as per basis as per Schedule-B.
Providing & making wooden reading table using 18 mm thick commercial plywood
top with 1.50" thick edge, 01 mm laminate, 3" x 3" Leg, 4" x 1.50" teakwood
framing, 1.50" x 0.50" patti, 1.50" x 1.50" M S Powder coated footrest & necessary
hardware material etc. french polish finish complete respected by drawing &
engineer-in-charge's instructions. .( Plywood- Saras, Kitply, Uniply, Anchor, Green,
Wood Stock, Everest, Euro or Century), (Laminate - Green Laminates, Century,
New Mica make) (Size - H 2'-6" x L 8'-0" x W 4'-0")
Details specification same as per item discription, manufacturer's details,
necessary fixtures and fastening etc. complete item and as directed by Engineerin-
charge. Payment should be made as per basis as per Schedule-B.
Providing & making wooden cubical reading unit using 18 mm, 12 mm thick
commercial plywood, 01 mm thick laminate, teakwood molding, liping, M S Powder
coated footrest & necessary hardware material etc. liping patti french polish finish
complete respected by drawing & engineer-in-charge's instructions. .( Plywood-
Saras, Kitply, Uniply, Anchor, Green, Wood Stock, Everest, Euro or Century),
(Laminate - Green Laminates, Century, New Mica make) (Size - H 4'-0" x L 8'-0" x
Details specification same as per item discription, manufacturer's details,
necessary fixtures and fastening etc. complete item and as directed by Engineerin-
charge. Payment should be made as per basis as per Schedule-B.
Providing & supplying PVC chair Cello/ supreme/ Nilkamal brand by approved
colour & design etc. complete in all respects.
Details specification same as per item discription, manufacturer's details,
necessary fixtures and fastening etc. complete item and as directed by Engineerin-
charge. Payment should be made as per basis as per Schedule-B.
REST OF THE ITEMS ARE SELF EXPLAINATORY AS PER SCHEDULE-B.
EXECUTIVE ENGINEER,
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
DECLARATION FORM
(1) I/We hereby declare that I/We have visited the site and fully acquainted myself/ourselves
with the local situation regarding materials, labour and other factors pertaining to the work
before submitting this tender.
(2) I/We hereby declare that I/We have carefully studied the conditions of contract, specifications and
other tender documents of this work and agree to execute the same accordingly.
Executive Engineer
North Zone(Katargam)
Surat Municipal Corporation
Signature of the Contractor:-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TB_Furniture of Ganeshpura Suman School.pdf
Interior Work_Suman School_SCH-B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .