Tender Value
Refer Docs
EMD Value
₹43,800
Closing Date
6 Jul 2023, 4:00 pmClosed
Block Development Officer(V.P)
Block Development Office, Thogamalai
Construction of CC Road, Waiting shed, Cycle stand and Drainage 9 Nos of work in Alathur Panchayat
2023_RDTN_334239_1
Thogamalai Block - AGAMT-II-2023-24
Open Tender
Civil Works
Item Rate
90 days
Thogamalai Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹43,800
Yes
19 Jul 2023
1 Jul 2023
6 Jul 2023
1 Jul 2023
6 Jul 2023
1 Jul 2023
Amount
Name of the Work : Provding Cement Concrete Pavement @ Alathur AD Colony Sekar House to Lakshmanan House H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for Bitumen Pad for Each 5.00M
Name of the Work : Provding Cement Concrete Pavement @ Koppanaickenpatty Sheelanaiker House to Perumal House H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for Bitumen Pad for Each 5.00M
Name of the Work : Provding Cement Concrete Pavement @ Alathur AD Street Subramani House to Nagaraj House H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for Bitumen Pad for Each 5.00M
Name of the Work : Provding Cement Concrete Pavement @ Vadakkupatty Kalidas House to Dhanapal House H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for Bitumen Pad for Each 5.00M
Name of the Work : Provding Cement Concrete Pavement @ Alathur Archunan House to Sarasu House H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for Bitumen Pad for Each 5.00M
Name of the Work : Improvements of Burielground Construction of WAITING SHED Near Saamathuva Mayanam @ Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation and basement with filling excavated earth in larges of not more than 15 cm thick well rammed watered and compacted including & conveyance and all labour charges etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3, mix using 20 mm HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with C.M 1:3, mix 10mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Paving the floor with Vetrified tiles 0.60m x 0.6m x 0.08m in all floors over a base layer of cement mortar 1:3 (one cement and three sand) 20mm thick laid in-situ and pointed with same coloured cement as
Paving the flooring with step tiles in CM 1:3, 20mm thick in all floors over a base layer of cement mortar 1:3 (one cement and three sand) 20mm thcik laid in-situ and poineted with same coloured cement as
Providing weathering course with best quality of brick jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab, the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thickness
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with, CM 1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc
Distembering two coats of oil bound distember using one coat of primer coat including coat & conveyance to size and all labour charges etc., complete
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
Sub Estimate-Cement Concrete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Provision for Bitumen Pad for Each 5.00M
Name of the Work : Provding of Cycle Stand at Alathur Govternment Higher Secondary School H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying fabricating and placing in position of steel angles and tubular section including cost of steel and binding wire also in all floors etc., complete (50mm MS Pipe)
Supplying fabricating and placing in position of steel angles and tubular section including cost of steel and binding wire also in all floors etc., complete (Round Pipe - 35mmx35mm)
Supplying fabricating and placing in position of steel angles and tubular section including cost of steel and binding wire also in all floors etc., complete (Round Pipe - 50mmx35mm)
Roofing with GI sheet 0.3mm thick including cost and conveyance of all materials in all floors etc., as directed by departmental officers etc., complete complying with standard specifications
Name of the Work : Construction of Drainage with Horizontal Soakpit @ Alathur OHT to Sangili House H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3, mix using 20 mm HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Sub Estimate-Community Soak Pit
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete
Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and filling with 20mm metal from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Supplying and filling with 40mm metal from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Supplying and filling with Filling sand from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Supplying and filling with Red Gravel from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Colour washing two coats using with approved colour including cost and conveyance materials and all labour charges etc.,
Supplying and Delivery of 110mm Dia 6Ksc PVC Pipe including cost and conveyance materials and all labour charges for filling etc., complete.
Reinforced Cement concrete 1:1.5:3, mix using 20 mm HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete.
Name of the Work : Construction of Drainage @ Vadakkuppatty Babu House to Errachi House with Soakpit H/O Alathur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Sub Estimate-Community Soak Pit
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete
Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and filling with 20mm metal from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Supplying and filling with 40mm metal from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Supplying and filling with Filling sand from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Supplying and filling with Red Gravel from an approved quarry including all cost and conveyance materials and all labour charges etc., complete with Standard Specification.
Colour washing two coats using with approved colour including cost and conveyance materials and all labour charges etc.,
Supplying and Delivery of 110mm Dia 6Ksc PVC Pipe including cost and conveyance materials and all labour charges for filling etc., complete.
Reinforced Cement concrete 1:1.5:3, mix using 20 mm HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M.Pandian Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .