Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.1 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹48.1 L+₹11.0 L (29.7%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹49.1 L+₹12.1 L (32.6%)Rejected-AOC 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | 3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Not fulfil all Documents as per NIT (Mentioned in Annexure) | |
| 5 | Rejected-Technical | - | Rejected-Technical Not fulfil all Documents as per NIT (Mentioned in Annexure) |
Tender Value
₹45.5 L
EMD Value
₹1.1 L
Closing Date
29 Jul 2024, 3:00 pmClosed
Superintending Archaeologist
Office of The Superintending Archaeologist ASI, The 22, Mall Road, Agra Circle
AS PER TENDER DOCUMENT
2024_ASI_816027_1
05/TAJ/03/2024-2025/W
Open Tender
AMC/ Maintenance Contracts
Works
270 days
TAJ MAHAL
AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹0
₹1.1 L
Yes
23 Sept 2024
11 Jul 2024
30 Jul 2024
11 Jul 2024
29 Jul 2024
11 Jul 2024
Amount
Provision for Routine Cleaning & Sweeping by manually / mechanically of the floor and roof area (Forecourt pathways upto gates, Forecourt, Royal gate area, East & West side dallan, Connecting Pathways East to West and South to North, Mosque, Mehman Khana, Chameli floor and East facility center and exhibition gallery( tunnel), West facility center and from West gate to Khan- E-Alam steel gate, Inner side of South gate and Eastern & Western Naubat Khana Platform) in Tajmahal Complex , picking up of shoe covers & water bottles etc. dropping of pigeons, removal of Cob-webs, vegetational growth from pathways and special cleaning for wooden steps and around ramps daily including also cleaning in 4 Nos. Saheli burj, close portion (South side wall roof, Gaushala and Glass house roof, East & West side dallan's roof, East and West side Naubat Khana roof, Main Mausoleum, Mosque and Mehman Khana roof, Under ground cells, Royal gate roof, Watch tower (Burji) and step in minars) and also cleaning of dust up to height 2.40 mtr. in whole complex. Daily cleaning of approximate 65000 Sqm area all-round the tourist hours i.e. from sunrise to sunset ( Approximate 12 hours) and weekly cleaning of the closed area of approximately 20000 sqm with required strength of Safai Karmchari/ equipment with proper supervision). The work will include following scope of work – (1. Ensuring regular cleaning during the tourist hours from sunrise to sunset. The site required to be cleaned properly at the time of sunrise once the visitors gets entry into the monuments premises either by manually or mechanically. 2. Cleaning and washing of approximate 50 nos. dustbins on daily basis and collection of garbage from dustbin on hourly basis. 3. Cleaning of stone panels carefully with cotton dusters. 4. Cleaning of Stone Jali with Paint Brush. 5. Picking up of all the littering as Shoe Cover, Water Bottles, Mask etc. during the tourist hours. For Financial Year 2024-2025 – List of Materials to be supplied per Month. :- 1- Sutli-0.50 Kg, 2- Phoonse -25Kg, 3- Surf Detergent – 10.00Kg, 4-Brush 4” -4.00 Nos., 5- Cotton Duster 24”-15.00Nos., 6- Plastic Bucket 10 Ltr capacity (White)-2.00 Nos., 7- Paint Brush 4”- 2.00 Nos, 8- Nariyal Broom- 25.00 Kg. (Rate Including GST). Note-Use of Hard Materials in Sweeping not allowed Monument floor. 2- Detergent and Acid are not allowed on Monument Surface.
Provision for Routine Cleaning & Sweeping by manually / mechanically of the floor and Main Mausoleum Complex of Taj Mahal approximate area (10000 Sqm) also cleaning of dust up to height 2.40 mtr. in whole complex on daily basis all-round the tourist hours i.e. from sunrise to sunset ( Approximate 12 hours) with sufficient number of Safai Karmchari/equipment. The work will include following scope of work – (1. Ensuring regular cleaning during the tourist hours from sunrise to sunset. The site required to be cleaned properly at the time of sunrise once the visitors gets entry into the monuments premises either by manually or mechanically. 2. Cleaning and washing of approximate 8 nos. dustbins on daily basis and collection of garbage from dustbin on hourly basis. 3. Cleaning of marble panels carefully with cotton dusters. 4. Cleaning of Stone Jali with Paint Brush. 5. Cleaning of collected water with sponge during rainy season. 6. Proper cleaning of signage boards on daily basis. 7. Picking up of all the littering as Shoe Cover, Water Bottles, Mask etc. during the tourist hours. For Financial Year 2024-2025. List of Materials to be supplied per Month. 1-Sutli-0.50Kg, 2- Surf Detergent-2.00 Kg, 3- Cotton Duster 24”-2.00 Nos., 4- Sponge Duster floor cleaning telescopic handle squeezed absorber sponge cleaner 11” for absorbing of collected water-1.00 Nos., 5- Plastic Bucket 10 Ltr. Capacity (White)- 1.00 Nos. (Rate Including GST). Note-Use of Hard Materials in Sweeping not allowed Monument floor. 2- Detergent and Acid are not allowed on Monument Surface.
DBS Engineers Pvt. Ltd.
P A SALES CORPORATION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .